background image

5288 V5 Server

Acceptance Guide

Issue

03

Date

2019-03-25

HUAWEI TECHNOLOGIES CO., LTD.

Summary of Contents for 5288 V5

Page 1: ...5288 V5 Server Acceptance Guide Issue 03 Date 2019 03 25 HUAWEI TECHNOLOGIES CO LTD ...

Page 2: ...scribed in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to change without notice Every effort has been made in the pre...

Page 3: ...o perform acceptance tests on Huawei 5288 V5 servers The tests include basic function tests management function tests and reliability tests 5288 V5 Server Acceptance Guide About This Document Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd ii ...

Page 4: ...owering On the Server 8 4 1 5 Configuring a RAID Array for Hard Disks 11 4 1 6 Installing an OS 12 4 2 Management Function Test 12 4 2 1 Testing Indicators 12 4 2 2 Testing the Fault Diagnosis LED 13 4 2 3 Querying and Changing the iBMC IP Address 14 4 2 4 Powering On and Off the Server Remotely 16 4 2 5 Querying Server Component Information 17 4 3 Reliability Test 18 4 3 1 Testing PSU Redundancy ...

Page 5: ...t Information 22 5 2 Test Result List 22 6 Customer Suggestions and Result Confirmation 24 6 1 Customer Suggestions 24 6 2 Result Confirmation 24 5288 V5 Server Acceptance Guide Contents Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd iv ...

Page 6: ...ests obtain the OS installation DVD or image or a deployment server Ensure that the OS is on the Huawei server compatibility list To obtain the server compatibility list use the Huawei Server Compatibility Checker 2 All test items shall be agreed on by both parties concerned 3 Observe related rules and criteria during the test Because the items usually have been tested before delivery you can omit...

Page 7: ...OS l The console is a common PC or Notebook running Windows XP or Windows 7 l The Ethernet switches are layer 2 or layer 3 switches 2 2 Test Environment 2 2 1 Hardware Configuration Item Description Remarks Vendor Device model 5288 V5 Server Acceptance Guide 2 Networking Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd 2 ...

Page 8: ...oller card Model Firmware version Cache capacity Battery type Remote management card iBMC Model Firmware version Power supply Model Quantity NIC Model GE 10GE Quantity PXE NC SI function Maximum number of PCIe slots Specifications Type Weight in full configuration Dimensions H x W x D 5288 V5 Server Acceptance Guide 2 Networking Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd 3 ...

Page 9: ...iguration Port Description Quantity IPMIitool IPMI protocol test tool 1 stress 1 0 0 Stability stress test software 1 5288 V5 Server Acceptance Guide 2 Networking Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd 4 ...

Page 10: ...quisites are met and the steps are performed l FAIL The test result is not the same as the expected result after the prerequisites are met and the steps are performed l NT The test is not performed because customer requirements change or the test environment does not meet requirements 5288 V5 Server Acceptance Guide 3 Test Result Conventions Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd...

Page 11: ...et server operating requirements For details about the requirements see the server user guide Procedure 1 Unpack the server 2 Record the server product name 3 Open the chassis cover Record the quantities and models of CPUs DIMMs hard disks PSUs RAID controller cards and NICs 4 Record the maximum hardware specifications including the maximum number of CPUs hard disks and PCIe slots maximum memory c...

Page 12: ...n the front and rear panels and the product name and model nameplate 2 Open the chassis cover Check whether the internal module layout is suitable no main component is covered by another one no ventilation channel is blocked and the slots of CPUs DIMMs fan modules and PCIe cards are clearly marked Expected Results The server hardware module marks are clear and legible the internal module layout is...

Page 13: ... Before connection check whether the server is equipped with one PSU or two PSUs in 1 1 redundancy mode Expected Results 1 The server is properly installed in the cabinet 2 The power distribution in the cabinet is appropriate Test Result Remarks 4 1 4 Powering On the Server Case No 4 1 4 Test Objective To verify that the server can be properly powered on Test Networking Diagram N A Prerequisites T...

Page 14: ...is displayed 2 Select Advanced and press Enter 3 Select Socket Configuration and press Enter 4 Select Processor Configuration and press Enter Record CPU 1 and CPU 2 information 5288 V5 Server Acceptance Guide 4 Test Cases and Records Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd 9 ...

Page 15: ...5 Select Memory Topology and press Enter Record memory information 5288 V5 Server Acceptance Guide 4 Test Cases and Records Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd 10 ...

Page 16: ...ing a RAID Array for Hard Disks Case No 4 1 5 Test Objective To verify that a RAID array can be configured for hard disks on the server Test Networking Diagram N A Prerequisites The server is powered on Procedure NOTE Before installing an OS for the server configure a RAID array as required For example configure RAID 1 if the server has two hard disks or RAID 5 if the server has three or more hard...

Page 17: ...s test item if the OS you use is on the server compatibility list This is because Huawei has verified the OS compatibility with the server 2 You can choose another OS for verification For details see the Huawei Server Compatibility Checker 4 2 Management Function Test 4 2 1 Testing Indicators Case No 4 2 1 Test Objective To verify that the server has indicators and the indicators function properly...

Page 18: ...ate a PSU hardware error Observe the PSU indicator and record its status and color changes Expected Results 1 The server components have status indicators and the status indicators function properly 2 The PSU indicator correctly indicates the PSU hardware error Test Result Remarks 4 2 2 Testing the Fault Diagnosis LED Case No 4 2 2 Test Objective To verify that 1 The fault diagnosis LED is availab...

Page 19: ... hardware error l If the power cable of the left PSU is removed the fault diagnosis LED displays P01 l If the power cable of the right PSU is removed the fault diagnosis LED displays P02 Test Result Remarks 4 2 3 Querying and Changing the iBMC IP Address Case No 4 2 3 Test Objective To verify that the iBMC IP address can be successfully queried and changed Test Networking Diagram See section 2 1 N...

Page 20: ...owing screen is displayed 2 Select Advanced and press Enter 3 Select IPMI iBMC Configuration and then press Enter 4 Select iBMC Configuration and then press Enter 5288 V5 Server Acceptance Guide 4 Test Cases and Records Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd 15 ...

Page 21: ...s is successfully queried and changed The iBMC IP address can be successfully pinged from a PC on the same network segment as the iBMC IP address Test Result Remarks The default iBMC IP address is 192 168 2 100 4 2 4 Powering On and Off the Server Remotely Case No 4 2 4 Test Objective To verify that the server can be remotely powered on and off 5288 V5 Server Acceptance Guide 4 Test Cases and Reco...

Page 22: ...ly Expected Results The server is remotely powered on and off Test Result Remarks 4 2 5 Querying Server Component Information Case No 4 2 5 Test Objective To verify that you can query server component information on the iBMC WebUI Test Networking Diagram See section 2 1 Network Diagram Prerequisites You have logged in to the iBMC WebUI 5288 V5 Server Acceptance Guide 4 Test Cases and Records Issue...

Page 23: ...rmation model speed and speed ratio Expected Results Component information is queried successfully on the iBMC WebUI Test Result Remarks 4 3 Reliability Test 4 3 1 Testing PSU Redundancy Case No 4 3 1 Test Objective To verify that PSUs on the server work in redundancy mode Test Networking Diagram See section 2 1 Network Diagram Prerequisites l The server is powered on l A Linux OS has been install...

Page 24: ...Power on the server and start the server OS 2 Log in to the iBMC WebUI and query the current fan speed 3 Remove one of the fan modules and check whether the OS is still running properly 4 Log in to the iBMC WebUI and query the current fan speed Expected Results After the fan module is removed the server OS is still running properly and the speed of the other fan modules increases for better coolin...

Page 25: ...ic recovery function of all Huawei RAID controller cards is enabled by default only for new hard disks 2 If an original card is used the automatic recovery function can be enabled by modifying RAID controller card configuration items 4 4 Stability Test 4 4 1 Testing Long Term Stability Case No 4 4 1 Test Objective To test the server long term stability performance Test Networking Diagram See secti...

Page 26: ...llowing command in the src directory stress c n t 43200 n indicates the number of virtual cores of the server 4 Check whether the OS is operating properly after the 12 hour test Expected Results The OS is operating properly and no error is recorded in the log Test Result Remarks 5288 V5 Server Acceptance Guide 4 Test Cases and Records Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd 21 ...

Page 27: ...onnel Test Date Other Information 5 2 Test Result List Test Type Case No Case Name Test Result PASS FAIL NT Basic function test 4 1 1 Checking server hardware 4 1 2 Checking server hardware module marks 4 1 3 Installing the server 4 1 4 Powering on the server 5288 V5 Server Acceptance Guide 5 Test Results and Analysis Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd 22 ...

Page 28: ...iBMC IP address 4 2 4 Powering on and off the server remotely 4 2 5 Querying server component information Reliability test 4 3 1 Testing PSU redundancy 4 3 2 Testing fan module redundancy 4 3 3 Testing hard disk redundancy Stability test 4 4 1 Testing long term stability 5288 V5 Server Acceptance Guide 5 Test Results and Analysis Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd 23 ...

Page 29: ...tomer Suggestions 6 2 Result Confirmation Manufacturer Huawei Technologies Co Ltd Customer Huawei Test Engineer Sign Here Customer Test Engineer Sign Here Date Date 5288 V5 Server Acceptance Guide 6 Customer Suggestions and Result Confirmation Issue 03 2019 03 25 Copyright Huawei Technologies Co Ltd 24 ...