background image

GuestCall Extreme Coaster Paging System 

Quick Setup Guide 

 

800-321-6221 

ISTATION / TXGCIQ 

NEO10 

Transmitter

 Setup 

Components 

1.

 

Transmitter with power supply & antenna 

2.

 

Coaster Charging Base with power supply  

3.

 

GuestCall Extreme Coaster Pagers  

 

Equipment Setup 

 

 

 

Step 3 

Plug the power supply (ACCHPS) into the charging base and then into a 

standard 110-240v outlet. 

For systems with more than 15 pagers (up to 60 pagers total), use the 

jumper cable (ACCHWIRE) to daisy chain the charging bases together. 

Step 4 

Add pagers to the charging base. You will see a RED light on each 

pager. This light indicates the charging status. 

 

LO

” indicates battery below 20% 

 

Solid RED

 indicates pager is charging 

NOTE: A surge protector is recommended for all Transmitters and Charging Bases.  

 

Step 1 

Connect the antenna to the transmitter. Twist to lock in place. 

Step 2 

Plug the power supply (ACCHPS) into the transmitter and then into a 

standard 110-240v outlet. 

2. 

1. 

3. 

Charging Base

 Setup 

ACCHWIRE 

Reviews: