background image

 

 

INSTALLATION 
MANUAL 

HUBER+SUHNER AG 

Fiber Optics 
Fiber Management Systems 

DOC-0000401065 Rev D 
Date: 19/08/2016 
 
Page 1 of 10 

 

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and 
accessories other than the ones recommended herein. Any installation performed by unqualified personnel  voids the product warranty provided by 
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the 
general handling of these products please contact HUBER+SUHNER. 

 

Optibox 16 

Table of contents 

• ASSEMBLY INSTRUCTION ............................................................... 1

 

 

ASSEMBLY INSTRUCTION 
 

 

Scope of delivery: 

1 x OTB16 Base incl. Inlay  

1 x OTB16 Cover 

6 x OTB Fixing Latches 

1 x OTB Patchfield 

1 x OTB16 Connection Grommet 

8 x OTB U-Shapes Grommet 
 

 

  
 
 

Required tools: 

Screw driver cross recess large 

Drilling machine 

Knife 

Saw 

Clipper 

Cable stripper 

Screws max. ø 6mm and  
suitable anchors for wall  
mounting 

 

 

 

 

 

 

Summary of Contents for Optibox 16

Page 1: ...ty provided by HUBER SUHNER All due care and attention must be exercised when performing the installation of these products For advice concerning the general handling of these products please contact...

Page 2: ...please contact HUBER SUHNER Installation red 3x Cable entry yellow 6x Cable Exit green Area for cableguiding and slots for fixing the cassettes purple Area for cableguiding patching and overlength sto...

Page 3: ...allation of these products For advice concerning the general handling of these products please contact HUBER SUHNER Step 2 Wall mounting For wall mounting put the Box on the wall adapt the three fixin...

Page 4: ...these products please contact HUBER SUHNER Step 4 Overlength frame optional Positions for screwing the overlength frame to the wall Positions for screwing Screws are includ ed the OTB16 to the overle...

Page 5: ...se products For advice concerning the general handling of these products please contact HUBER SUHNER Step 6 Cable entry and fixing V 1 Incoming cables kann be fixed with cable ties at point A and B Th...

Page 6: ...NER Step 7 Mounting of patchfield and cable fixing latch If you are using the patchfield you have to snap it into the inlay Put the snappers into the cutout of the inlay and push it to the left accord...

Page 7: ...se contact HUBER SUHNER Step 8 Cassette versions The OTB16 can be populated with differ ent cassettes You can use SCM A MCM B and SPC C Splitter Cassettes De pends of the way the OTB16 should be popul...

Page 8: ...ontact HUBER SUHNER Step 10 Fibermanagement ACS MCM 1 Splicing area 2 Overlength area and chaos field The ACS System can cover the following quantities 48 pieces 250 m 24 pieces 600 m 12 pieces 900 m...

Page 9: ...products please contact HUBER SUHNER Step 12 Detail Fiber Guiding Tool The fiber guiding tool can be used to place single fibers in the OTB16 It can be bro ken away from its Position The broken out A...

Page 10: ...ools and accessories other than the ones recommended herein Any installation performed by unqualified personnel voids the product warranty provided by HUBER SUHNER All due care and attention must be e...

Reviews: