background image

 

 

 

MKD4   

DOGFISH Instructions 

 

1. Take sides/ends (A) and fold to shape (drw1), next take the two side-end assemblies and solder 
together to form hopper body. (drw 2). 
 
2.  Take  solebars  (B)  and  fold  to  L  shape,  so  that  the  half  etch  detail  forms  the  long  part  of  the  L 
shape and the full etch forms the base of the L shape. Therefore fold along the joint between half and 
full etch see plan. Then take chassis (C), push out rivet detail on buffer beams. Now fold up bottom 
lip on buffer beam then fold buffer beam thru 90 deg. Also fold hopper bottom sides through 90 deg. 
(drw 2). 
 
3.  Next  solder  solebars  to  chassis  (C)  between  buffer  beams  and  up  against  hopper  bottom  sides. 
(drw 2). 
 
4. Now fold inner chassis members up to form 

 section channel. 

 
5. Next fit hopper body into chassis assy. The tabs (X) fit into the slots (X) with the base end of the 
hopper body resting on the chassis. (drw 2). 
 
6. Now take side stanchions (D) these fit into slots (Y) on body sides, when fitted add plates (E) to 
body side, these fit to half etched slots in sides and fit over top of stanchions (D). (See photos and 
drw 2/3/4).  
 
7. Now take end stanchions (G) 4 of and fit into slots (Z) on hopper ends. (Drw 2/3). 
 
 
8. Next take end stanchions (F) and fold to shape, which fit into the half-etched recesses at outside 
edges of body. (drw 2/3). 
 
9. Now solder outer end stanchions (M) fold to shape (2 of, note that they are handed) from hopper 
body to chassis at deep end of hopper body. (drw 3/5). 
 
9a. At this stage you can fit the discharge floor assy. Fold up floor etch to shape to match the profile 
piece  supplied  (side  a  to  side  a).  This  then  fits  into  bottom  of  hopper  body  also  noting  which  way 
round see drawing 5. 
 

Reviews: