background image

Innovative Technology Limited

®

NV9 Bank Note Validating System

The Future of Smiley

®

 Bank Note Handling

Operations Manual

GA326-3

© Copyright Innovative Technology Limited 2005

Содержание GA326-3

Страница 1: ...Innovative Technology Limited NV9 Bank Note Validating System The Future of Smiley Bank Note Handling Operations Manual GA326 3 Copyright Innovative Technology Limited 2005...

Страница 2: ...vative Technology Ltd Title NV9 Engineers Manual Drawing No GA326 Project Author T J Crowley Date 29 10 2004 Format MS Word 2000 Issue Rel Date Mod By Comments Issue 1 29 10 2004 TJC First draft Issue...

Страница 3: ...6 2 Input and Output Hardware Circuits 12 6 3 Software Optional Serial Interface Input and Outputs 12 7 MACHINE INTERFACES PROTOCOLS 13 7 1 Parallel input and output 13 7 2 Pulse Stream Output 13 7 3...

Страница 4: ...4 10 ROUTINE MAINTENANCE 25 10 1 Cleaning 25 10 2 Note Path Debris Clearing Belt Changing 26 11 FAULT FINDING ANALYSIS 27 12 SUPPORT TOOLS 29 12 1 PC Currency Programming Software ITL BNV Download Man...

Страница 5: ...ay continue to improve our product Alternatively visit our web site at www innovative technology co uk Innovative Technology Ltd Derker Street Oldham England OL1 4EQ Tel 44 0 161 626 9999 Fax 44 0 161...

Страница 6: ...mended that for all but simple mechanical repairs the unit be returned to an approved service centre for repair Caution Never exceed the recommended environmental and electrical limits Do not attempt...

Страница 7: ...ded that the power supply used can supply at least 1 5Amps 3 Environment and Power Requirements Environment Minimum Maximum Temperature 3o C 50o C Humidity 5 95 Non condensing Table 1 Environmental Re...

Страница 8: ...set this may be done using either the NV9 to NV9 currency cloning system or the PC based Currency Management software New currencies and applications are being tested all the time please refer to our...

Страница 9: ...Switch 1 currently has no function and is reserved for future use Switch 2 pulse multiplier This switch is used to modify the behaviour of the selected machine interface Details of the function of thi...

Страница 10: ...ction of this manual 5 2 LED Status Codes The three status LED s are located to the right of the DIPswitches on the top of the unit and are used to indicate a variety of status signals The red status...

Страница 11: ...rial Mode 2 Vend 2 binary bit 2 Note accepted on Channel 2 pulse output 3 Vend 3 binary bit 4 Note accepted on Channel 3 pulse output 4 Vend 4 binary bit 8 Note accepted on Channel 4 pulse output 5 In...

Страница 12: ...transistors All Inputs are held high to internal 5v via 10K The input structure is a CMOS gate with anti static protection fitted Interface Logic levels Logic Low Logic High Inputs 0V Low 0 5 3 7V Hig...

Страница 13: ...d low so that notes may be accepted If all four inhibits are high simultaneously then the NV9 will not read in any notes In this mode if a note is inserted the motor will run in reverse preventing the...

Страница 14: ...eld high To enable a channel the corresponding inhibit must be latched low so that notes may be accepted Note Channels higher than four cannot be individually inhibited but will be globally inhibited...

Страница 15: ...h will cause a note reject In the event of a note being forcibly removed from the mouth of the NV9 during the 30 second interval the NV9 will go out of service for 45 seconds Inhibit Operation Each ch...

Страница 16: ...on C7 7 Inhibit C8 138 Note Accept on C8 8 Inhibit C9 139 Note Accept on C9 9 Inhibit C10 140 Note Accept on C10 10 Inhibit C11 141 Note Accept on C11 11 Inhibit C12 142 Note Accept on C12 12 Inhibit...

Страница 17: ...idator Ready 121 Software Inhibit Channel 4 Inhibit C4 134 Inhibit C4 Channel 4 Inhibited 134 Software Enable Channel 4 Uninhibit C4 154 Uninhibit C4 Channel 4 Inhibited 154 Status Report 182 Status R...

Страница 18: ...ts Each SSP device of a particular type has a unique serial number this number is used to validate each device in the direction of credit transfer before transactions can take place Commands are curre...

Страница 19: ...Validators have a unique address 00110XXX binary 30H The VMC polls the bus to detect presence of the NV9 Validators or get information on the current status of the Validators The Validators will resp...

Страница 20: ...ng the advanced option on the Currency manager program Pin out connections on NV9 for CCTalk are shown below see figure 7 looking at the connection pins on the NV9 interface connector Notes For detail...

Страница 21: ...m the controller ACCEPT ENABLE and SEND and one from the Validators IRQ INTERRUPT see table 8 Caution Please note that the NV9 is required to operate on a 12volt DC power supply The NV9 ground must be...

Страница 22: ...available from support Innovative technology co uk How to register for the first time log in please refer to Appendix D 8 2 NV9 NV9 Copy Cloning Overview This facility exists for a NV9 Bank Note Valid...

Страница 23: ...further copy action will take place If Slave firmware version is same as Master then Master will start to copy currency data to Slave If Slave firmware version is less than master then master will sta...

Страница 24: ...zel and Validator Removal 9 2 Changing or removing cash boxes The NV9 validators can also be supplied with the various cash box options see figure 11 Figure 11 Clip On and Slide in Cash Boxes 300 Note...

Страница 25: ...MILD DETERGENT To clean slide the red release catch on the end of the NV9 Validator to open the note path The note path and lozenge are now exposed for cleaning Carefully wipe the surfaces with a soft...

Страница 26: ...ith a soft lint free cloth that has been dampened with a water and mild detergent solution i e household washing up liquid Take particular care around all the sensor lenses see figure 12 ensuring they...

Страница 27: ...e specification YES NO Check correct supply and sufficient current Check correct DIPswitch settings are selected Check Interface system Finish Notes are not stacking correctly Is cash box fitted YES N...

Страница 28: ...the supply voltage level correct YES Are there foreign objects in the note path Clean the note path Check correct supply and sufficient current Check for any damage Replace damaged components Check th...

Страница 29: ...new version of firmware onto the NV9 Use diagnostic functions to check Validators operation firmware version 3 15 and greater only The software will run on an IBM compatible Personal Computer with Pe...

Страница 30: ...NV9 Operations Manual GA326 4 30 of 38 Copyright Innovative Technology Limited 2005 Appendix A Drawings...

Страница 31: ...NV9 Operations Manual GA326 4 31 of 38 Copyright Innovative Technology Limited 2005...

Страница 32: ...NV9 Operations Manual GA326 4 32 of 38 Copyright Innovative Technology Limited 2005...

Страница 33: ...NV9 Operations Manual GA326 4 33 of 38 Copyright Innovative Technology Limited 2005...

Страница 34: ...NV9 Operations Manual GA326 4 34 of 38 Copyright Innovative Technology Limited 2005...

Страница 35: ...e note 5 The Validator issues a 100ms pulse on the appropriate channel after pin 10 going high to indicate final acceptance of the note If the signal has not been received within 30 seconds it indicat...

Страница 36: ...serial port of the PC and note of the number of the port as this will be needed later for configuring the software Once the connections have been made install the appropriate software for the validato...

Страница 37: ...t innovative technology co uk if you require further assistance Appendix D Website Registration Please move mouse cursor over the support button and click on Currency Downloads If you are already regi...

Страница 38: ...ion we need a valid e mail adress Here you can choose a user name which you will need to log in For a job description you can select one of the listed occupations Please enter you self given password...

Отзывы:

Похожие инструкции для GA326-3