background image

LIGHT PROGRESS 

 

 

 

 

 

 

 

 

 

STICK-AL [eng] 

 

 

Nov-2019 

 

Pag. 1/16

 

 

INSTRUCTIONS 

 
 

UV-STICK...AL 

 
 

Germicidal UV-C Device with serial connection for AHU Disinfection 

 

 

 

MODELS: 

 

UV-STICK-E40H-AL 
UV-STICK-E60H-AL 
UV-STICK-E75H-AL 

UV-STICK-E100H-AL 

UV-STICK-E150-AL 

UV-STICK-E150H-AL 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Summary of Contents for UV-STICK AL Series

Page 1: ...eng Nov 2019 Pag 1 16 INSTRUCTIONS UV STICK AL Germicidal UV C Device with serial connection for AHU Disinfection MODELS UV STICK E40H AL UV STICK E60H AL UV STICK E75H AL UV STICK E100H AL UV STICK E...

Page 2: ...ning ensure that the appliance is switched off and unplugged from the mains supply Should the appliance become faulty please contact our authorized Service Centre direct and in case of repairs ask for...

Page 3: ...ice in case of passage of property and accompany the device until its demolition It s possible to contact Light Progress technical office to ask for updated instruction manuals and information DEMOLIT...

Page 4: ...by UV C ultraviolet rays When activated it generates a strong reduction of microbes in the air and on the irradiated surfaces For instance with the model UV STICK E75H NX in 2 3 seconds a reduction o...

Page 5: ...likely to develop resistant microbial forms with consequent danger to human health c ELIMINATION OF MICROBIAL LOAD The food and its container can be irradiated by UV C rays to significantly reduce th...

Page 6: ...lmost in central position The installation of several units should be carried out so as to distribute them uniformly in the environment to avoid the hidden areas such as the corners it should allow al...

Page 7: ...The connection to the electrical line must be made by a 3 x 1 mm2 supplied cable See fig Be sure that the device will be installed where it will fit with the existing environmental conditions To avoid...

Page 8: ...connector on the device always checking that the pins are positioned in a way that pin 1 engages perfectly in pin 2 Be careful that an excessive effort in the coupling is indicative of an incorrect i...

Page 9: ...ing and let them slide along the lamp grab the lamp at the 2 ends and pull it in a direction parallel to the tube Repeat the steps in reverse to insert the new lamp TROUBLESHOOTING UV LAMP See MAINTEN...

Page 10: ...to 100 TREATED SURFACE m2 from 7 to 13 from 10 to 17 from 14 to 25 from 17 to 27 from 17 to 27 from 20 to 38 WEIGHT Kg 1 4 1 7 2 2 2 7 3 1 3 4 SPARES PART UV LAMP Code CHS 40WH CHS 60WH CHS 90WH CHS...

Page 11: ...or repairs made by unauthorized personnel For defective materials return you must request the return merchandise authorization RMA sending an email to info lightprogress it or calling the number 39 05...

Page 12: ...ry Guards General Requirements for the Design and construction of fixed and movable guards UNI EN ISO 13849 1 2016 Safety of Machinery Parts of the Control System related to the Safety Part 1 General...

Page 13: ...____________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________...

Page 14: ..._________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ _______________________...

Page 15: ..._________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ _______________________...

Page 16: ...Nov 2019 Pag 16 16 Loc San Lorenzo 40 52031 ANGHIARI AR ITALIA TEL 0575 74 92 55 FAX 0575 78 99 29 PRODUZIONE ANGHIARI Loc San Lorenzo 40 CASTIGLION F NO Loc S Antonino 40 Http www lightprogress it E...

Reviews:

Related manuals for UV-STICK AL Series