background image

eBOX-104

Installation Guide

Summary of Contents for eBOX-104

Page 1: ...eBOX 104 Installation Guide ...

Page 2: ...eBOX 104 with VSX 6150E V2 Step by step installation guide Revision 1 0A ...

Page 3: ...1 Unscrew the 8x screws 4 top 4 bottom to remove the rubber feet 2 Using a 5 32 allen wrench and a 5 16 socket wrench remove the 4x cover screws 3 Remove the top and bottom covers ...

Page 4: ...4 Unscrew the 6x screws to remove the PCB bracket 5 Prepare the following materials for mounting the standoffs onto the VSX 6150E V2 6 Insert the standoffs from the top side of the unit ...

Page 5: ...en Do not over tighten 8 To mount the heat sink place the heat conductive pad on top of the CPU 9 Align the aluminum heat sink according to the nylon pin holes located on the unit and place on top of the heat conductive pad Press down on the nylon pins until they lock to secure the heat sink ...

Page 6: ...the differences between the left and right brackets 11 Insert the screws through the rubber grommets and install the bracket onto the unit by securing the screws to the standoffs Please note to install the correct brackets to the correct side of the unit as shown 12 Side view of installed bracket ...

Page 7: ...2 bracket assembly back into the chassis and secure with the 6x screws 14 Plug in the cables accordingly 15 Place another heat conductive pad on top of the heat sink Check to make sure the rubber gaskets are correctly in place ...

Page 8: ...eplace the top and bottom covers 17 Insert the cover screws and secure in the order of opposite corners diagonally to ensure even pressure 18 Reinstall the rubber feet onto the chassis and securely tighten the screws ...

Reviews: