background image

2014.05 Rev.1

Instruction Manual

Summary of Contents for Rose-63CL

Page 1: ...2014 05 Rev 1 Instruction Manual ...

Page 2: ...Foot Switch Installation Method P 6 P 6 Underfilm Shaft Unit Installation Method Name of Each Part P 7 Main Body of Rose 63CL P 7 Operation Panel P 7 Before Processing Laminate P 8 About Laminate Film P 8 Cold Laminate Processing P 9 Installation and Processing of Cold Laminate Film P 9 Maintenance P 11 Cleaning of Roller P 11 Cleaning of paper tube holder P 11 Cover the product with cloth after u...

Page 3: ...al damage on properties may occur This symbol indicates matters to be followed to avoid injury This symbol prohibits disassembly of the device for safety This symbol instructs the user to remove power plug from the outlet for safety This symbol prohibits touching of the product with wet hands This symbol instructs the user to connect grounding for safety This symbol prohibits wetting of the produc...

Page 4: ...ately turn off the power switch and remove power cable from the outlet before contacting the store or our company The product must never be repaired by the customer for safety purpose Caution Power cable must be removed from the outlet when the product is not used for long time Do not insert power cable with wet hands Grounding must be connected before connecting power to power cable Power cable m...

Page 5: ...able Do not use power types other than the rated voltage regulated on this Manual Grounding and earth leakage breaker must be installed Place with low humidity and sound ventilation Installation of this product in place with high humidity can result in short circuit or failure Avoid outdoor places and places with direct light or air conditioner wind Workability Secure sufficient space for workabil...

Page 6: ...s Large diameter roller Speed of laminate processing can be adjusted steplessly Shaft with scale which easily adjust center of processing material Confirmation of Parts The following parts and documents are included in the main body If there is a missing part contact a nearby business office of our company or store from which the product was purchased ...

Page 7: ...and insert foot switch plug carefully Be sure to take care of convex part Convex surface prevents from insertion in incorrect direction Check the shape of the insertion hole before inserting It may cause failure to insert the plug in an incorrect direction When not using foot switch you can disconnect the cable by pulling the lock Foot Switch Installation Method Stand is assembly type Be dented ar...

Page 8: ...sable switch for foot switch Continue Foot switch operation is disable Inching Foot switch operation is enable and roller works during pressing it Forward Reverse Switch You can change the direction of roller rotation Heater Switch When this switch is ON heater temperature rise to set temperature When not using heater please turn this switch OFF Speed Control Dial Turning this dial to the right di...

Page 9: ...ure This product uses a 3 inch about 77 mm branch pipe Type of Roll Film Hot roll film Apply heat to melt glue and attach the film Cold film Parting paper release paper is attached on the surface applied with glue Release the film with the Re winding device and compress with the roller for use Precautions for Handling Laminate Film Do not place the laminate film in places with high temperature and...

Page 10: ...ing to the scale of shaft 2 Install the laminate film and paper core of release paper Insert the underfilm to the underfilm shaft and set the shaft to the machine 1 Install the underfilm Installation and Processing of Cold Laminate Film Cold Laminate Processing Be sure to take care of convex part of the bracket and shaft ...

Page 11: ...and lump in the left part of the machine is illuminated Press the Set button and set the adequate temperature 0 60 When present temperature reaches set temperatur Prepare LED is lit up and lump in the left part of the machine is extinguished This mode means ready for laminate processing After test laminate processing start to laminate original sctripts 4 Perform laminate processing Turn the handle...

Page 12: ...han cloth can rip or damage the pipe After using the product cover the main body with a large cloth to avoid dusts from entering Cover the product with cloth after use Cleaning of Branch Pipe Holder Cleaning of Roller Caution The roller must be stopped when cleaning Do not clean the roller using hard objects such as steel wool They can damage the roller Do not apply force on the roller for long ti...

Page 13: ...nerated inside the machine Turn the power off and then turn it on again Laminate film and under film are not installed properly Refer to P 9 10 of this document to install them properly Tension is too weak Strengthen tension The machine is slanted Reinstall it on a flat surface Is the script too thick Thickness of the script that can be processed by this product is30mm including thickness of the f...

Page 14: ...x substrate thickness Paper tube size Max laminating speed Heating system Processing temperature Roller clearance Power requirement consumption Size W D H Weight 1520 mm 23 mm 3 inch 6 0 m min Infrared inside heating system 0 60 Manual non step settings AC220V 1400W 130kg Product Specification Others 1880 680 1140 mm ...

Reviews: