background image

INSTALLATION

& OPERATING

INSTRUCTIONS

550, 700 & 850 De Luxe

Gas Convector

Summary of Contents for 550

Page 1: ...INSTALLATION OPERATING INSTRUCTIONS 550 700 850DeLuxe GasConvector...

Page 2: ...from Instructions 4 5 Ventilation 5 6 Chimney 5 7 Preparatory Building Work 6 8 Fitting the Jetmaster Convector Box 6 9 Gas Cylinders Pipe Runs and Sizes 7 10 Fitting the Gas Burner 8 11 Positioning...

Page 3: ...Manual ControlValve fitted to 850 burner Pressure Test Point 5 16 8mm diameter nipple located on the inlet gas supply on the 550 and 700 burner Test point on the Baby Sit Manual ControlValve on the 8...

Page 4: ...m radius of the fire INSTALLATION OPERATING INSTRUCTIONS 3 INSTALLATION AND OPERATING INSTRUCTIONS 550 700 850 DE LUXE 550 700 850 GAS CONVECTOR INSTALLATION OPERATING INSTRUCTIONS In some countries a...

Page 5: ...e installation of this gas fireplace and the relevant clauses must be applied SABS 1539 2001 Appliances operating on LP Gas portable and mobile appliances safety aspects SABS 087 Part 1 March 1999 Con...

Page 6: ...ors one at ceiling height and one at floor level Most properties have a ventilator at ceiling height The lower vent can be made quickly and cleanly using a core drill and fitting a sleeve and grids at...

Page 7: ...ng fireplace opening mark and drill two securing holes in the base of the convector box and the hearth below and secure the convector box to prevent it from moving forward 7 Preparatory Building Work...

Page 8: ...tted Be sure to fit the right size pipe Do not run more than one gas fire off each supply without first checking the fitter s supply chart Any queries please contact Jetmaster Technical Department LP...

Page 9: ...12 mm drill for the gas pipe entry point Sleeve the gas pipe with metal plastic tubing where it is to pass through the wall of the convector box to protect it If the pipe run from the gas cylinder has...

Page 10: ...the correct position Adjustment on the support legs on the burner may be required 6 Open the gas supply and test for leaks as far as the valve attaching a manometer or U gauge to the test nipple makin...

Page 11: ...550 700 850 GAS CONVECTOR INSTALLATION OPERATING INSTRUCTIONS INSTALLATION OPERATING INSTRUCTIONS 10 INSTALLATION AND OPERATING INSTRUCTIONS 550 700 850 DE LUXE Front Options...

Page 12: ...e has a cut on its rear edge to clear the pilot hole Ensure that the pilot hole and flame strip are not obstructed 2 Position the back board centrally into the burner tray ensuring it is correctly sea...

Page 13: ...es and the back board 6 Position a third and final row of coals 5 on the 550GC 6 on the 700GC and 8 on the 850GC These should rest between the second row of coals and the top of the back board Leave a...

Page 14: ...are fitted properly The 2 pieces of ceramic that go onto the front ceramic support tray should be behind the stop lugs not on top or pushed down onto the lugs If these ceramics do not fit then a fine...

Page 15: ...e generator e g smoke match Once the fire is installed and opperational the installer must check for spillage Carry out the lighting procedure and turn the fire to high Allow to warm up for 5 minutes...

Page 16: ...ensing device fitted to this fire is also an atmospheric sensing device which shuts off both the main burner and pilot if evacuation of the combustion products is interrupted If the fire shuts itself...

Page 17: ...flame will have heated the flame supervision thermocouple sufficiently to operate a hold on magnet within the valve The knob should then be turned so that the pointer is approximately horizontal This...

Page 18: ...e operation 5 Once the pilot is lit continue and hold in the gas control knob for a further 10 15 seconds to establish the pilot If the pilot fails to remain alight repeat the procedure but hold the g...

Page 19: ...that cleaning replacement can be a dirty and dusty operation Suitable precautions should be taken Due to the intense temperatures reached in the fire some surface cracks may appear on the ceramic comp...

Page 20: ...y hand and remove any soot deposits by hand with a soft brush i e paint brush NOTE Due to the intense temperatures reached in the fire some surface cracks may appear on the ceramic components This is...

Page 21: ...lves cleaning and relaying the coals checking the pilot light and all joints checking ventilators and fume clearance and repainting the exposed parts It should take an hour to an hour and a half We ar...

Page 22: ...by main or by fax within 30 days of purchase 3 3 The Gas Grate Gas Convector burner and or firebox was installed by a registered LPGAS Association fitter and was purchased from an appointed Jetmaster...

Page 23: ...anga 10 Milli Street Middelburg Mpumalanga Tel 013 246 2600 Fax 013 246 2951 Richards Bay 63 Kabel Kring Road Alton Richardsbay Tel 035 797 5800 Fax 035 797 5818 Durban Cnr Meridian Solstice roads Umh...

Reviews: