background image

FP14KC-X 

JAN 2023 

FP14KC-X 

Four Post Closed Front 

Commercial Vehicle Lift 

14,000 lb. Capacity 

 

Installation & Operation Manual

 

 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

IMPORTANT!! 

READ  THIS  MANUAL  THOROUGHLY  BEFORE  INSTALLING,  OPERATING,  OR  MAINTAINING 
THIS  LIFT.  WHEN  DONE  WITH  INSTALLATION  BE  SURE  TO  RETURN  DOCUMENTS  TO 
PACKAGE AND GIVE ALL MATERIALS TO LIFT OWNER / OPERATOR.   

Содержание FP14KC-X

Страница 1: ...hicle Lift 14 000 lb Capacity Installation Operation Manual IMPORTANT READ THIS MANUAL THOROUGHLY BEFORE INSTALLING OPERATING OR MAINTAINING THIS LIFT WHEN DONE WITH INSTALLATION BE SURE TO RETURN DOC...

Страница 2: ...lation Instructions Pages 9 21 Lift Location Runway Crossbeam Post Crossbeam Anchoring Posts Power Unit Control Bracket Hydraulic Hose Airline Power Unit Electrical Connection Cycle Testing Bleeding H...

Страница 3: ...ould not wear loose clothes to avoid being clamped by any moving part when the machine is descending or rising Area around the lift must be kept clean to help avoid accidents and possible lift malfunc...

Страница 4: ...on Lift Description The iDEAL FP14KC X 14 000 lb Four Post Commercial Service Lift is a high performance closed front cable pull vehicle lift designed for Cars SUVs Vans Trucks The FP14KC X Service Li...

Страница 5: ...5 FP14KC X JAN 2023 Lift Layout Fig 1...

Страница 6: ...r trailer The four post lift package alone weighs close to 2 700 pounds not including any kits or optional accessories that may be included Un banding the Lift The steel bands which secure the lift pa...

Страница 7: ...where the lift is to be installed and check for cracked or defective concrete This lift must be installed on a solid level concrete floor with no more than 2 degrees of slope A level floor is suggeste...

Страница 8: ...anchors typically 2 to 3 weeks Anchoring Tips 1 Use a concrete hammer drill with a carbide tip solid drill bit the same diameter as the anchor 3 4 775 to 787 inches diameter Do not use excessively wor...

Страница 9: ...e adequate clearance around the lift s outer perimeter for safety clearance as shown in Fig 3 Ensure concrete floor is level meets Foundation Anchoring Requirements on Page 8 NOTE The Main Side Power...

Страница 10: ...ay making sure the hydraulic hose connection is positioned to the front of bay Fig 4 Fig 4 2 Pull cable ends air tubing and hydraulic lines out from the ends of the Main Side Runway for assembly Ensur...

Страница 11: ...aside for reassembly in the follwing steps Fig 6 6 Slide the cables from the ends of power side runway and route the cables though the crossbeams referring to the routing diagram in Fig 7 Fig 7 CAUTI...

Страница 12: ...s and the holes in the front wheel stops Secure runway wheel stop to the crossbeam using four M12 x 40mm hex flange bolts Fig 9 Fig 9 9 Bolt the rear of runways onto the rear crossbeam by aligning the...

Страница 13: ...inserted through the outer top plate hole for each Post 4 Carefully position each Post to be centered around the Crossbeam ends while still allowing the Nylon Slider bolt holes to stay exposed Bolt S...

Страница 14: ...the Slack Cable Roller 7 Locate the Plastic Crossbeam Covers and mount to the top of each Crossbeam ends using the Plastic Insert Screws Fig 14 8 Re install Cable Guide Tabs to the underside of each...

Страница 15: ...are damaged or if the lift will need to be relocated 3 After drilling remove dust thoroughly from each hole using compressed air and or wire brush Make certain that the column remains aligned with the...

Страница 16: ...t Fig 20 Fig 21 2 Mount Control Bracket to the backside of the Main Side Post Bracket s left side while using the same M8 x 25mm Bolts M8 Washers Hex Nuts to mount the Power Unit Fig 20 Ensure to tigh...

Страница 17: ...h Corrugated Flex Tubing already attached Gently pull hose slack through the Flex Tubing Figs 23 24 Fig 23 Fig 24 4 Install 90 degree Power Unit Fitting to HP Port on left side of Power Unit shown in...

Страница 18: ...rt A Figs 27 A B Fig 27 8 Connect D6 Airline to the Outlet Valve Port P and route through Flex Tubing to connect to T Fitting Connect airlines to each end of T Fitting then connect to Y Fittings in Cr...

Страница 19: ...220VAC electrical supply to Power unit and connect shop air to Quick Disconnect Air Fitting on Control Bracket Ensure shop air supply to Air Fitting is between 90 115 PSI for proper Latch operation F...

Страница 20: ...to the outside of the Runway Pivot Tubes Fig 31 Cable Leveling Adjustment 2 Adjust cable s with lift fully lowered and with Crossbeams touching Base Plates Loosen top jam nut and tighten nut on cable...

Страница 21: ...tment nuts on cable end or latch bar stud always leave at least two threads showing between top nut and stud end Be sure all four corners have passed the locking latch bar slot before lowering lift on...

Страница 22: ...capacity Never allow unauthorized persons to operate lift Thoroughly train new persons employees in the use operation and care of lift Prohibit unauthorized persons from being in shop area while lift...

Страница 23: ...t the latches set tight in a lock position Never work under a lift that is not in the locked position at all four corners of lift WARNING Always have the Lift in the Locked Position before going under...

Страница 24: ...her of Power Unit 1 Oil reservoir tank overfilled Relieve all pressure and siphon out hydraulic fluid until at a proper level 2 Lift lowered too quickly while under a heavy load Lower the lift slowly...

Страница 25: ...1 Locate the check valve the flush plug to the left of the lowering valve Step 2 Using an Allen wrench and shop towel with shop towel in place to catch fluid loosen the check valve plug 2 turns to al...

Страница 26: ...sually while in operation Check safety latches for free movement and full engagement with latch rack Check hydraulic connections and hoses for leakages Check cables anchoring connections for cracks an...

Страница 27: ...27 FP14KC X JAN 2023 Exploded Views Structure...

Страница 28: ...28 FP14KC X JAN 2023...

Страница 29: ...29 FP14KC X JAN 2023...

Страница 30: ...021 TT 8861 200 01 HJ Latch Rack 4 22 FP14KCX 022 GB95 1985 D8 Flat Washer D8 4 23 FP14KCX 023 GB70 1 2000 M8 12 Screw M8 x 12mm 4 24 FP14KCX 024 TT 8861 100 01B HJ Slack Cable Latch LH 4 25 FP14KCX 0...

Страница 31: ...072 GB70 2 2000 M10X25 Screw M10 x 25mm 4 73 FP14KCX 073 TT 8861 300 09 Rubber Grommet Runway 2 74 FP14KCX 074 GB T91 2000 5X40 Split Pin 5mm x 40mm 1 75 FP14KCX 075 8045 401G Cylinder Connector 1 76...

Страница 32: ...32 FP14KC X JAN 2023 Exploded View Power Unit PU 220V FP14KCX...

Страница 33: ...200 E00 Reservoir Fill Cap 1 19 PU 220V FP14KCX 019 5901 01120 355 O Ring D112 x 3 55mm 1 20 PU 220V FP14KCX 020 5105 08080 000 Hex Socket Bolt M8 x 80mm 2 21 PU 220V FP14KCX 021 BZ01 00001 100 Return...

Страница 34: ...considered a warranty issue and therefore must be noted for any potential recovery with the shipping company The customer is required to notify Tuxedo of any missing parts within 72 hours Timely notif...

Отзывы: