background image

 

 

 

 
 

 

HYCON A/S 

Juelstrupparken 11 
DK-9530 Støvring 
Denmark 
 
Tel: +45 9647 5200 
Fax: +45 9647 5201 
Mail 

[email protected]

 

www.hycon.dk 

 

HPP27VMF  

Hydraulic Powerpack

 

 

From serial 

number 12645 
 
Revised 
03.04.2019

 

 

Prior to Operation 

 

We thank you for choosing a 

HYCON powerpack. 

 

Please note that the powerpack 

is delivered without hydraulic 

oil, and therefore it must be 

filled up with hydraulic oil prior 

to operation. 

 

To ensure smooth operation 

and long-lasting performance of 

your new powerpack, we 

recommend that you study this 

operating manual carefully and 

pay special attention to the  

 

Safety and Service 

Precautions

  

 

We hope you will be satisfied 

with your new HYCON power-

pack. 

 

Best regards 

HYCON A/S 

 

Summary of Contents for HPP27VMF

Page 1: ... HYCON powerpack Please note that the powerpack is delivered without hydraulic oil and therefore it must be filled up with hydraulic oil prior to operation To ensure smooth operation and long lasting performance of your new powerpack we recommend that you study this operating manual carefully and pay special attention to the Safety and Service Precautions We hope you will be satisfied with your ne...

Page 2: ...s Page Safety precautions 2 Filling up hydraulic oil 2 Technical data 3 Starting instructions 4 Setting of flow 4 Service maintenance and hydraulic settings 5 Oil types 6 Warranty conditions 6 Spare parts list 7 ...

Page 3: ... of a crane 8 The pressure relief valves are set at 160 bar 2300 psi from our plant Never set them higher 9 Always use filters with by pass The use of filters without by pass may blow the hydraulic hoses and the filter cover Filling Up Hydraulic Oil To fill up with hydraulic oil loosen the filter cover on top of the powerpack Remove the filter element see photo and fill up with oil When oil is sho...

Page 4: ...nst overheating The powerpack has no POR system and the engine r p m oil flow is adjusted manually by means of the throttle Oil flow connection A 30 l p m 8 g p m at 1900 r p m 40 l p m 10 g p m at 2700 r p m 60 l p m 16 g p m at 3600 r p m Oil flow connections B and C 15 l p m 4 g p m at 1900 r p m 20 l p m 5 g p m at 2700 r p m 30 l p m 8 g p m at 3600 r p m Working pressure nominal 120 bar 1750...

Page 5: ...has three connections allowing for connection of two tools simultaneously The connections are marked A B and C respectively The oil flow can be adjusted by regulating the engine r p m by means of the throttle Connection A can be set to 30 60 l p m 8 16 g p m Connections B and C can be set to 20 30 l p m 4 8 g p m Connection A cannot be used simultaneously with connections B and C Each connection i...

Page 6: ...C levers to OFF Then close the valve on the test equipment and adjust the pressure relief valve B according to the technical data Adjust the pressure relief valve by loosening the lock nut and turning the adjustment screw in or out In increases the pressure and out decreases the pressure Retighten the lock nut after adjustment Connect the test equipment to connection C start the powerpack and move...

Page 7: ... date of operation however not more than 18 months from the date of delivery The warranty applies to faults that can be related to construction and production errors Faults caused by incorrect operation incorrect handling lack of maintenance or the like will not be accepted as warranty The warranty covers the parts necessary for repair and the suggested average time needed for repair For further w...

Reviews: