background image

- 3 -

Technical Data

Max. operating pressure: 4 bar
Attachments:

Attachment Ø 6 cm
Attachment Ø 5 cm
WC Attachment
Shower attachment

Utilisation

1. Select the most suitable attachment 

6

/

7

/

8

/

9

for the blocked pipe and place it on the air

exit opening 

5

. Ensure that it is firmly secured.

2. Remove the sieve or any other inserts from the

pipe.

3. Close and seal all openings, for example over-

flows, on the pipe to be cleared. Use the over-
flow seal for the overflows 

0

:

• With round overflows, press and hold the roll pin

so that the locking lever can be flapped in such
a way that it stands in extension with the roll pin
(Fig 1).

Fig. 1

• Guide it into the overflow. As soon as the locking

lever hits against the rear wall, it opens itself out
(Fig. 2).

Fig. 2

• Slowly release the roll pin and check to ensure

that the overflow is completely closed. The ed-
ges of the overflow seal 

0

must close as uni-

formly as possible around the overflow, otherwi-
se residual soiling could be pressed out.

Fig. 3: Correctly inserted overflow seal 

0

• For elongated overflows, press the roll pin and tip

the locking lever so that it stands at right angles
to the roll pin (Fig. 4).

Abb. 4

• Guide it into the overflow.
• Turn the roll pin through 90° and slowly release

it (Fig. 5).

Fig. 5

• Check to ensure that the overflow is completely

closed. The edges of the overflow seal 

0

must

close as uniformly as possible around the over-
flow, otherwise residual soiling could be pressed
out.

IB_64586_KH710_LB7.qxd  02.05.2011  9:09 Uhr  Seite 3

Reviews: