background image

Thank you for purchasing the Lil Jumbl 3-Floor Wooden Dollhouse with Elevator and 

12-Piece Accessory Set. This User Guide is intended to provide you with guidelines to 

ensure that operation of this product is safe and does not pose risk to the user. Any 

use that does not conform to the guidelines described in this User Guide may void 

the limited warranty.

Please read all directions before using the product and retain this guide for reference. 

This product is intended for household use only. It is not intended for commercial use.

This product is covered by a limited one-year warranty. Coverage is subject to limits 

and exclusions. See warranty for details.

SKU: LIJDOLHOUS01

3-Floor Wooden Dollhouse with 

Elevator & 12-Piece Accessory Set

User Guide

10

10

8

WARNING:

Adult assembly required. Keep away 

from children when assembling

WARNING:

CHOKING HAZARD

Small parts

Not for children under 3 years.

Summary of Contents for LIJDOLHOUS01

Page 1: ...d warranty Please read all directions before using the product and retain this guide for reference This product is intended for household use only It is not intended for commercial use This product is covered by a limited one year warranty Coverage is subject to limits and exclusions See warranty for details SKU LIJDOLHOUS01 3 Floor Wooden Dollhouse with Elevator 12 Piece Accessory Set User Guide ...

Page 2: ...n to tip the product over This can cause injury to children and damage to the product Do not drag the product to avoid damaging your floor and the base of the product Instruct children on proper use of this product Do not use in a manner other than intended Keep pets away from the product to avoid it tipping over and causing injury to pets children and product damage Do not allow children to climb...

Page 3: ...Package Contents 1PC 1PC 1PC 1PC 1PC 1PC 1PC 1PC 1PC 1PC 1 6 5 2 3 7 4 8 9 10 ...

Page 4: ...Package Contents continued 1PC 1PC 1PC 1PC 1PC 1PC 1PC 1PC 1PC 11 1PC 1PC 1PC 1PC 1PC 1PC 19 12 14 13 18 20 15 21 22 16 17 24 25 26 ...

Page 5: ...Package Contents Hardware continued 1PC 1PC 1PC 1PC 2PCS 3PCS 1PC 33 32 30 31 27 28 29 17PCS A 36PCS B 4PCS C 2PCS D 3PCS E 4PCS F ...

Page 6: ...Accessories Package Contents continued 1PC 1PC 2PCS 1PC 1PC 1PC 1PC 1PC 10PCS 1PC 1PC Recommended Tools Philips head screwdriver x2 not included Wrench not included ...

Page 7: ...are pointed downward The slots on each wall should be on the inside facing towards each other In order to know the elevator is facing the right direction the elevator opening should be faced towards you and the wooden notches on wall 14 should point to your right Also the side with the beautiful design on elevator floor 13 should be faced up towards walls 14 and 15 B B B B B x4 ...

Page 8: ...15 Step 2 Slide the back panel 16 in between walls 14 and 15 using the slots on the walls 16 14 ...

Page 9: ...12 to the top of elevator walls 14 and 15 using four 4 B screws B x4 NOTE The beautiful design on the elevator ceiling 12 should be faced down and the flooring design on the other side should be faced up when connecting this part 14 12 B B B B ...

Page 10: ...l 6 using two 2 B screws CAUTION The front roof panel 6 can be damaged or broken easily Handle the front roof panel 6 with care B B B x2 25 NOTE Use the two 2 holes adjacent to the triangular cutout found near the center of the front roof panel 6 to attach the preassembled dormer 25 ...

Page 11: ...Step 5 Fasten the first piece of roof overhang 21 to roof frame 19 with two 2 B screws B B 19 B x2 21 NOTE Make sure both holes are lined up between both pieces before fastening the parts in place ...

Page 12: ...21 20 Step 6 Fasten the second piece of roof overhang 20 to roof frame 19 with two 2 B screws B 19 B B x2 NOTE Make sure both holes are lined up between both pieces before fastening the parts in place ...

Page 13: ...6 19 20 C C C C C x4 21 Step 7 Fasten the assembled dormer 19 21 to front roof panel 6 using four 4 C screws ...

Page 14: ...ower level left wall 1 on the side with the interior design on the wall D x2 1 NOTE The D screw is one screw with two parts the outlet and inlet bolt Place the outlet bolt in the holes from the lower level left wall 1 side Then insert and screw in the inlet bolt from the upper level left wall 17 side Also keep in mind when you do this you may need to use two 2 screwdrivers to properly insert the D...

Page 15: ...g one 1 A screw A A x1 Step 9 NOTE The first floor front border 32 has a slot that should face inward towards first floor backwall border 31 Make sure that the hole on the first floor front border 32 is on the far right with the smaller opening of the hole facing up and the bigger opening facing down 32 ...

Page 16: ...l border 33 to the bottom back corner of lower level left wall 1 using another A screw A A x1 Step 10 NOTE The first floor backwall border 33 should have one of its slots facing first floor front border 32 and the other slot facing upward ...

Page 17: ...s towards the top when installing the pillar The smaller opening of the hole should face left while the bigger opening of it should face right A Fasten the first floor pillar 24 to the hole on the first floor front border 32 using one 1 A screw 32 24 A Step 11 ...

Page 18: ...8 NOTE Make sure the part is not fastened upside down by looking at the design 11 Fasten the first floor interior wall 11 to first floor flooring 8 using two 2 B screws B B B x2 Step 12 ...

Page 19: ... connected first floor interior wall 11 in between first floor front border 32 and first floor backwall border 33 NOTE Make sure when sliding in the first floor flooring 8 that the first floor interior wall 11 ends up in the back over the first floor backwall border 33 32 11 ...

Page 20: ... to the holes on lower level left wall 1 and place the flooring on top of first floor pillar 24 and first floor interior wall 11 Then fasten the second floor flooring 9 to lower level left wall 1 using two 2 A screws 11 1 10 24 Step 14 x2 9 A A ...

Page 21: ...A x1 Fasten the second floor flooring 9 to first floor pillar 24 using one 1 A screw 10 A 24 Step 15 9 ...

Page 22: ...11 B x2 Fasten the second floor flooring 9 to first floor interior wall 11 using two 2 B screws 10 B B 24 Step 16 9 ...

Page 23: ...B Fasten the railing 26 onto the third floor flooring 10 using one 1 B screw NOTE Make sure the rug design on the third floor flooring 10 is facing up x1 Step 17 B 10 26 ...

Page 24: ... Fasten the stairs pillar 31 onto the second floor flooring 9 using one 1 A screw x1 A Step 18 10 9 A 31 ...

Page 25: ...r flooring 10 onto lower level left wall 1 using one 1 A screw Then fasten the front end of the third floor flooring 10 onto stairs pillar 31 using one 1 A screw Finally fasten the top of the stairs pillar 31 to the railing 26 using one 1 A screw NOTE Make sure the big opening of the holes on the stairs pillar face outward to make it easier to insert the screws 1 10 x3 A Step 19 A A A 31 10 26 ...

Page 26: ... Slide in the second floor backwall 3 in between second floor flooring 9 and third floor flooring 10 NOTE Make sure design is not upside down before sliding in the backwall 3 Step 20 10 10 9 ...

Page 27: ... Slide in the first floor backwall 4 in between first floor backwall border 33 and second floor flooring 9 4 NOTE Make sure design is not upside down before sliding in the backwall Step 21 10 9 33 ...

Page 28: ...5 10 10 Slide in the third floor backwall 5 onto third floor flooring 10 Step 22 10 ...

Page 29: ...17 5 A 10 10 Place the third floor backwall border 29 onto the third floor backwall 5 and fasten the left end of the third floor backwall border 29 to upper level left wall 17 using one 1 A screw x1 A Step 23 ...

Page 30: ...12 16 Slide the assembled elevator 12 16 onto the elevator slider 30 using the wooden notches on the side of the assembled elevator 12 16 Step 24 30 ...

Page 31: ...ll 2 using three 3 E screws NOTE The three 3 holes on the lower level right wall 2 used for this step are tiny and hard to see They are found only on the interior side of the lower level right wall 2 They run along the wall vertically and are found towards the center near the windows Don t use the holes on the edges of the wall for this step x3 E Step 25 30 E E E ...

Page 32: ...econd floor flooring 9 and third floor flooring 10 using five 5 A screws NOTE Make sure the assembled elevator is still and placed on the ground Screw on the lower level right wall with care The assembled elevator can fall apart if handled roughly or improperly A x5 A 10 10 Step 26 A A A A 32 10 10 9 33 ...

Page 33: ...rder 29 using one 1 A screw Then fasten the bottom of the upper level right wall 18 to the third floor flooring 10 using two 2 B screws NOTE Make sure the upper level right wall is placed correctly by checking the design on the part A x1 A x2 B 10 10 Step 27 29 10 18 B B ...

Page 34: ... B B 27 2 x2 B 10 10 Slide the first balcony wall 27 in between the front end of upper level right wall 18 and lower level right wall 2 Then fasten the first balcony wall using two 2 B screws Step 28 27 18 ...

Page 35: ... 27 2 x2 B 10 10 Slide the second balcony wall 27 in between the back end of upper level right wall 18 and lower level right wall 2 Then fasten the second balcony wall using two 2 B screws Step 29 18 B B ...

Page 36: ... panel 7 onto the upper level left wall 17 and upper level right wall 18 using four 4 B screws B B B B 17 NOTE Make sure the back roof panel 7 is placed correctly by looking at the design of the part x4 B 10 10 Step 30 18 7 ...

Page 37: ...anel onto the upper level left wall 17 and upper level right wall 18 using four 4 B screws B B BB NOTE Make sure the assembled front roof panel slightly overlaps the back roof panel before screwing in the part 17 x4 B 10 10 Step 31 18 8 ...

Page 38: ...asten the three 3 decorative corner frames 28 to the left top corner of the first floor the right top corner of the second floor and the right top corner of the first floor using three 3 B screws Step 32 28 28 28 8 B ...

Page 39: ... Insert the stairs 22 on the left side of the second floor of the dollhouse Step 33 8 22 ...

Page 40: ...s Then fasten overhang hook to headboard using one 1 F screw Then place drapes over bed by hanging it from the overhang hook of the headboard NOTE The headboard is the piece with a long stem and should be attached to the end of the bed with the pillow x5 F Step 34 F F F F F ...

Page 41: ... Dollhouse comes with several pieces of toy furniture like chairs table and so on Display them wherever you would like within the dollhouse And with that your dollhouse is complete Step 35 10 10 8 ...

Page 42: ... desk 1 piano and 1 piano stool Legs included No Number of legs 0 Dolls included No Windows included Yes Number of windows 4 Elevator included Yes Balcony included Yes Stairs included Yes Number of floors 3 Number of rooms 4 Age group Kids 3 10 years old Power source required No Location Indoor or outdoor use Installation required No Adult assembly required Yes Additional tools required 2 screwdriv...

Page 43: ...chase by the original end user purchaser Warranty Period If a hardware defect arises and a valid claim is received within the Warranty Period the Company at its sole option and to the extent permitted by law will either 1 repair the Product defect at no charge using new or refurbished replacement parts 2 exchange the Product with a Product that is new or which has been manufactured from new or ser...

Page 44: ...RTHER DISCLAIMS ALL WARRANTIES AFTER THE EXPRESS WARRANTY PERIOD STATED ABOVE YOU USE THE PRODUCT AT YOUR OWN DISCRETION AND RISK YOU WILL BE SOLELY RESPONSIBLE FOR AND THE COMPANY DISCLAIMS ANY AND ALL LOSS LIABILITY OR DAMAGES RESULTING FROM YOUR USE OF THE PRODUCT NO ADVICE OR INFORMATION WHETHER ORAL OR WRITTEN OBTAINED BY YOU FROM THE COMPANY OR THROUGH ITS AUTHORIZED SERVICE PROVIDERS SHALL ...

Reviews: