FITTING INSTRUCTIONS

1

Summary of Contents for KuroLok RL

Page 1: ...FITTING INSTRUCTIONS 1...

Page 2: ...gs suitable for the substrate you are fixing to these are not provided There will also be an orange bag containing any small critical items This is likely to contain the controls for the blind if thes...

Page 3: ...allers responsibility to ensure that suitable fixings are used to secure the blind in place It is the installers responsibility to ensure safety is always maintained A full risk assessment must be car...

Page 4: ...arrow Pull the cord to rotate the spool inside the CTS until you see the hole in the spool line up with the locking point Insert a pin through the locking point into the spool to lock the CTS for a l...

Page 5: ...al Some of the other fixing options are shown below but should only be considered by installers that have received training for these fitting methods Reverse orientation face fix outside the reveal Re...

Page 6: ...ure the blind operates correctly STEP 1 6 Begin by fitting angle at the end of the recess opening where the roller blind and motor will be located This is the start of the shelf Offer the other 3 leng...

Page 7: ...e until the end of the installation STEP 2 Preparing your blind Remove the front cover from the tension end by hinging up by approx 8mm and sliding back slightly to release it Leave the front cover on...

Page 8: ...8 Slide the side channels onto the steel legs of the headbox end cheeks to form a rectangle on the floor STEP 3 Assembling your blind...

Page 9: ...ock the tension by inserting it into the locking point indicated by the sticker After you put this into the hole allow a bit of cord to go back into the box until the tension locks against the screw d...

Page 10: ...of the cord over the stand off on the hembar endcap Do not let it fall off whilst the tension is locked at the CTS Units Attaching the tension cords STEP 5 Be careful not to let the loop drop off whi...

Page 11: ...et the spring take up the slack Tension will be immediately applied to the cord Applying tension STEP 6 Under NO circumstances must the cord be released to wind back into the CTS unchecked If this hap...

Page 12: ...end headbox on the angle you have already fixed in place STEP 7 Aluminium Angle Lift the blind into the reveal and fix the remaining 3 angles into place using the holes you have pre drilled Your Lant...

Page 13: ...ole all the way through the face of the channel on the drill line then enlarge the front hole to 8 5mm Reveal Fix drill a 5mm hole through the side of the channel Cover caps to conceal face fix holes...

Page 14: ...ng a tape measure to ensure that the side channels are the same distance apart at each fixing point IMPORTANT NOTE Larger roof blinds may need the channels to be closer in the middle than at the headb...

Page 15: ...start to slide the insert up the zip on the edge of the fabric ensuring the zip stays engaged with the insert Once the insert is level with the top of the side channel you can push it back into the ch...

Page 16: ...ns can also be found at the bottom of the page on the link below https www skylight blinds direct co uk skylight roof lantern blinds lanternlite html Mains powered motors must be connected to an RCD p...