background image

Warranty void if not installed as per installation instructions

INSTALLATION INSTRUCTIONS

Lumascape Lighting Industries Pty Ltd

38-44 Enterprise Street, Cleveland, QLD 4163, Australia

PO Box 1875, Cleveland D.C., QLD 4163, Australia

  07 3286 2299

F

   07 3286 6599

E

   [email protected]

W

  www.lumascape.com.au 

IN0040 - 23 October 2013

Copyright ©2013 Lumascape Lighting Industries Pty. Ltd.   ABN 21 010 572 773

www.lumascape.com.au

LS333ANS-2: 

Underwater Luminaire

A.C.N. 0105 72 773

MODEL: 

LS333ANS-2

INPUT VOLTAGE: 

12 V AC

UNDERWATER

tighten gland

tapped brackets

luminaire

1.

3.

Run Conduit & Water Proof

Connect conduit to conduit entry with suitable 
conduit sealant. Use supplied adaptor if necessary. 
Run the conduit to  the power supply above water 
level and ventilate to prevent siphoning.

7.

Terminate Luminaire

Firmly tighten cable gland on the inside of 
niche to seal cable entry (Figure 2).  Connect 
to a suitable power supply in accordance with 
local wiring rules for connection and location 
of supply. Where it is necessary to joint cables 
underwater the connections and cables must be 
IP68 rated

8.

Install Lamp & Test Luminaire

Open luminaire and install lamp as per re-lamping 
instructions on next page. Test the luminaire for 
correct operation.

Important Note

Do not locate luminaire near heat sources.
Chlorine levels must be kept below 4 parts per 
million. Higher levels may cause corrosion to the 
luminaire and void warranty.

10.

9.

Install Luminaire

Coil free cable inside niche and install luminaire 
in niche by screwing long outer cover screws 
into niche brackets (Figure 3). Coil cable inside 
luminaire with care. Do not double coils over, or 
luminaire will be difficult to remove from niche.

4.

Install Temporay Shield on Niche 

Fit fibreboard shield to opening of 
niche before concreting (Figure 1). 
Ensure no concrete enters niche.

5.

Concrete-in Niche

Encase niche and conduit in concrete. Once in 
place, finish surface of pool flush with front of 
niche.

6.

Concrete-in Niche

Feed cable into niche, allowing sufficient free 
cable in niche to allow the luminaire to be placed 
on the poolside for re-lamping and maintenance. 
A maximum of 1.3 m of cable can be coiled 
inside the niche.

2.

Installation Preparation

Locate niche in pool and wire to 
reinforcing bars.  

The 20 mm conduit entry 
should be at top of niche 

(Figure 

1). Although some variation is 
accommodated by the outer cover 
system on the luminaire, care 
should be taken to position the 
niche level and to allow for pool 
finishing materials.

fibreboard shield

finished surface

reinforcing bars

concrete

AVOID HIGH

CHLORINE LEVELS

NO POWER 

TOOLS

WARNING

DANGER

ISOLATE LUMINAIRE FROM POWER

Failure to isolate power 

supply before installation or 

maintenance may result in 

fire, serious injury, electric 

shock, death and may 

damage the luminaire.

The luminaire should only be used 

complete with its protective  

shield (cover)

Do not shorten, interfere or 

disconnect cable from luminaire.

Warranty will be void if cable 

assembly is tampered with.

WARNING

Figure 3

Figure 2

Figure 1

INSTALL AWAY FROM

OTHER HEAT SOURCES

Power supply must be isolated prior to connection 

or disconnection of cables. Failure to do so will 

result in damage to the luminaire components.

Installation Preparation

To aid installation of the cable the number of elbows 
and bends should be kept to a bare minimum. Also, 
using 25 mm conduit is highly recommended. Check 
cable length required, taking into account voltage 
drop and distance to transformer. 

NOTE:

 In Australia, 

each luminaire must be installed as detailed in 
AS3000 Clause 6.4.4.5

Reviews: