background image

                                                                    USER MANUAL 

   

The document was developed in accordance with the requirements of GOST 2.206

 and was put into effect 

27.11.2019 

 

 

“KB ELECTROMETRY”   

 

 

 

 

 

MULTI-ELECTRODE ELECTRICAL RESISTIVITY & INDUCED 

POLARIZATION IMAGING INSTRUMENTS 

 

MODEL: SibER 64К15

 

 

 

 

СК.64К15.01РЭ 

Summary of Contents for SibER 64?15

Page 1: ...was developed in accordance with the requirements of GOST 2 206 and was put into effect 27 11 2019 KB ELECTROMETRY MULTI ELECTRODE ELECTRICAL RESISTIVITY INDUCED POLARIZATION IMAGING INSTRUMENTS MODEL SibER 64К15 СК 64К15 01РЭ ...

Page 2: ...is designed to perform ground including profile areal borehole electrical exploration by methods of resistance and induced polarization in modifications of electrical tomography and vertical electrical sensing 1 2 Instrument panel 1 The power supply terminals 2 Power ON OFF 3 Automatic protection 4 The connectors of the electrode cable 5 Charger connector 6 LAN connector 1 2 3 6 4 5 7 8 9 10 ...

Page 3: ...tion of supply electrodes A B 10 Terminals for connecting an external source 1 3 Specifications General Electrodes 2 x 32 2 remote External power supply 12V Backup power 12V 2 3 Ah Interface Wi Fi Ethernet Degree of protection IP67 transport IP54 operation Working temperature 20 50 C Dimensions 502 x 415 x 246 mm Weight 17 kg Multi channel meter Number of channels 15 Input impedance 10 MOhm Number...

Page 4: ... 2 206 and was put into effect 27 11 2019 4 Resolution 1 µv Industrial frequency interference suppression at least 90 dB Overvoltage protection up to 1kV Power module Protection against reverse polarity at the entrance Yes Supply voltage range 10 5 15 V Indication of lack of power sound led ...

Page 5: ... effect 27 11 2019 5 1 4 Flow chart EC Control and communication Module 𝜇SD MicroSD memory Card Wi Fi is a wireless communication Module ETH Wired communication Module DB Data Bus POW Power Lines CH Charger connection Connector SM Power management Module LED POWER Led on the dashboard 12 V 2 3 A h Backup battery ...

Page 6: ...e instrument panel R Current shunt TX Source SW Switch 0 65 Number of the output lines of the switch 1 32 connector 1 32 on the dashboard j A connector pin Numbers 1 32 33 64 connector 33 64 on the dashboard A j connector pin Numbers 33 64 0 M 65 N Terminals 0 M 65 N on the dashboard TC Source Controller A B SYNC Terminals to connect an external source to the dashboard 1 5 Device and principle of ...

Page 7: ...tive functions emergency shutdown of individual or all power lines due to short circuits or insufficient supply voltages 8 The external battery not included in the equipment is connected to the power terminals on the dashboard and is designed to power the devices included in the equipment 9 The POWER led on the dashboard is used to indicate the status of the external power supply lit continuously ...

Page 8: ...als of the source on the instrument panel are designed for operation by the method of vertical electrical sensing and diagnostics of the equipment 18 Connectors 1 32 and 33 64 are intended for connection of electrode cables with corresponding numbers of electrodes 19 The external source connection terminals are used to connect to the corresponding external source terminals The instrument performs ...

Page 9: ... Do not inflect with much power the cable winding cable on a coil with an inner diameter of less than 100 mm not arbitrary tightening of nodes The minimum bending radius of the geophysical cable is 50 mm It is not allowed to move the geophysical cable by pulling it over the surface to avoid exceeding the maximum load on the spit elements 4 Do not use the geophysical cable with visible mechanical d...

Page 10: ... of at least 6 mm2 and a length of not more than 1 m 2 The terminals of the equipment power cables and the external battery should be kept clean and operated only with as much contact as possible 3 The use of plug connectors for power supply is not allowed 2 2 Working Procedure 1 Ground the electrodes and connect them to the electrode cable 2 Connect the electrode cables and remote electrodes to t...

Page 11: ...ata acquisition panel The description of the program is given in the operator s manual 10 Connect to the equipment in the Session menu 11 Perform an electrode grounding test in the electrode Test menu 12 Start a measurement session in the menu Start a new at session or Start a new VES session 13 After the measurement session is completed perform the shutdown in reverse order 2 3 MicroSD card The M...

Page 12: ...ommended to fully charge the battery before each use For preventive purposes it is recommended to fully charge the battery at least once a month How to replace the backup battery 1 Unscrew the 22 screws located on the edges of the dashboard 2 Carefully remove the equipment from the case 3 Disconnect the 2 power wires from the battery 4 Carefully Unscrew the 4 screws securing the battery 4 Replace ...

Reviews: