background image

iStoragE B5-S1

User Manual

Summary of Contents for iStoragE B5-S1

Page 1: ...iStoragE B5 S1 User Manual...

Page 2: ......

Page 3: ...document may not be within the purchase scope or the usage scope Unless otherwise specification in the contract all statements information and recommendations in this document are provided AS IS with...

Page 4: ...tery is iStoragE B5 S1 two batteries is iStoragE B10 S1 and so on The energy storage system iStoragE1 series install up to eight batteries For special illustration the following take iStoragE B5 S1 as...

Page 5: ...ual Foreword iii Symbol Description Be care electric shock prompting Provides a tip that may help you solve a problem or save time Provides additional information to emphasize or supplement important...

Page 6: ...Label Setting 5 1 1 7 Electrical Connection 5 1 1 8 Measurement Under Operation 5 1 2 Safety Precaution for Battery Pack 6 1 2 1 General Safety Precautions 6 1 2 2 Response to Emergency Situations 6 1...

Page 7: ...3 4 Mechanical Installation 16 3 5 Components Requirement 24 3 6 Communication Port Connection 25 3 7 Multiple Battery Connection 26 3 8 Side Cover Plate Installation 27 3 9 Check the Installation 28...

Page 8: ......

Page 9: ...lease read the announcements and operation instructions in this section carefully to avoid accident The promptings in the user manual such as Danger Warning Caution etc don t include all safety announ...

Page 10: ...lease check if the battery pack is damaged or has other danger Check if the external device or circuit connection is safe Before checking or maintenance if the DC side and AC side is power down just n...

Page 11: ...voltage The product operates at high voltages WEEE designation Do not dispose of the product together with the household waste but in accordance with the disposal regulations for electronic waste appl...

Page 12: ...there will be the risk of electric shock when touching the battery pack When installing the battery pack must be grounded first When dismantling the grounding wire must be removed at last Don t damage...

Page 13: ...nnection must be performed according to the description in the user manual and the electrical schematic diagram Grid tied generation should be allowed by the local power supply department and the rela...

Page 14: ...en flame 1 2 2 Response to Emergency Situations The battery pack consists of multiple batteries to form a high voltage system if it fails there is a high voltage risk Kehua company cannot guarantee th...

Page 15: ...l fire department or service engineer In water Stay out of the water and don t touch anything if any part of the battery or wiring is submerged Do not use submerged battery again and contact the servi...

Page 16: ...irement the guarantee time may be influenced The used environment may influence the service life and reliability of the iStoragE B5 S1 So please avoid using the battery pack in the following environme...

Page 17: ...ntro With energy storage system iStoragE1 series it is possible to effectively manage energy in users home day and night This energy storage system will provide a complete energy solution with multipl...

Page 18: ...oragE B5 S1 User Manual 10 2 1 1 Model Meaning Battery Figure2 2 Model meaning of battery 2 2 Appearance and Structure 2 2 1 Appearance Figure2 3 Appearance of the battery 2 2 2 Size Figure2 4 Battery...

Page 19: ...blue Battery pack standby or off Flickers in red Battery pack standby or off and with secondary alarm Red indicator on Battery pack abnormal and with important alarm Off Battery pack is power off 2 2...

Page 20: ...evice including installation process installation preparation transportation and unpacking installation procedure electrical connection and checking etc 3 1 Installation Process Start Install battery...

Page 21: ...iStoragE B5 S1 User Manual 3 Installation 13 3 2 Installation Preparation 3 2 1 Tools Tools Tape Levelling instrument Goggles Torque wrench...

Page 22: ...e iStoragE B5 S1 product is rated at IP65 for outdoor and indoor installation But if the iStoragE B5 S1 product is installed under directly sunshine its temperature will rise quickly so do not install...

Page 23: ...g site in advance In principle the unpacking site should be as close to the installation site as possible The device has been tested and checked strictly but it still may be damaged during transportin...

Page 24: ...riginal package and save properly If the battery needs to be stored for a long time it is necessary to take half a year to charge 3 4 Mechanical Installation The battery is very heavy so it needs to t...

Page 25: ...nd safety shoes Step 1 Determine the installation place 1 Install auxiliary tool Figure3 5 Install auxiliary tool 2 Push the auxiliary tool against the wall Figure3 6 Auxiliary tool against the wall S...

Page 26: ...ion boards and auxiliary tool Step 4 Drill four holes on the wall and drill two holes in the floor for detail specification please see Table3 1 Figure3 9 Install the expansion bolt Table3 1 Expansion...

Page 27: ...d horizontal flatness within 4mm and the installed floor horizontal angle is 0 If not please use gasket to make the floor horizontal Keep the installed place far away from the tube of water electricit...

Page 28: ...d may have the risk of soaking by rain we suggest to select the support to lift the device to avoid damage for the device The installation of support is as follows 2 Mark the installation holes as sho...

Page 29: ...support and base During drilling please ware safety goggles and a dust mask to prevent dust from entering your eyes After drilling please clean the scrap in the installation holes and then perform the...

Page 30: ...with base 2 Fix the wall bracket a of bottom battery pack1 as shown in Figure3 18 Figure3 18 Fix the wall bracket a 3 Place the battery against the wall the bottom limit holes of the upper battery pac...

Page 31: ...iStoragE B5 S1 User Manual 3 Installation 23 Figure3 19 Place the battery pack 4 Tighten the battery rack1 and the battery pack with screws Figure3 20 Tighten the top battery pack...

Page 32: ...ctional area Outer Diameter Scope of supply 1 Battery power cable Standard PV cable in the industry recommended type PV1 F 6 10 mm2 N A Integrated in the battery pack 2 Battery communic ation cable St...

Page 33: ...mm2 N A Purchased by the installer 3 6 External Grounding Connection The external grounding terminal of inverter and battery pack are as shown in of Figure2 5 The external grounding wire cannot replac...

Page 34: ...tning stroke will damage the inverter The grounding of the inverter should be directly connected to the grounding system and the impedance should be less than 20m Figure3 22 Grounding diagram of inver...

Page 35: ...0A 3 8 Side Cover Plate Installation After wiring connection install side cover plate to the inverter and battery packs as follows While fixing the cover plates it is necessary to lead the correspondi...

Page 36: ...FF button on the side of the battery for 1S the battery front panel indicator will light up then the battery enters the standby state After the inverter is turned on the battery indicator will change...

Page 37: ...5 S1 User Manual 3 Installation 29 Battery Setting In the battery setting item you can set battery charge and discharge power Figure3 27 Battery setting Battery status monitoring achieved by inverter...

Page 38: ...ause scald injury After shut down the battery pack and wait until it cooling down then do the maintenance and clean Do not clean the battery pack with any solvent abrasive material or corrosive materi...

Page 39: ...tact and in particular the cable jackets touching the metallic surface are not scratched 3 Unused PV input terminals unused communication ports of the inverter power and COM terminals of the battery p...

Page 40: ...temperature difference is too large Wait for 30 minutes after power off If the problem is not resolved call for service Cell voltage difference is too large Cell battery voltage difference is too lar...

Page 41: ...OC is too low SOC is too low Charging the battery SOH is too low SOH is too low Charging the battery Intermediate bus over voltage Intermediate bus over voltage Please call for service Intermediate bu...

Page 42: ...with the device wiring and ground wiring 3 Test impedance of ground to BAT BAT by multimeter If the impedance is less than insulation impedance protection value check if each port wiring is correct 4...

Page 43: ...ck for overload 2 Check the fault if the problem is not resolved call for service Heat sink over temperature Heat sink over temperature reach the derating point 1 Check the temperature if the temperat...

Page 44: ...lved call for service please call for service Monitor CAN communication fault Monitor CAN communication fault 1 Check if the wiring is correct 2 If the problem is not resolved call for service Monitor...

Page 45: ...device strictly according to the placement direction DO NOT carry the device with the objects that is inflammable explosive or corrosive DO NOT put the device in the open air while midway transshipme...

Page 46: ...over discharge during long term storage more than three months it should be charged regularly to ensure SOC is 30 50 It is recommended that the storage time after receiving the goods should not exceed...

Page 47: ...e current A d c 11 11 Max discharge current A d c 11 11 BAT pack capacity 5 5 40 kwh voltage range 360 500 V d c Basic parameter Size W H D mm 800 380 238 Weight kg 51kg Installation Wall mounting Pro...

Page 48: ...hnical Specifications iStoragE B5 S1 User Manual 40 Model Item iStoragE B5 S1 Noise emission typical 25db A 1m Display LED Communication CAN RS485 Specifications are subject to change without prior no...

Page 49: ...ronyms and Abbreviations 41 B Acronyms and Abbreviations A AC Alternating Current AWG American Wire Gauge C CE Conformite Europeenne D DC Direct Current E EPO Emergency Power Off L LED Light emitting...

Page 50: ...B Acronyms and Abbreviations iStoragE B5 S1 User Manual 42 PV Photovoltaic R RS485 Recommend Standard485...

Page 51: ......

Reviews: