background image

W2200/W2500/WU2210 SERIES

Wood Attic Ladder

Installation Instructions

Escalera de ático de madera

Instrucciones de instalación

Échelle de grenier en bois

Instructions d'installation

ESTA ESCALERA ESTÁ DISEÑADA SÓLO PARA USO RESIDENCIAL.

ANTES DE COMENZAR LEA TODAS LAS INSTRUCCIONES. SE NECESITAN DOS 

PERSONAS PARA QUE LA INSTALACION SEA CORRECTA Y MAS FACIL.

SI NO SE CUMPLE CON TODAS LAS INSTRUCCIONES, 

PUEDEN RESULTAR EN LESIONES GRAVES.

CETTE ÉCHELLE D’ÉCHELLE EST CONÇUE POUR UNE 

UTILISATION RÉSIDENTIELLE UNIQUEMENT.

LISEZ CES INSTRUCTIONS COMPLÈTEMENT AVANT DE COMMENCER LE TRAVAIL. IL FAUT 

DEUX PERSONNES POUR QUE L’INSTALLATION SOIT CORRECTE ET PLUS FACILE.

LE NON-RESPECT DE CES INSTRUCTIONS PEUT ENTRAÎNER UNE BLESSURE GRAVE

THIS STAIRWAY IS DESIGNED FOR RESIDENTIAL USE ONLY.

READ THE INSTRUCTIONS COMPLETELY BEFORE STARTING.  TWO PEOPLE ARE 

REQUIRED FOR PROPER AND EASIER INSTALLATION.

FAILURE TO COMPLY WITH ALL INSTRUCTIONS MAY RESULT IN SERIOUS INJURY.

Summary of Contents for W2200 Series

Page 1: ...ODAS LAS INSTRUCCIONES PUEDEN RESULTAR EN LESIONES GRAVES CETTE CHELLE D CHELLE EST CON UE POUR UNE UTILISATION R SIDENTIELLE UNIQUEMENT LISEZ CES INSTRUCTIONS COMPL TEMENT AVANT DE COMMENCER LE TRAVA...

Page 2: ......

Page 3: ...DED 3 Lag Screws optional 16d Nails 8d Nails 1 x 4 temporary support slats 2 pieces approximately 32 long Braces with same dimensions as joists 1 4 or 3 8 plywood for shims TOOLS NEEDED Hammer Ladder...

Page 4: ...SCREWS ARE SECURELY FASTENED Remove cord and pull handle from stairway place through hole in plywood door and knot the end STEP 4 PREPARING MAKING THE ATTIC LADDER OPENING A If it is necessary to modi...

Page 5: ...NT MOUNTING OF STAIRWAY A Be sure stairway is square and level in the rough opening If the stair frame has bowed while the stairway was in inventory nails and blocks of wood used as shims will straigh...

Page 6: ...a hammer to remove see FIGURE 4C PIVOT PLATE END BOARD PIANO HINGE BRACKETS MEASURE THESE DISTANCES CUT ACCORDING TO MEASUREMENT TRIM LINE A A B B FIGURE 4B FIGURE 4C WARNING The bottom section must...

Page 7: ...ponents of heating cooling systems embedded in the ceiling joists made of materials other than wood metal reinforced plaster suspended ceilings If your ceiling contains any of the above do not attempt...

Page 8: ...u can get into the overhead space without stepping above the working height of the ladder The working height of the ladder is two steps down from the top Your stepladder must also have a Duty Rating t...

Page 9: ...Step 3 Go into the overhead space and ind the area above your chosen location This area may be located by A Listening for tapping from below B Measuring distances from walls or other objects common to...

Page 10: ...desired make sure that there is enough room to do so C Check above your chosen location for hazards and obstructions such as Electric wire Pipes Heating and cooling ducts Furnaces Hot water heaters or...

Page 11: ...be used as a side of the frame you will build This will simplify framing the rough opening Step 6 Cut out the rest of the ceiling within the marked outline following these instructions A Do not cut a...

Page 12: ...his mark B If the chosen location is perpendicular to the joists mark the rough opening width on top of the joists See Figure 8 Do not cut the joist at this mark Step 2 Cut 2 joist sized boards long e...

Page 13: ...are lat and vertical 2x joist thickness Cut Here Section of joist to be removed Cut Here Dotted line indicates your chosen location 2x joist thickness Section 1 6 FRAMING THE ROUGH OPENING Before Proc...

Page 14: ...nd into the header See Figure 12 It is very important that header board is vertically plumb as well as horizontally square to side joists STEP 5 Position the second header 54 from the irst one and rep...

Page 15: ...the cut joist s with 3 16d nails See Figure 15 STEP 5 Check header for squareness then drive 3 16d nails through each joist into each end of the header See Figure 15 STEP 6 Place a second header agai...

Page 16: ...hat the inside dimensions of the frame are 22 1 2 x 54 W2208 W2210 and WU2210 or 25 x 54 W2508 and W2510 STEP 5 To attach the stringer s to the headers use nails that are long enough to go through bot...

Page 17: ......

Page 18: ...vos 16d Clavos 8d Tablillas de soporte temporal de 1 x 4 2 piezas de 32 de longitud aprox Refuerzos diagonales con las mismas dimensiones de las vigas Madera laminada de 1 4 3 8 para las cu as HERRAMI...

Page 19: ...1 3 p gina 23 para veriicar que la altura del cielo raso el espacio de aterrizaje y el espacio libre para giro son apropiados PASO 4 PREPARACI N ELABORACI N DE LA ABERTURA PARA LA ESCALERA DE TICO A...

Page 20: ...ecto y nivelada en la abertura preliminar Si el marco de la escalera se ha encorvado pandeado mientras la escalera estaba almacenada los clavos y los bloques de madera utilizados como cu as lo enderez...

Page 21: ...ESTAS DISTANCIAS CORTE DE ACUERDO A LA MEDICI N L NEA DE CORTE A A B B FIGURA 4B FIGURA 4C ADVERTENCIA La secci n inferior debe hacer contacto a ras con el piso No realizar apropiadamente el corte pod...

Page 22: ...l cielo raso vigas hechas de materiales diferentes a la madera revoque mortero reforzado con metal cielos rasos suspendidos Si su cielo raso contiene alguno de los anteriores elementos no intente inst...

Page 23: ...acio superior sin pararse m s all de la altura de trabajo de la escalera La altura de trabajo de la escalera es dos pelda os abajo de la meseta supericie superior de la escalera Su escalera tipo tijer...

Page 24: ...aso 3 Ingrese al espacio superior y encuentre el rea sobre su ubicaci n elegida Esta rea podr a ubicarse A Escuchando al golpear desde abajo B Midiendo distancias desde las paredes u otros objetos com...

Page 25: ...Revise el espacio sobre su ubicaci n elegida en cuanto a peligros y obstrucciones tales como Cables el ctricos Tuber as Ductos de calentamiento y enfriamiento C maras de calentamiento Calentadores de...

Page 26: ...un lado del marco que usted construir Esto simpliicar la enmarcaci n de la abertura preliminar Paso 6 Corte el resto del cielo raso dentro del trazo marcado siguiendo estas instrucciones A No corte n...

Page 27: ...a ubicaci n elegida es perpendicular a las vigas marque el ancho de la apertura preliminar en la parte superior de las vigas Vea la Figura 8 No corte la viga en esta marca Paso 2 Corte 2 tablas de tam...

Page 28: ...e aqu Secci n de la viga a ser removida Corte aqu La l nea punteada indica su ubicaci n elegida Espesor de 2 vigas Secci n 1 6 ENMARCACI N DE LA ABERTURA PRELIMINAR Antes de proceder Usted debe tener...

Page 29: ...portante que la tabla de travesa o est en ngulo recto verticalmente y tambi n en ngulo recto horizontalmente con respecto a las vigas laterales PASO 5 Posicione el segundo travesa o 54 pulgadas a part...

Page 30: ...e la viga s cortada Vea la Figura 15 PASO 5 Veriique el travesa o en cuanto a ngulo recto luego clave 3 clavos 16d a trav s de cada viga dentro de cada extremo del travesa o Vea la Figura 15 PASO 6 Co...

Page 31: ...teriores del marco son 22 1 2 x 54 W2208 W2210 y WU2210 25 x 54 W2508 y W2510 PASO 5 Para sujetar el travesa o s longitudinal a los travesa os utilice clavos que sean lo suicientemente largos para atr...

Page 32: ......

Page 33: ...el Clous 16d Clous 8d Planchettes de support temporaire de 1 x 4 2 morceaux de longueur 32 ou 81 cm environ Entretoises de m mes dimensions que les solives Contreplaqu de 1 4 ou 3 8 pour faire des cal...

Page 34: ...longueur C R f rez vous l Annexe Section 1 3 Page 37 pour v riier que la hauteur de plafond l espace de r ception apr s d ploiement et l espacement pour le pivotement conviennent bien TAPE 4 PR PARATI...

Page 35: ...brute Si le cadre de l escalier a travaill pendant que l escalier tait en inventaire des clous et des blocs de bois utilis s comme cales vont le redresser Du cintrage est normal car les pi ces en boi...

Page 36: ...COUPEZ SELON LES MESURES LIGNE DE COUPE A A B B FIGURE 4B FIGURE 4BC AVERTISSEMENT La section du bas doit arriver pile au plancher Le fait de ne pas couper correctement peut entra ner une contrainte...

Page 37: ...fond solives constitu es de mat riau autre que du bois pl tre renforc par du m tal plafonds suspendus Si votre plafond comporte un de ces l ments n essayez pas d installer l chelle de grenier Contacte...

Page 38: ...au dessus sans avoir une marche monter au dessus de la hauteur de travail normale de l escabeau La hauteur de travail normale sur l escabeau est deux marches de son sommet Votre escabeau doit aussi av...

Page 39: ...4 tape 3 Allez dans l espace du dessus et explorez la zone au dessus de votre choix d emplacement Cette zone peut tre rep r e de ces fa ons A En coutant des cognements port s par en dessous B En mesur...

Page 40: ...vous qu il y aura assez de place pour le faire C Cherchez au dessus de l emplacement choisi l ventualit de dangers ou d obstruction comme C ble lectrique Tuyaux Conduites de chauffage ou refroidisseme...

Page 41: ...cela permet que cette solive soit utilis e comme c t pour l encadrement que vous construirez Cela simpliiera l encadrement de l ouverture brute tape 6 Coupez le reste du plafond dans les limites du c...

Page 42: ...perpendiculaire aux solives marquez la largeur de l ouverture brute sur le dessus des solives Voyez la Figure 8 Ne coupez pas de solive cette marque tape 2 Coupez 2 planches de la taille des solives...

Page 43: ...solive Coupez ici Section de solive enlever Coupez ici Ligne pointill e indiquant votre emplacement choisi 2 x l paisseur de solive Section 1 6 ENCADREMENT DE L OUVERTURE BRUTE Avant de commencer Vou...

Page 44: ...rer la rive Voyez la Figure 12 Il est tr s important que le morceau de rive soit d aplomb verticalement comme d querre avec les c t s des solives tape 5 Positionnez la deuxi me rive 137 2 cm de la pre...

Page 45: ...ec 3 clous 16d Voyez la Figure 15 TAPE 5 V riiez la perpendicularit de la rive et plantez 3 clous 16d au travers de chaque solive dans chacune des extr mit s de la rive Voyez la Figure 15 TAPE 6 Place...

Page 46: ...s int rieures de l encadrement restent au moins 57 1 x 137 2 cm W2208 W2210 et WU2210 ou 63 5 x 137 2 cm W2508 et W2510 TAPE 5 Pour ixer le ou les tirants sur les chev tres utilisez des clous qui soie...

Page 47: ......

Page 48: ...U S 888 523 3370 Canada 877 553 7004 www wernerladder com atticladder Werner Co 93 Werner Rd Greenville PA 16125 9499 Werner Access Products Canada ULC 60 Admiral Blvd Mississauga ON L5T 2W1 PN103943...

Page 49: ...ODAS LAS INSTRUCCIONES PUEDEN RESULTAR EN LESIONES GRAVES CETTE CHELLE D CHELLE EST CON UE POUR UNE UTILISATION R SIDENTIELLE UNIQUEMENT LISEZ CES INSTRUCTIONS COMPL TEMENT AVANT DE COMMENCER LE TRAVA...

Page 50: ...Blank...

Page 51: ...DED 3 Lag Screws optional 16d Nails 8d Nails 1 x 4 temporary support slats 2 pieces approximately 32 long Braces with same dimensions as joists 1 4 or 3 8 plywood for shims TOOLS NEEDED Hammer Ladder...

Page 52: ...STENED Remove cord and pull handle from stairway place through hole in plywood door and knot the end STEP 4 PREPARING MAKING THE ATTIC LADDER OPENING A If it is necessary to modify an existing opening...

Page 53: ...AT THIS TIME STEP 7 PERMANENT MOUNTING OF STAIRWAY A Be sure stairway is square and level in the rough opening If the stair frame has bowed while the stairway was in inventory nails and blocks of woo...

Page 54: ...mer to remove see FIGURE 4C PIVOT PLATE END BOARD PIANO HINGE BRACKETS MEASURE THESE DISTANCES CUT ACCORDING TO MEASUREMENT TRIM LINE A A B B FIGURE 4B FIGURE 4C WARNING component parts of the stairwa...

Page 55: ...y of the following components of heating cooling systems embedded in the ceiling joists made of materials other than wood metal reinforced plaster suspended ceilings If your ceiling contains any of th...

Page 56: ...t into the overhead space without stepping above the working height of the ladder The working height of the ladder is two steps down from the top Your stepladder must also have a Duty Rating that is g...

Page 57: ...ed by A Listening for tapping from below B Measuring distances from walls or other objects common to the overhead space and the room below LS 2 SC FC Description FC Floor to ceiling height SC Swing cl...

Page 58: ...ing or crawling in the overhead space is desired make sure that there is enough room to do so C Check above your chosen location for hazards and obstructions such as Electric wire Pipes Heating and co...

Page 59: ...f the frame you will build This will simplify framing the rough opening Step 6 Cut out the rest of the ceiling within the marked outline following these instructions A Do not cut any joists at this ti...

Page 60: ...his mark B If the chosen location is perpendicular to the joists mark the rough opening width on top of the joists See Figure 8 Do not cut the joist at this mark Step 2 Cut 2 joist sized boards long e...

Page 61: ...x joist thickness Cut Here Section of joist to be removed Cut Here Dotted line indicates your chosen location 2x joist thickness Section 1 6 FRAMING THE ROUGH OPENING Before Proceeding You should have...

Page 62: ...nto the header See Figure 12 It is very important that header board is vertically plumb as well as horizontally square to side joists STEP 5 Position the second header 54 from See Figure 13 STEP 6 The...

Page 63: ...header to the end of the cut joist s with 3 16d nails See Figure 15 STEP 5 Check header for squareness then drive 3 16d nails through each joist into each end of the header See Figure 15 STEP 6 3 16d...

Page 64: ...ions of the frame are 22 1 2 x 54 W2208 W2210 and WU2210 or 25 x 54 W2508 and W2510 STEP 5 To attach the stringer s to the headers use nails that are long enough to go through both headers and into th...

Page 65: ...Blank...

Page 66: ...16d Clavos 8d Tablillas de soporte temporal de 1 x 4 2 piezas de 81 cm de longitud aprox Refuerzos diagonales con las mismas dimensiones de las vigas Madera laminada de 6 35 mm 9 52 mm para las cu as...

Page 67: ...s PASO 4 PREPARACI N ELABORACI N DE LA ABERTURA PARA LA ESCALERA DE TICO A existente o crear una nueva abertura por favor consulte el Ap ndice Secci n 1 1 p gina 22 B Corte la abertura preliminar a tr...

Page 68: ...nada los clavos y los bloques de madera utilizados como cu as lo enderezar n El encorvado es normal ya que las piezas de madera est n sometidas a fuerte tensi n del resorte por alg n tiempo antes de l...

Page 69: ...O MIDA ESTAS DISTANCIAS CORTE DE ACUERDO A LA MEDICI N L NEA DE CORTE A A B B FIGURA 4B FIGURA 4C ADVERTENCIA La secci n inferior debe hacer contacto a ras con el piso No realizar apropiadamente el co...

Page 70: ...entes de sistemas de calefacci n enfriamiento incrustados en el cielo raso vigas hechas de materiales diferentes a la madera revoque mortero reforzado con metal cielos rasos suspendidos Si su cielo ra...

Page 71: ...in pararse m s all de la altura de trabajo de la escalera La altura Su escalera tipo tijera tambi n debe tener una Capacidad de Servicio superior a la suma de su peso m s el peso de la escalera de tic...

Page 72: ...pacio superior y encuentre el rea sobre su ubicaci n elegida Esta rea podr a ubicarse A Escuchando al golpear desde abajo B Midiendo distancias desde las paredes u otros objetos comunes al espacio sup...

Page 73: ...miento y enfriamiento C maras de calentamiento Calentadores de agua calientes u otras obstrucciones NOTA Para revisar en cuanto a peligros usted deber mover el aislamiento fuera de su ubicaci n elegid...

Page 74: ...ura a lo largo de una viga del cielo raso permitir utilizar la viga como un lado del marco que usted abertura preliminar Paso 6 Corte el resto del cielo raso dentro del trazo marcado siguiendo estas i...

Page 75: ...n esta marca B Si la ubicaci n elegida es perpendicular a las vigas marque el ancho de la apertura preliminar en la parte superior de las vigas Vea la Figura 8 No corte la viga en esta marca Paso 2 Co...

Page 76: ...asegur ndose que los extremos de corte de la viga s son planos y verticales Espesor de 2 vigas Corte aqu Secci n de la viga a ser removida Corte aqu La l nea punteada indica su ubicaci n elegida Espes...

Page 77: ...a 12 Es muy importante que la tabla de travesa o est en ngulo recto verticalmente y tambi n en ngulo recto horizontalmente con respecto a las vigas laterales PASO 5 Posicione el segundo travesa o 54 p...

Page 78: ...travesa o al extremo de la viga s cortada Vea la Figura 15 PASO 5 recto luego clave 3 clavos 16d a trav s de cada viga dentro de cada extremo del travesa o Vea la Figura 15 PASO 6 Coloque un segundo t...

Page 79: ...res del marco son 0 57 m x 1 37 m W2208 W2210 y WU2210 0 64 m x 1 37 m W2508 y W2510 PASO 5 Para sujetar el travesa o s longitudinal a los travesa os utilice clavos que sean lo travesa os y dentro del...

Page 80: ...Blank...

Page 81: ...nnel Clous 16d Clous 8d Planchettes de support temporaire de 1 x 4 2 morceaux de longueur 81 cm environ Entretoises de m mes dimensions que les solives Contreplaqu de 6 35 cm ou 9 53 cm pour faire des...

Page 82: ...z vous l Annexe Section 1 3 Page 38 r ception apr s d ploiement et l espacement pour le pivotement conviennent bien TAPE 4 PR PARATION EX CUTION DE L OUVERTURE POUR CHELLE DE GRENIER A existante ou d...

Page 83: ...rute Si le cadre de l escalier a travaill pendant que l escalier tait en inventaire des clous et des blocs de bois utilis s comme cales vont le redresser Du cintrage est normal car les pi ces en bois...

Page 84: ...4BC AVERTISSEMENT La section du bas doit arriver pile au plancher Le fait de ne pas couper correctement peut entra ner une contrainte anormale sur les parties constitutives de l escalier et provoquer...

Page 85: ...s de syst mes de chauffage refroidissement int gr s dans le plafond solives constitu es de mat riau autre que du bois pl tre renforc par du m tal plafonds suspendus Si votre plafond comporte un de ces...

Page 86: ...pour pouvoir entrer dans l espace au dessus sans avoir une marche monter au dessus de la hauteur de travail normale de l escabeau La hauteur de travail normale sur l escabeau est deux marches de son...

Page 87: ...e l emplacement comme d crit aux tapes 3 et 4 tape 3 Allez dans l espace du dessus et explorez la zone au dessus de votre choix d emplacement Cette zone peut tre rep r e de ces fa ons A En coutant des...

Page 88: ...rcher ou de ramper dans l espace du dessus assurez vous qu il y aura assez de place pour le faire C Cherchez au dessus de l emplacement choisi l ventualit de dangers ou d obstruction comme C ble lectr...

Page 89: ...ute Remarque En situant au moins un bord de l ouverture contre une solive de plafond cela permet que cette solive soit utilis e comme c t pour l encadrement que vous tape 6 Coupez le reste du plafond...

Page 90: ...lives marquez la largeur de l ouverture brute sur le dessus des solives Voyez la Figure 8 Ne coupez pas de solive cette marque tape 2 Coupez 2 planches de la taille des solives assez longues pour reli...

Page 91: ...rticales 2 x l paisseur de solive Coupez ici Section de solive enlever Coupez ici Ligne pointill e indiquant votre emplacement choisi 2 x l paisseur de solive Section 1 6 ENCADREMENT DE L OUVERTURE BR...

Page 92: ...oyez la Figure 12 Il est tr s important que le morceau de rive soit d aplomb verticalement comme d querre avec les c t s des solives tape 5 Positionnez la deuxi me rive 137 2 cm de la premi re et r p...

Page 93: ...t de solive coup e avec 3 clous 16d Voyez la Figure 15 TAPE 5 plantez 3 clous 16d au travers de chaque solive dans chacune des extr mit s de la rive Voyez la Figure 15 TAPE 6 Placez une deuxi me rive...

Page 94: ...des c t s non encadr s de votre les dimensions int rieures de l encadrement restent au moins 57 1 x 137 2 cm W2208 W2210 et WU2210 ou 63 5 x 137 2 cm W2508 et W2510 TAPE 5 utilisez des clous qui soie...

Page 95: ...Blank...

Page 96: ...phone U S 888 523 3371 Canada 877 553 7004 www kellerladder net Werner Co 93 Werner Rd Greenville PA 16125 9499 Werner Access Products Canada ULC 60 Admiral Blvd Mississauga ON L5T 2W1 2016 Werner Co...

Reviews: