background image

 

 

 

Hybrid Home 4,8 / 8,2 

Hybrid Home

 

Instruction Manual

WWW.HYBRID.ENERGY

Summary of Contents for Hybrid Home 4,8

Page 1: ...Hybrid Home 4 8 8 2 Hybrid Home Instruction Manual WWW HYBRID ENERGY ...

Page 2: ...orage systems operate correctly Installation and maintenance activities must be performed by a qualified and certified electrician The instruction manual should be kept in close proximity to the Hybrid Home system and must be permanently available to all individuals involved in working on the energy storage system for logging data purposes and quick access to the correct information Legal Notice T...

Page 3: ...per use of the product or by repairs opening of the storage cabinet and any other actions carried out by unqualified persons electricians This disclaimer also applies for the use of non approved spare parts and failure to comply with the specified maintenance intervals overloading the system or abusing it in any way or means The product must not be rebuilt or technically modified without authorisa...

Page 4: ...tion 13 5 2 Connecting to the AC Utility 13 5 3 Connecting AC Utility to Hybrid Home 14 6 PV Module DC Connection 15 7 Load AC Output Connection 17 8 Communication 18 9 Commissioning 19 10 Remote LCD Operation 20 10 1 Interface 20 10 2 LCD Information Defined 20 10 3 Button Definition 22 10 4 Query Menu Operation 22 10 5 Operation Mode Display 26 11 Charging Management 29 12 Applications with Ener...

Page 5: ...rolled input voltage of PV modules are within acceptable range see specification for the details the inverter is able to power the loads house to feed sell to the grid utility and charge batteries simultaneously Note This inverter is only compatible with single crystalline Mono and poly crystalline photo voltaic panels Do not connect any PV array types other than these two types to the inverter Se...

Page 6: ...nd on www hybrid energy 2 2 Hybrid Transport box Since we love our planet we have chosen to send your Hybrid Home in an environmentally friendly cardboard shipping box This box has been made of recycled materials and printed with non petrol chemical inks You can dispose of this box anywhere but why not give it a third life by handing it in at paper collection site for recycling or turn it in to mu...

Page 7: ... following connections they should be pre wired on arrival 1 PV connection 2 AC Grid connection 3 Battery connection 4 AC output connection Load connection 5 RS 232 communication port 6 USB communication port 7 Intelligent slot Wifi card module 8 Grounding Earth point 6 ...

Page 8: ... using this Hybrid Home system read all instructions and cautionary markings on the Hybrid inverter and all appropriate sections of this guide WARNING Normally grounded conductors may be ungrounded and energised when a ground fault is indicated WARNING The Hybrid inverter batteries and frame are heavy Take notice when lifting it It should be lifted by at least two persons CAUTION Authorised servic...

Page 9: ...ginal manufacturers parts non approved tools and parts may cause a risk of fire electric shock or injury to persons CAUTION To reduce risk of fire hazard do not cover or obstruct the cooling fan of the inverter or the cooling fan on top of the Hybrid Home system CAUTION Do not operate the Hybrid Home system if it has received a sharp blow been dropped or otherwise damaged in any way If the Hybrid ...

Page 10: ...ern Moreover installation and maintenance work involves residual risks under the following circumstances Installation and maintenance work is not performed correctly Installation and maintenance work is performed by personnel who have not been trained and not been instructed The safety instructions given in these instructions are not observed All persons assigned to work on the system must have re...

Page 11: ...t is dry free of excessive dust and has adequate air flow Do NOT operate it where the temperature and humidity is beyond the specific limits Installation position shall not prevent access to the means of disconnection The Hybrid Home is designed IP20 for indoor applications only Regularly clean the fan filter on top and bottom of the Hybrid Home as well as inside on the Hybrid inverter itself 4 2 ...

Page 12: ...e external battery cable ring terminal over the battery terminal Refer to Chart 7 RED marked cable to the positive terminal BLACK marked cable to the negative terminal Step 3 Make sure the wires are securely connected The reference tightening torque should not exceed 2 04 N m WARNING It s very important for system safety and efficient operation to use appropriate cable for battery connection To re...

Page 13: ...tion orientation 2 Remove the front panel by unscrewing the 2 bolts and lift the front panel carefully upwards 3 Very carefully slide the batteries starting with batteries at the bottom of the frame All battery terminals should be positioned on the same side Strap every battery with the strap supplied 4 Connect red side labelled battery cable to red pole on battery see attached battery installatio...

Page 14: ...or AC wire 5 2 Connecting to the AC Utility Step 1 Check the grid voltage and frequency with an AC voltmeter It should be the same as VAC value on the product label Step 2 Turn off all the circuit breakers Step 3 Remove insulation sleeve 8 mm for three conductors And shorten phase L and neutral conductor N 3 mm Refer to chart 1 Step 4 Connect wires according to polarities indicated on terminal blo...

Page 15: ... top of S1 of the Hybrid distribution box After checking if the wires are connected correctly close the cabinet again L LINE Brown or Red Ground Yellow Green N Neutral Blue or Black Wire Size Ring Terminal Torque value Cable mm 2 Dimensions D mm L mm 10 AWG 6 4 3 21 8 1 2 2 Nm 14 CAUTION To prevent risk of electric shock ensure the ground wire is properly earthed before operating this hybrid inver...

Page 16: ...ect polarity of connection cable from PV modules and PV input connectors Then connect positive pole of connection cable to positive pole of PV input breaker Connect negative pole of connection cable to negative pole of PV input breaker Refer to Chart 5 15 CAUTION Exceeding the maximum input voltage can destroy the unit Check the system before wire connection WARNING Because the Hybrid inverter is ...

Page 17: ...able for PV module connection To reduce risk of injury please use the proper recommended cable size as below Conductor cross section mm2 AWG no 4 6 10 12 16 CAUTION Do NOT touch the inverter to avoid electric shock When PV modules are exposed to sunlight it generates DC voltage to the inverter CAUTION Never touch terminals of the inverter directly It will cause lethal electric shock ...

Page 18: ...htening torque is 0 82 N m Model 3KW 3KW Plus Nominal Load output Voltage 208 220 230 240 VAC Conductor cross section mm2 4 6 AWG no 10 12 17 Chart 9 CAUTION It s only allowed to connect load to AC Output Connector Do NOT connect the utility to AC Output Connector CAUTION Be sure to connect L terminal of load to L terminal of AC Output Connector and N terminal of load to N terminal of AC Output Co...

Page 19: ...rfaces in order to communicate with a PC laptop or tablet with corresponding software installer only This intelligent slot is suitable to install an SNMP card or a Modbus card Follow below procedure to connect communication wiring and install the software For RS232 port you should use a DB9 cable as follows For USB port you should use a USB cable as follows For SNMP or MODBUS card you should use R...

Page 20: ...ility connection switch on the AC circuit breaker At this moment the inverter is turned on already However there is no output generation for loads Then If LCD lights up to display the current inverter status commissioning has been successful After pressing ON button for 1 second when the utility is detected the inverter will start to supply power to the loads If no utility exists simply press ON b...

Page 21: ... four buttons on the right side of the display NOTE To accurately monitor and calculate the energy generation please calibrate the timer of this unit via software every one month For the detailed calibration please check the user manual 10 2 LCD Information Defined 20 ...

Page 22: ...apacity Indicates PV input voltage power and current kW power in Kilowatt Volt Voltage in volt Amp Current in Amp Indicates battery voltage charge current and percentage of charge Vac Voltage in volt percentage of charge A Current in Amperes Indicates the generated PV production Indicates the PV Indicates the grid If the icon flashes that means the grid is unavailable Indicates the battery capacit...

Page 23: ... button AC GRID Voltage Frequency AC OUTPUT Voltage Frequency Power in kiloWatt Power in kilo Volt ampere percentage of charge in AC Output PV INPUT Voltage Power BATTERY Voltage percentage of charge ENERGY Daily production Total production Button Function Press this button to reach the next choice for increase the value In the setting menu press this button to previous choice or decrease the valu...

Page 24: ...Setting Display Procedure Enter On Up Down Esc Off Input voltage V or frequency Hz of AC Grid input Procedure 23 ...

Page 25: ... Frequency Hz voltage V power W or percentage of AC load output Input voltage V or power W of PV input Procedure Procedure 24 ...

Page 26: ... Battery voltage V or percentage SoC Today or total energy generated Procedure Procedure 25 ...

Page 27: ...plus of energy to the grid The photovoltaic production allows to charge the batteries and to feed in the surplus of energy to the grid The AC Output is deactivated the load is not supplied The photovoltaic production allows to supply the load and to charge the batteries The grid brings the additional needs to charge the batteries The photovoltaic production allows to charge the batteries The grid ...

Page 28: ...cted from the Hybrid The photovoltaic production allows to feed in the surplus of energy to the grid The AC Output is deactivated the load is not supplied The batteries are disconnected from the Hybrid The photovoltaic production allows to supply the load and to charge the batteries The grid is disconnected from the Hybrid The photovoltaic production allows to supply the consumers The batteries br...

Page 29: ...The grid is disconnected from the Hybrid The batteries bring the additional needs to supply the load The grid is disconnected from the Hybrid The photovoltaic panels are disconnected from the Hybrid The grid brings the additional needs to supply the load The photovoltaic panels are disconnected from the Hybrid 28 ...

Page 30: ...r other types of battery please consult with installer for the details Charging voltage Default Value Note Max charging current 25A It can be adjusted via software from 5Amp to 25Amp Floating charging voltage default 55 0 Vdc It can be adjusted via software from 50Vac to 59Vdc Max absorption charging voltage default 58 0 Vdc It can be adjusted via software from 50Vac to 59Vdc Battery overcharge pr...

Page 31: ...d inverter is connected to energy meter with RS485 communication port It s to arrange self consumption via Modbus card to control power generation and battery charging 2 For three inverter application Equipped with Modbus card II three hybrid inverters are connected to energy meter with RS485 communication port As a control centre Modbus server will control power generation and battery charging of...

Page 32: ... observed when working on batteries a Remove watches rings or other metal objects b Use tools with insulated handles c Wear rubber gloves and boots d Do not lay tools or metal parts on top of batteries e Disconnect charging source prior to connecting or disconnecting battery terminals f Determine if battery is inadvertently grounded If inadvertently grounded remove source from ground Contact with ...

Page 33: ...yclable when send to a secondary lead smelter or waste material collection point Following local State Provincial and Federal National regulations applicable to end of life characteristics will be the responsibility of the end user unless pick up was arranged Other environmental related items can be found on the battery s MSDS which can be obtained via the Lead Crystal website www leadcrystalbatte...

Page 34: ...r reference Warning Icon flashing Description Overload Overload Over temperature alarm Over temperature No electrical ground Ground loss Situation Solution Fault Code Fault Event Icon flashing 01 DC bus voltage exceeds the upper threshold 1 Disconnect AC circuit breaker first Then disconnect DC circuit breaker 2 Until LCD screen completely shuts down turn on DC breaker first It will show No Utilit...

Page 35: ...nverter to be cooled to room temperature 3 If the error message still remains please contact your installer 09 PV input voltage exceeds the upper threshold 1 Check if the open circuit voltage of PV modules is higher than 500VDC 2 If PV open circuit voltage is less than 500VDC and the error message remains pelase contact your installer 10 Auxiliary power failed Auxiliary power means switch power su...

Page 36: ...installer 13 PV insulation resistance is too low 1 Check if the impedance between positive and negative poles to the ground is greater than 1MΩ 2 If the impedance is lower than 1MΩ please contact your installer 15 A difference occurred in the readings from the main and secondary controllers 1 Please disconnect AC breaker first and then disconnect DC breaker 2 After LCD screen is completely off tur...

Page 37: ...erter 4 If error message remains please contact your installer 23 Overload fault 1 Remove exessive loads Be sure that total connected loads are less than maximum power consumption this inverter can support 2 Then restart the inverter 24 Battery disconnected 1 Check if battery cable is connected firmly 2 If error message remains please contact your installer 25 Inverter current is too high for a lo...

Page 38: ...an fault 1 Please check if fans are runing ok 2 If fans are runing ok please shut down inverter first and then restart it 3 If fans are stop runing or error message remains after restart the inverter please contact your installer 28 OP Current Sensor fault 1 Shut down the inverter completely 2 Restart the inverter to see if it s ok 3 If error message still remains please contact your installer 29 ...

Page 39: ...f error message still remains please contact your installer 31 Reverse connection of input and output wires 1 Shut down the inverter completely 2 Check if grid wires are connected to AC output terminals 3 If mis connected re connect it correctly And turn on the inverter again 4 If error message still remains please contact your installer 38 ...

Page 40: ... current to the array 0 A GRID OUTPUT AC Nominal Output Voltage 208 220 230 240 VAC Output Voltage Range 184 265 VAC Output Frequency Range 47 5 51 5 Hz or 59 3 60 5Hz Nominal Output Current 13 A Inrush Current 17 A Maximum Output Fault Current 51 A Maximum output Overcurrent Protection 51 A Power Factor Range 0 9 lead 0 9 lag AC INPUT AC Start up Voltage 120 140 VAC Auto Restart Voltage 180 VAC A...

Page 41: ...0 240 VAC Output Frequency 50 Hz 60 Hz auto sensing Output Waveform Pure sine wave Output Power 3000VA 3000W Output Current 14 4A 13 6A 13A 12 5A Efficiency DC to AC 92 BATTERY CHARGER Nominal DC Voltage 48 VDC Maximum Battery Discharging Current 92 A Maximum Charging Current 25 A 40 ...

Page 42: ...PHYSICAL Dimension D X W X H mm 480 x 438 x 117 Net Weight kgs 15 57 INTERACE Communication Port RS 232 USB Intelligent Slot Optional SNMP Modbus WIFI and AS 400 cards available ENVIRONMENT Protective Class I Ingress Protection Rating IP20 Humidity 0 90 RH No condensing Operating Temperature 0 to 40 C Altitude 0 1000 m 41 ...

Reviews: