manualshive.com logo in svg
background image

Installation Note

Keysight

Add 4-Port Capability Upgrade Kit

 

To Upgrade PNA-X N5244B or N5245B Option 219 to Option 419

For Analyzers with Serial Numbers Prefixed MY/SG/US5201 and 

Above

Upgrade Kit Order Number: N5244BU-619 and N5245BU-619

Keysight Kit Number: N5245-60113

Содержание N5244BU-619

Страница 1: ...rt Capability Upgrade Kit To Upgrade PNA X N5244B or N5245B Option 219 to Option 419 For Analyzers with Serial Numbers Prefixed MY SG US5201 and Above Upgrade Kit Order Number N5244BU 619 and N5245BU...

Страница 2: ...U S government customers under its standard commercial license which is embodied in its End User License Agreement EULA a copy of which can be found at http www keysight com find sweula The license s...

Страница 3: ...3...

Страница 4: ...4...

Страница 5: ...tional doublers an additional mixer brick two additional reference couplers two additional test port couplers two additional bias tees two additional source attenuators two additional receiver attenua...

Страница 6: ...ilable on the Web at http www keysight com find assist If you do not have access to the Internet please contact your Keysight field engineer If You Have Problems With the Upgrade Kit Contents Keysight...

Страница 7: ...e Keysight Software Manager http www keysight com find softwaremanager To complete the request you will need to gather the following information From the certificate Order number The PNA contains extr...

Страница 8: ...the license key file If this is the case you received from Keysight you will not be able to install the license key file If this is the case contact Keysight for assistance Refer to Getting Assistanc...

Страница 9: ...D Equipment Required for the Installation Description Keysight Part Number ESD grounding wrist strap 9300 1367 5 ft grounding cord for wrist strap 9300 0980 2 x 4 ft conductive table mat and 15 ft gro...

Страница 10: ...end torque wrench set to 6 in lbs 0 68 N m 1 N A 5 8 in 16 mm nutsetter or open end torque wrench set to 21 in lbs 2 38 N m 1 N A 9 mm nutsetter or open end torque wrench set to 21 in lbs 2 38 N m 1 N...

Страница 11: ...includes wire harness A47 Test port 3 receiver attenuator 2 33325 60023 A48 Test port 4 receiver attenuator A26 Splitter 1 5067 4086 A69 3 dB pad attached to R4 connector on A28 mixer brick 1 08490 6...

Страница 12: ...A10 Source 2 1 N5247 20136 Shield mixer brick 1 N5245 00023 50 ohm load attached to W58 N5245 20095 1 1250 4261 Vibration mount between couplers 1 3 and 2 4 2 0460 2725 Mounting nuts for port 3 4 test...

Страница 13: ...20020 W45 REF 4 RCVR R4 IN to A69 3 dB pad on A28 mixer brick R4 1 N5245 20021 W46 REF 2 RCVR R2 IN to A27 mixer brick R2 1 N5245 20115 W52 A25 HMA26 5 to A26 splitter 1 N5245 20013 W53 A26 splitter t...

Страница 14: ...99 Port 3 RCVR C IN to A47 port 3 receiver attenuator 1 N5245 20073 W100 A47 port 3 receiver attenuator to A28 mixer brick C 1 N5245 20066 W101 Port 4 RCVR D IN to A48 port 4 receiver attenuator 1 N52...

Страница 15: ...A31 Reference Coupler Assemblies Step 11 Install the A30 and A31 Reference Coupler Assemblies Step 12 Assemble the A47 and A48 Receiver Attenuator Assemblies Step 13 Install the A47 and A48 Receiver...

Страница 16: ...the Outer Cover Step 36 Remove Option 219 License Step 37 Enable Options 419 Step 38 Verify the PNA Analyzer Program is Running with the Correct Options Step 39 Perform Post Upgrade Adjustments and Ca...

Страница 17: ...bles 1 Place the analyzer bottom side up on a flat surface 2 Remove all bottom side test set semirigid cables except for those in the following table Do not discard the cables that are removed because...

Страница 18: ...he A27 Mixer Brick Assembly Remove the A27 mixer brick assembly from the PNA For instructions click the Chapter 7 bookmark Removing and Replacing the A27 and A28 Mixer Bricks in the PDF Service Guide1...

Страница 19: ...Installation Note N5245 90113 17 Description of the Upgrade Installation Procedure for the Upgrade Figure 1 A28 Mixer Brick Assembly 2 Follow the four instructions shown in Figure 2...

Страница 20: ...on 3 Connect the gray flexible cables in the order shown in Figure 3 Graphics in this document such as Figure 3 use very brief text to instruct where to connect a cable For example text that reads N52...

Страница 21: ...reusing the 4 existing screws For instructions click the Chapter 7 bookmark Removing and Replacing the A27 and A28 Mixer Bricks in the PDF Service Guide1 New parts are listed in Table 1 on page 9 of...

Страница 22: ...g and Replacing the A29 A32 Reference Couplers and Reference Coupler Mounting Brackets in the PDF Service Guide1 New parts are listed in Table 1 on page 9 of this document Step 12 Assemble the A47 and...

Страница 23: ...d A40 source attenuator assemblies For instructions click the Chapter 7 bookmark Removing and Replacing the A38 A41 Source Attenuators and the A46 A49 Receiver Attenuators in the PDF Service Guide1 Ne...

Страница 24: ...Remove the A33 test port 1 coupler and A36 test port 2 coupler from the PNA For instructions click the Chapter 7 bookmark Removing and Replacing the A33 A36 Test Port Couplers in the PDF Service Guide...

Страница 25: ...n page 9 of this document Figure 6 A33 A36 Test Port Coupler Assembly Step 19 Install the LED Boards and Test Port Coupler Assemblies to the Test Set Front Plate 1 Remove two screws from each LED boar...

Страница 26: ...iption of the Upgrade Installation Procedure for the Upgrade Figure 7 LED Board Assemblies and Test Port Coupler Assemblies Installation Step 20 Install the Coupler Plate Assembly to the Deck Follow t...

Страница 27: ...90113 25 Description of the Upgrade Installation Procedure for the Upgrade Figure 8 Coupler Plate Assembly Installation Step 21 Install Bracket to A10 26 5 GHz Source 2 Assembly Follow the two instruc...

Страница 28: ...26 Installation Note N5245 90113 Description of the Upgrade Installation Procedure for the Upgrade Figure 9 A10 Source 2 Assembly Attach Bracket N5247 20136 Using screws 0515 0666 x1 and 0515 2078 x2...

Страница 29: ...tion of the Upgrade Installation Procedure for the Upgrade Step 22 Assemble the A10 26 5 GHz Source 2 Assembly Follow the four instructions shown in Figure 10 Figure 10 A10 Source 2 Assembly Attach ca...

Страница 30: ...Description of the Upgrade Installation Procedure for the Upgrade Step 23 Assemble and Install the A12 and A13 Doubler Assemblies Follow the four instructions shown in Figure 11 Figure 11 A12 and A13...

Страница 31: ...13 29 Description of the Upgrade Installation Procedure for the Upgrade Step 24 Install the A10 26 5 GHz Source 2 Assembly and Cables Follow the four instructions shown in Figure 12 Figure 12 A10 Sour...

Страница 32: ...ot 2 in the motherboard To see an image showing the location of the A17 board in the motherboard click the Chapter 6 bookmark Top Assemblies All Options in the PDF Service Guide1 3 Connect cable W2 N5...

Страница 33: ...rigid Cables Required for Upgrading to an Option 419 PNA To see images showing the location of these cables click the Chapter 6 bookmark Bottom RF Cables 4 Port Option 419 in the PDF Service Guide1 Ne...

Страница 34: ...45 port 2 bias tee to port 2 CPLR THRU W92 N5245 20088 A44 port 4 bias tee to A35 port 4 coupler W84 N5245 20085 A42 port 1 bias tee to A33 port 1 coupler W88 N5245 20086 A43 port 3 bias tee to A34 po...

Страница 35: ...o A40 port 4 source attenuator W85 N5245 20026 A30 port 3 reference coupler to A39 port 3 source attenuator W93 reuse N5245 20029 A32 port 2 reference coupler to A41 port 2 source attenuator W81 reuse...

Страница 36: ...R4 Connect W45 to the A69 3 dB pad on the A28 mixer brick W99 N5245 20073 Port 3 RCVR C IN to A47 port 3 receiver attenuator W87 N5245 20089 Port 3 CPLR THRU to A43 port 3 bias tee W26 N5245 20015 A3...

Страница 37: ...N5245 20009 A37 reference mixer switch to A27 mixer brick R1 Connect W43 to bottom R1 connector on the mixer bricks W41 reuse N5245 20006 A37 reference mixer switch to front panel REF 1 SOURCE OUT W1...

Страница 38: ...20050 A29 port 1 reference coupler to W11 W16 N5245 20044 A31 port 4 reference coupler to W15 W14 N5245 20043 A30 port 3 reference coupler to W13 W54 N5245 20022 A26 splitter to A27 mixer brick W53 N5...

Страница 39: ...est set motherboard in the PDF Service Guide1 2 If not already done in a previous step install the following new ribbon cables in the order listed To see an image showing the location of these cables...

Страница 40: ...Replace the Front Panel s Lower Dress Panel Before the front panel s lower dress panel can be replaced the 2 port lower dress panel and the lower front panel label must be removed from the front pane...

Страница 41: ...Guide1 Be sure to install the two new screws 0515 1946 in the front panel next to test ports 3 and 4 Torque these screws to 9 in lbs Step 31 Install the Overlays To see an image of the front panel ove...

Страница 42: ...sembly in the PDF Service Guide1 Step 33 Position the Cables and Wires to Prevent Pinching On the top side of the PNA carefully position the grey flex cables so they can t be pinched between the cover...

Страница 43: ...the desired option and click Delete 3 In the Select Desired Option list click 219 4 In the Keysight License Manager dialog box that appears press or click Yes to confirm delete 5 A message displays st...

Страница 44: ...ses 4 Disconnect the USB flash drive from the PNA 5 On the analyzer click or press to open the KLM software from your PNA s Windows taskbar by pressing Start More Programs Keysight License Manager fol...

Страница 45: ...in the PNA on line HELP A list of equipment required to perform these adjustments is also found in the service guide After the specified adjustments have been performed the analyzer should operate an...

Страница 46: ...Prepare the PNA for the User If necessary reinstall front jumper cables If necessary reinstall the cable guards pushing them over the front jumper cables until the cushioning material touches the fron...

Страница 47: ...Installation Note Xxxxx xxxxx 3...

Страница 48: ...This information is subject to change without notice Keysight Technologies 2007 2018 Edition 1 November 2018 N5245 90113 www keysight com...

Отзывы: