background image

Power Systems

Installing the IBM Power System S822
(8284-22A)

GI11-9906-00

Summary of Contents for Power System S822

Page 1: ...Power Systems Installing the IBM Power System S822 8284 22A GI11 9906 00...

Page 2: ......

Page 3: ...Power Systems Installing the IBM Power System S822 8284 22A GI11 9906 00...

Page 4: ...y Notices manual G229 9054 and the IBM Environmental Notices and User Guide Z125 5823 This edition applies to IBM Power Systems servers that contain the POWER8 processor and to all associated models C...

Page 5: ...stalled server 22 Removing the shipping bracket and connecting power cords and power distribution unit PDU for your preinstalled server 23 Cabling the server and setting up a console 24 Determining wh...

Page 6: ...iv Power Systems Installing the IBM Power System S822 8284 22A...

Page 7: ...oduct The documentation contains the safety information in your national language with references to the U S English source Before using a U S English publication to install operate or service this pr...

Page 8: ...at will be attached to this product to properly wired outlets v When possible use one hand only to connect or disconnect signal cables v Never turn on any equipment when there is evidence of fire wate...

Page 9: ...e customer to ensure that the outlet is correctly wired and grounded to prevent an electrical shock CAUTION v Do not install a unit in a rack where the internal rack ambient temperatures will exceed t...

Page 10: ...your rack cabinet for the weight of a loaded rack cabinet v Verify that all door openings are at least 760 x 230 mm 30 x 80 in v Ensure that all devices shelves drawers doors and cables are secure v E...

Page 11: ...L003 or or 1 2 3 4 DANGER Multiple power cords The product might be equipped with multiple power cords To remove all hazardous voltages disconnect all power cords L003 L008 Safety notices ix...

Page 12: ...in equipment transmitting on system links with laser modules that operate at greater than Class 1 power levels For this reason never look into the end of an optical fiber cable or open receptacle C027...

Page 13: ...this equipment must not be metallically connected to the interfaces that connect to the OSP outside plant or its wiring These interfaces are designed for use as intrabuilding interfaces only Type 2 or...

Page 14: ...xii Power Systems Installing the IBM Power System S822 8284 22A...

Page 15: ...er v The latest version of this document is maintained online See Installing the IBM Power System S822 8284 22A http www ibm com support knowledgecenter POWER8 p8egh p8egh_roadmap htm v Plan your serv...

Page 16: ...contact information Determining and marking the location in the rack Use this procedure to determine where to install the system unit into the rack To determine where to install the system unit into...

Page 17: ...wer hole of each EIA unit 6 Repeat step 5 for the corresponding holes located on the left side of the rack 7 Go to the rear of the rack 8 On the right side find the EIA unit that corresponds to the bo...

Page 18: ...the rack complete the following steps 1 Each slide rail is marked with either an R right or an L left when you look from the front Select the left slide rail bring it to the rear of the rack and locat...

Page 19: ...ard and insert three pins on the front of the rail into the holes within the selected U that were previously marked Lower the slide rail down 1 to engage the hook feature on the middle pin For details...

Page 20: ...and the front of the system if present 2 Extend the slide rails forward 1 until they click twice into place Carefully lift the server and tilt it into position over the slide rails so that the rear na...

Page 21: ...Support arm B Cable management stop bracket C Mounting bracket D Cable management arm E Extension bracket 2 The cable management arm can be installed on either side of the server For this procedure i...

Page 22: ...rt arm so that the locking tab on the underside of its tip aligns with the bracket hole Insert the tab into the hole 1 and turn the bracket 2 to secure it to the support arm For details see Figure 11...

Page 23: ...to the slot on the inside of the right slide by sliding the mounting bracket C into the slide rail until the spring loaded pin snaps into place For details see Figure 14 on page 10 Figure 12 Extending...

Page 24: ...ther you create logical partitions which operating system you install in your primary partition and whether you install a Virtual I O Server VIOS in one of your logical partitions Determining which co...

Page 25: ...terminal you must use a conversion cable This cable part number 46K5108 is used to convert the ASCII terminal 9 pin Dshell connector to an RJ45 serial port connector on the system For information abou...

Page 26: ...without using a management console on page 21 Cabling the server to the HMC The Hardware Management Console HMC controls managed systems including the management of logical partitions the creation of...

Page 27: ...re connecting a second HMC to your managed server connect to the Ethernet port that is labeled HMC2 on the managed server 4 Continue with Cabling the server and connecting expansion units on page 19 C...

Page 28: ...are supported for Operations Console LAN is documented at IBM i Access http www 03 ibm com systems i software access windows supportedos html a Log on to the system as a local administrator b Ensure t...

Page 29: ...t name and IP address by doing the following types 1 Give your session a name The name must be one of the following names v A valid host name that was registered in the site DNS for the console IP add...

Page 30: ...A601 500A Twinax console v A602 500A Direct cable console v A603 500A LAN console v A604 500A HMC console If the system reference code SRC A603500A skip to step 6e For all others SRCs continue to the...

Page 31: ...itor the console status After the status changes to Pending Authorization the Service Tools Sign On window opens Note The Service Tools Sign On window might open behind the Operations Console window R...

Page 32: ...e Web based ASMI change the partition boot mode back so that the server loads the operating environment during startup 1 Expand Power Restart Control 2 Click Power On Off System 3 Select Continue to o...

Page 33: ...awers to the PDU with an IEC 320 type receptacle 2 Attach the PDU input power cord and plug it into the alternating current ac power source 2 For information about connecting enclosures and expansion...

Page 34: ...x Central b If necessary update your managed system firmware levels In the navigation area select Updates c In the contents area select your managed system d Click Change Licensed Internal Code for th...

Page 35: ...x_ibmi htm v Install the Linux operating system For instructions see Installing Linux http www ibm com support knowledgecenter POWER8 p8hdx p8hdx_installlinux htm v Install the VIOS operating system F...

Page 36: ...e terracotta shipping brackets on the right and left of the rear of the server do not interfere with the installation or operation of the system They can remain installed on the system Preparing to se...

Page 37: ...ly v Directory of worldwide contacts website http www ibm com planetwide Select your location to view the service and support contact information Removing the shipping bracket and connecting power cor...

Page 38: ...and whether you install a Virtual I O Server VIOS in one of your logical partitions Choose one of the consoles interfaces or terminals in the following table Table 6 Available console types Console ty...

Page 39: ...p8ecs p8ecs_locations htm To cable an ASCII terminal to the server complete the following steps 1 Using a serial cable that is equipped with a null modem connect the ASCII terminal to the serial port...

Page 40: ...vigation area click Updates 2 In the work area view and record the information that appears in the HMC Code Level section including the HMC version release maintenance level build level and base versi...

Page 41: ...owing settings as appropriate for the type of partition on which you are installing the Integrated Virtualization Manager For an AIX or Linux partition complete the following steps to change the parti...

Page 42: ...route cables through the cable management arm and to connect expansion units To route cables through the cable management arm and to connect expansion units complete the following steps 1 Route the c...

Page 43: ...navigation area click Updates Firmware information is displayed in the contents area 4 Compare your installed firmware level with available firmware levels If necessary update your firmware levels a C...

Page 44: ...Install an operating system and update the operating system v Install the AIX operating system For instructions see Installing AIX http www ibm com support knowledgecenter POWER8 p8hdx p8hdx_installai...

Page 45: ...dgecenter POWER8 p8hdx p8hdx_installlinux htm v Install the VIOS operating system For instructions see Installing VIOS http www ibm com support knowledgecenter POWER8 p8hch p8hch_installvios htm 5 Upd...

Page 46: ...32 Power Systems Installing the IBM Power System S822 8284 22A...

Page 47: ...system Flashing Off Flashing Off Power is not being supplied to one of the power supplies but power is being supplied to the second power supply and the system is in standby mode On Off Flashing Off P...

Page 48: ...your system and its cables have optimal clearance for maintenance and other operations The guidelines also provide guidance in correctly cabling your system and using the appropriate cables The follow...

Page 49: ...d power cables v Four cable management bridge lanes on the top of the rack Use these bridge lanes to route the cables from one side of the rack to the other by routing to the top of the rack where pos...

Page 50: ...System Management Interface by using a web browser if you need to set IP addresses on your notebook or if you need to troubleshoot a connection Accessing the ASMI by using a web browser If your syste...

Page 51: ...e Ethernet port labeled HMC2 on the rear of the managed system Important If you attach an Ethernet cable to the service processor before the system reaches power off standby the IP address shown in Ta...

Page 52: ...ete the following procedure Windows Vista To set the IP address within Windows Vista complete the following steps 1 Click Start Control Panel 2 Ensure Classic View is selected 3 Click Network and Shar...

Page 53: ...nagement Interface ASMI by using a network connection complete one of the following tasks v Using a serial cable that is equipped with a null modem connect the ASCII terminal to the serial port on the...

Page 54: ...40 Power Systems Installing the IBM Power System S822 8284 22A...

Page 55: ...NON INFRINGEMENT MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Some states do not allow disclaimer of express or implied warranties in certain transactions therefore this statement may not apply...

Page 56: ...tions performed and data saved or transmitted by the system at or near the time of the outage or failure In addition users must establish procedures to ensure that there is independent data verificati...

Page 57: ...unications Commission FCC statement Note This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed...

Page 58: ...GmbH Technical Regulations Department M372 IBM Allee 1 71139 Ehningen Germany Tele 49 0 800 225 5423 or 49 0 180 331 3233 email halloibm de ibm com Warning This is a Class A product In a domestic envi...

Page 59: ...need to perform practical action Electromagnetic Interference EMI Statement Taiwan The following is a summary of the EMI Taiwan statement above Warning This is a Class A product In a domestic environm...

Page 60: ...ann vom Betreiber verlangt werden angemessene Ma nahmen zu ergreifen und daf r aufzukommen Deutschland Einhaltung des Gesetzes ber die elektromagnetische Vertr glichkeit von Ger ten Dieses Produkt ent...

Page 61: ...e following measures v Reorient or relocate the receiving antenna v Increase the separation between the equipment and receiver v Connect the equipment into an outlet on a circuit different from that t...

Page 62: ...ts for Class B equipment were derived for typical residential environments to provide reasonable protection against interference with licensed communication equipment European Community contact IBM De...

Page 63: ...hland Einhaltung des Gesetzes ber die elektromagnetische Vertr glichkeit von Ger ten Dieses Produkt entspricht dem Gesetz ber die elektromagnetische Vertr glichkeit von Ger ten EMVG Dies ist die Umset...

Page 64: ...the express consent of IBM Rights Except as expressly granted in this permission no other permissions licenses or rights are granted either express or implied to the Publications or any information d...

Page 65: ......

Page 66: ...Part Number 00LA014 Printed in USA GI11 9906 00 1P P N 00LA014...

Reviews: