background image

1360 ROW CLEANER WITH  TWO UNIT MOUNTED FERTILIZER OPENERS 

Martin Planter Attachments 

Martin Industries LLC

 

206 Elk Fork Road

 

Elkton, KY 42220

 

Telephone: 270

-

265

-

5817

 

E

-

Mail: [email protected]

 

 

 

 

 

 

 

www.martintill.com                              

VERSION 04 23 2018

 

INSTALLATION INSTRUCTIONS 

SHOWN WITH DDU MOUNT AND OPTIONAL SMARTCLEAN CYLINDER 

AND BRACKETS, RAZOR WHEEL(RTW1412.5) , SIDE TREADER WHEELS 

(

STW

-

04 ) 

& CAM ADJUST

 (CA03

-

D)

 

DUAL UMO-1360 

Summary of Contents for DUAL UMO-1360

Page 1: ...s LLC 206 Elk Fork Road Elkton KY 42220 Telephone 270 265 5817 E Mail martin martintill com www martintill com VERSION 04 23 2018 INSTALLATION INSTRUCTIONS SHOWN WITH DDU MOUNT AND OPTIONAL SMARTCLEAN CYLINDER AND BRACKETS RAZOR WHEEL RTW1412 5 SIDE TREADER WHEELS STW 04 CAM ADJUST CA03 D DUAL UMO 1360 ...

Page 2: ...e shown UMO installation positions A B or C and attach the right UMO to the mount using 1 2 X 2 1 2 bolts and tighten the 1 2 flange nuts to 80 ft lbs Position A The top bolt passes through the first holes of the mount and the UMO The bottom bolt passes through the fifth hole of the mount and the forth hole of the UMO This position will place the ferti lizer 3 4 above seed depth Position B RECOMME...

Page 3: ...2 Position A 3 4 above seed depth Position B Even with seed depth Recommended Position C 3 4 below seed depth ...

Page 4: ...s from inside and tighten the three bolts to 112 ft lbs Check after first day of use 3 Check to ensure the frame is not binding on the mounting bracket and is free to float up and down 4 install the 5 8 X 3 bolt on the Stop Arm as factory threaded adjustment assembly and tighten the 5 8 Thin Nut to lock it after the adjustment STEP 2B INSTALLING THE LEFT UMO AND AIR CYLINDER TOP BRACKETS Attach th...

Page 5: ... BU7858 5 8 X 2 FLANGE BOLTS B5F58NC2 5 8 X 2 1 2 FLANGE BOLTS B5F58NC212 5 8 FLANGE LOCKNUT N58FLN STOP ARM STARM1360 5 8R 5 8 Thin Nut N58CNLT 5 8 X 2 FLANGE BOLTS B5F58NC2 IMPORTANT FLUSH THESE SURFACES BEFORE TIGHTENING THE BOLTS ...

Page 6: ...running the left wheels in the rear hole on the half of the plant er and the right wheels in the rear hole on the other half of the planter when viewed from behind STEP 4 DETERMINE THE BEST WHEEL CONFIGURATION FOR YOUR SOIL CONDITIONS OPTION A INTERSECTED Both wheels in front hole Both wheels forward provides maximum cleaning effect The interlocked wheels till the middle of the seed row ...

Page 7: ...R STEP 5 INSTALL SMART CLEAN CYLINDER BOTTOM ANCHOR IMPORTANT Skip to Step 6 if optional SmartClean System was not purchased If the optional SmartClean cylinder was purchased install the SmartClean cylinder bottom anchor before in stalling the wheels as shown below Proper location of the bottom anchor mounting bolts is determined by the wheel configuration you ve chosen The anchor is installed on ...

Page 8: ...EEL ASSEMBLIES IMPORTANT Skip to Step 6C if not using optional D Lock Deflector Scraper NOTE The D Lock Deflector Scraper is recommended in place of the standard D Lock when operating in wetter conditions or damp stringy residue to reduce wrapping NOTE Either the D Lock deflector illustrated below and on next page or the D Lock illustrated on page 13 must be installed to allow the 5 8 bolt to tigh...

Page 9: ... Attach the D lock deflector DLD 02L to the end of the hub axle making sure it is flush with the end of the axle before bolting the axle to the frame For placement of 5 16 stop bolt see fig ure on previous page 2 Secure the hub to the frame with the 5 8 flange patch bolt Using a torque wrench tighten to 112 ft lbs Re tighten after first day s use 3 Install the wheel part to the outside and side tr...

Page 10: ...rt to the outside and side treader wheel on the hub using the four car riage bolts and flange nuts Torque to 23 ft lbs Re tighten after first day s use 4 The wheel marked RTW1412 5R4 Razor wheel orTW3813 R4 Spike wheel is for use on the right side of the frame as viewed from behind the machine Repeat for opposite side 9 HUB HA44270 D 3 8 FLANGE NUT N38CFL RIGHT HAND 4 HOLE WHEEL RTW1412 5 R4 FRAME...

Page 11: ...ely against the cam 10 1 2 x4 Bolt B5M12NC4 KNOB CA 32 SPRING CA 34 3 8 BUTTON HEAD BOLT X 4 B5B38112 1 2 FLANE NUT N12CFL CAM BLOCK CA 31 CAM CA 30 STEP 8 INSTALL THE OPTIONAL SMARTCLEAN CYLINDER Install the SmartClean cylinder between the top and bottom brackets Use thicker 7 16 pin on the top brackets and thinner 3 8 pin on the bottom bracket as shown in the picture below Smartclean Cylinder SC...

Page 12: ... 1360 HUB ASSEMBLY HA44270 D 11 AXLE A270 SEAL CR14971 BEARING RACE L44610 HUB HU44 R WASHER W34F NUT N34NCS DUST CAP HS1328 BEARING RACE L44610 COTTER PIN CP532114 BEARING L44643 BEARING L44643 Grease fitting GF 01 ...

Page 13: ...UT N58 TRANSITION WASHER UMO BSH01 LEVER UMO FCL01 5 16 NUT N516FLN BRACKET UMO FCB01R FURROW CONTROL STRAP UMO FCS01 REINFORCEMENT STRAP UMO FCS02 5 16 FLANGE NUT N516FLN 5 8 LOCK NUT N58CNL SEAL CR14971 SEAL CR14971 RACE L44610 SPRING UMO SPG01R AXLE UMO A77 BEARING L44643 RACE L44610 BLADE UMO BLD01 BEARING L44643 3 8 X 1 CARRIAGE BOLT B5C381 HUB HU44 F 1 2 X 3 FLANGE BOLT B8F12NC3 1 2 NUT N12F...

Page 14: ...dium ground pressure SETTING 3 This configuration provides the least ground pressure NOTE This is the default and recom mended position FURROW CONTROL LEVER GROUND PRESSURE ADJUSTMENT SETTING 1 This configuration provides maximum ground pressure ...

Page 15: ...cked by pulling out on the top of the wheel while pushing in on the bottom UMO 100 Hub Preventative Maintenance The UMO hub is designed to be flushed out with lubrication without damaging the triple lip seal To flush the hub lubricate until fresh grease is visible around the seal In worked ground lubricate every 20 hours of run time In No Till ground lubricate every 40 hours of run time NOTE Hubs ...

Page 16: ...Martin Industries LLC 206 Elk Fork Road Elkton KY 42220 Telephone 270 265 5817 E Mail martin martintill com The most trusted name in no till Established 1991 ...

Reviews: