manualshive.com logo in svg
background image

997-451, Issue 6 July 2006

1

Installing the Network Gateway Unit (NGU)

Installing the Network Gateway Unit (NGU)

The Network Gateway Unit (PN: 002-467) consists of a Back Box (with cover) with the following fitted on a chassis: a PSU3A 
to Network Interface PCB and a Network Gateway Module (NGM) PCB. There is space for a PSU3A and two 12Ah batteries. 

2

This basic configuration is used as an ID net Network Booster. The chassis allows a Fibre-optic PCB and RS232 PCB (for 
connection of a network repeater) to be fitted.
The PSU3A provides a 28V output and a battery charger. The PSU3A to Network Interface PCB provides battery and PSU 
fault monitoring, controls the battery charger and converts 28V dc to 5V dc (for the Network PCB). Alternatively, the NGU can 
be powered by an external 28V supply connected at the PSU3A to Network Interface PCB.

The Network Gateway Unit (PN: 002-467) consists of a Back Box (with cover) with the following fitted on a chassis: a PSU3A 
to Network Interface PCB and a Network Gateway Module (NGM) PCB. There is space for a PSU3A and two 12Ah batteries. 
This basic configuration is used as an ID net Network Booster. The chassis allows a Fibre-optic PCB and RS232 PCB (for 
connection of a network repeater) to be fitted.
The PSU3A provides a 28V output and a battery charger. The PSU3A to Network Interface PCB provides battery and PSU 
fault monitoring, controls the battery charger and converts 28V dc to 5V dc (for the Network PCB). Alternatively, the NGU can 
be powered by an external 28V supply connected at the PSU3A to Network Interface PCB.

2

Your Network Gateway Unit, PN: 002-467 should contain:
Back box, NGU, with electronics and cover.
Anti-static Warning Instructions

PN: 997-180

Accessory kit, NGU

PN: 020-685

The Accessory kit should contain:

Battery interlink assembly

PN: 082-082-002

Screw M3 x 6mm button head (8 off)

PN: 775-059

Hex key 2mm

PN: 334-051

Fuse T 2A H 250V (2 off)

PN: 570-106

Fuse T 500mA 250V

PN: 570-105

Ferrite (5 off)

PN: 670-068

Cable tie (1 off)

PN: 233-144

NGU EN54-compliant label

PN: 345-497 or
PN: 345-499

Cable Assembly (PSU3A dc power)

PN: 082-244

Cable Assembly (short: NGM/RS232)

PN: 082-177-001

Cable Assembly (x-over: NGM/repeater) PN: 082-255

Your Network Gateway Unit, PN: 002-467 should contain:
Back box, NGU, with electronics and cover.
Anti-static Warning Instructions

PN: 997-180

Accessory kit, NGU

PN: 020-685

The Accessory kit should contain:

Battery interlink assembly

PN: 082-082-002

Screw M3 x 6mm button head (8 off)

PN: 775-059

Hex key 2mm

PN: 334-051

Fuse T 2A H 250V (2 off)

PN: 570-106

Fuse T 500mA 250V

PN: 570-105

Ferrite (5 off)

PN: 670-068

Cable tie (1 off)

PN: 233-144

NGU EN54-compliant label

PN: 345-497 or
PN: 345-499

Cable Assembly (PSU3A dc power)

PN: 082-244

Cable Assembly (short: NGM/RS232)

PN: 082-177-001

Cable Assembly (x-over: NGM/repeater) PN: 082-255

Check your equipment....

Check your equipment....

Take suitable anti-static precautions, such as wearing a grounded 
wrist strap, when following ALL instructions. Remove all packaging 
from the kit and ensure that it has not been damaged in transit (and 
that no items are missing - see checklist on the left) before proceeding 
any further. If no damage is evident, proceed using the instructions 
below. In the unlikely event that damage has occurred or items are 
missing, DO NOT PROCEED, contact your supplier and refer to the 
panel’s 

Installation & Commissioning Manual

.

To install the Network Gateway Unit it is necessary to remove the 
supplied electronics chassis (to prevent damage), fit the back box to 
the wall, re-install the supplied electronics chassis, and fit any 
required options. Instructions are given on the following pages.

Take suitable anti-static precautions, such as wearing a grounded 
wrist strap, when following ALL instructions. Remove all packaging 
from the kit and ensure that it has not been damaged in transit (and 
that no items are missing - see checklist on the left) before proceeding 
any further. If no damage is evident, proceed using the instructions 
below. In the unlikely event that damage has occurred or items are 
missing, DO NOT PROCEED, contact your supplier and refer to the 
panel’s .

To install the Network Gateway Unit it is necessary to remove the 
supplied electronics chassis (to prevent damage), fit the back box to 
the wall, re-install the supplied electronics chassis, and fit any 
required options. Instructions are given on the following pages.

Installation & Commissioning Manual

MAINS

TERMINATION

BLOCK

MAINS

TERMINATION

BLOCK

BACK

BOX

BACK

BOX

FIBRE-OPTIC

PCB

(OPTIONAL)

FIBRE-OPTIC

PCB

(OPTIONAL)

NETWORK

PCB (NGM)

NETWORK

PCB (NGM)

PSU3A TO

NETWORK

INTERFACE

PCB

PSU3A TO

NETWORK

INTERFACE

PCB

BATTERIES

(NOT SUPPLIED)

BATTERIES

(NOT SUPPLIED)

CHASSIS

CHASSIS

PSU3A

(OPTIONAL)

PSU3A

(OPTIONAL)

EARTH

TERMINATION

KIT (OPTIONAL)

EARTH

TERMINATION

KIT (OPTIONAL)

ISOLATED

RS232 PCB

(OPTIONAL)

ISOLATED

RS232 PCB

(OPTIONAL)

OBSERVE PRECAUTIONS FOR HANDLING 

ELECTROSTATIC SENSITIVE DEVICES

OBSERVE PRECAUTIONS FOR HANDLING 

ELECTROSTATIC SENSITIVE DEVICES

ATTENTION

ATTENTION

MAINS

TERMINAL

BLOCK

L, N, E

L, N

PSU

3A

SAFETY

EARTH TO

BACK BOX

EARTH TO

PSU

PCB -

PSU3A

TO

NETWORK

INTERFACE

RIBBON

28V DC

PCB -

NETWORK

(NGM)

PCB -

FIBRE-

OPTIC

(OPTION)

RIBBON

5V DC

CH1

CH2

2

ID NET

CH1

RX/TX

CH2

RX/TX

2

ID NET

BATTERIES

EARTH TO

UNIT COVER,

& EARTH TO

CHASSIS

PSU

FAULT

28V DC

FROM

EXTERNAL

SOURCE

(OPTION)

(OPTION)

(OPTION)

REPEATER

RS232

28V

PCB -

ISOLATED

RS232

(OPTION)

Note:

See Section ‘PSU3A to Network
Interface PCB - if using PSU3A’
for 28V supplies to external
equipment.

CROSS-

OVER

RIBBON

(OPTION)

by Honeywell

Содержание Notifier 002-467

Страница 1: ... or PN 345 499 Cable Assembly PSU3A dc power PN 082 244 Cable Assembly short NGM RS232 PN 082 177 001 Cable Assembly x over NGM repeater PN 082 255 Check your equipment Check your equipment Take suitable anti static precautions such as wearing a grounded wrist strap when following ALL instructions Remove all packaging from the kit and ensure that it has not been damaged in transit and that no item...

Страница 2: ...the cover ensure earth lead is connected 1 Using a suitable sized drilling bit for holes to take up to 6mm No 12 sized wood screws drill a hole at position A in the wall Fit a suitable sized wall plug or equivalent 2 Hold the back box in position at hole A ensure the panel is level and mark the position of the remaining fixing holes B Remove the back box and store safely 3 Drill two holes at posit...

Страница 3: ...er end of the mains cable is factory fitted to the mains terminal block G Ensure the mains cable is routed as shown in the illustration Pull tight the cable clip at the side of the back box Connect the PSU earth lead H to the upper blade on the back box Connect the 4 way power cable I and 10 way ribbon cable J supplied with the NGU between the PSU3A and the PSU3A to Network Interface PCB Use the s...

Страница 4: ...8V dc Power Supply Optional The external dc power supply must satisfy the ratings given in the section NGU Electrical Specifications The mains block earth connection must still be connected to earth see Wiring Connections Mains and Safety Earth on the previous page 1 Bring the 28V dc cable into the back box via a 20mm knockout Route the cable behind the chassis as close as possible to the rear wal...

Страница 5: ... external supply has its 0V connected to mains earth the earth fault monitoring circuit will detect a fault Jumper Link Setting Earth Fault Monitoring EFM If cables are connected at J1 and or J2 ensure jumper links are fitted as follows Channel 1 WO1 Channel 2 WO2 When using fibre optic cables ensure jumper links are fitted in the following positions instead Channel 1 FO1 Channel 2 FO2 For further...

Страница 6: ... must be at JP4 PARK NOT JP2 CHRG INHIB if charging is permanently inhibited the batteries will discharge resulting in a battery fault message at the fire panel Never Jumper Link Setting JP1 and JP3 are used in conjunction with TB3 as described above JP2 is used to permanently inhibit the charger JP4 is used if the charger is not to be inhibited Always place link on JP4 See the description of TB2 ...

Страница 7: ...e NOT the cross over cable supplied with the NGU to connect to the RS232 port on the NGM Network repeater use screened multi core cable to connect SK1 on the NGU s Isolated RS232 PCB to connector SK1 on the Isolated RS232 PCB in the repeater Isolated RS232 PCB Kit PN 020 478 PCB PN 124 300 1 Position the Isolated RS232 Board A as shown and secure it to the chassis using the four M3 x 8 SEM screws ...

Страница 8: ... To achieve the transmission path integrity required by EN54 2 12 5 3 the repeater and NGU must be physically connected as shown opposite to create a single enclosure CROSS OVER RIBBON TERMINATION PCB PSU INTERFACE PCB NGU SEE NGM AND PSU3A TO NETWORK INTERFACE PCB PROCEDURES NGU TO IDR 6A REPEATER INTERCONNECTIONS REPEATER SEE 997 411 SECTION 2 8 FOR DETAILED WIRING INFORMATION NGM DC POWER CONNE...

Страница 9: ...erature compensation 3mV C cell Battery fuse rating T 6 3A H 250V Final end battery voltage 21V Charger ripple voltage 140mV RMS Low Voltage Shut Down If the battery voltage drops below 21V then the batteries are disconnected automatically to avoid system malfunction and deep discharge causing permanent damage Battery capacity should be selected to ensure sufficient backup time in the event of mai...

Отзывы: