HP110 AND HP145 SINGLE SPEED HAND PUMP OPERATING 

INSTRUCTIONS 

TDS:- 

1316 

Prepared by:-  M.Davies 

Approved by:- 

 

Date: 09/09/14 

REV NO:- 

 

 

 

 

ECO:-  

4282 

 

 

 

 

 

Page 

1

 

of 

4

 

 

INTRODUCTION 

 
The HP110 AND HP145 single speed hand pumps are manually operated hand pumps suitable for a wide range of 
applications. Both pumps are supplied complete, with a pre-filled oil reservoir ready for immediate use. They 
features low handle effort characteristics for easy operation, a lightweight design and is of strong durable steel 
construction. The HP110 and HP145 have a max working pressure of 700 bar. 
 

SAFETY NOTES 
 

All equipment used must be rated for the same operating pressure i.e 700 bar. (10,000 psi). 

DO NOT

 mix high and 

low pressure components. If in doubt contact your local Hi-Force Distributor. 
 
Sufficient time should be allocated to planning your hydraulic system. Make sure that all system components are 
adequate for the intended operation. 
 
Ensure that the pump has sufficient oil capacity to operate the cylinder being used. 
 

DO NOT

 exceed the rated pressure of the pump or rated capacity of the cylinder. Never tamper with the internal 

safety relief valve of the pump. 
 
Whenever possible use a pressure gauge in the system to prevent overloading.  
 

The pump must only be used on single acting cylinders 

 

TEST, EXAMINATION AND SERVICE. 

 

1.  

Visually inspect all equipment before use for signs of damage or wear and tear. Any defective or suspect 
equipment should be repaired or replaced immediately. 

 

2.  

All high-pressure hydraulic equipment should be thoroughly examined and proof tested by a competent 
engineer at least once a year - more frequently for heavy use. 

 

3.  

Ask your Hi-Force distributor about the full Hi-Force Repair facilities and the Hi-Force Test and Examination 
Service - available for all makes of high-pressure hydraulic equipment.

 

 
HOSE CONNECTION. 

 

1.  

Hose connections are 3/8NPT and must be properly tightened using a quality pipe thread sealant or 1-2 turns of 
P.T.F.E tape taking care 

NOT

 to allow loose ends of the tape to enter the hydraulic system. 

DO NOT

 over 

tighten connections - it can cause premature failure or rupture of fittings at below rated capacity. 
 

2.  

Connect the male couplers on the hose ends to the female couplers on the cylinder. Ensure that both halves of 
the coupler are completely clean so that no dirt can enter the system. Fully tighten the two halves of the coupler 

by hand only 

– do not use tools. 

 

 

HP110 AND HP145 SETUP AND OPERATION 

 
1. 

The pump may be used either horizontally or vertically with the hose end downwards. The pump is equipped 
with a pressure relief valve factory set at the maximum operating pressure. Before use unscrew transit plug 
and replace with breather on the top of the tank. This will maximise the oil volume available. (HP110 used in all 
diagrams.)

 

See Figure 1.

 

 

 
 
 
 
 

Summary of Contents for HP110

Page 1: ...ND SERVICE 1 Visually inspect all equipment before use for signs of damage or wear and tear Any defective or suspect equipment should be repaired or replaced immediately 2 All high pressure hydraulic equipment should be thoroughly examined and proof tested by a competent engineer at least once a year more frequently for heavy use 3 Ask your Hi Force distributor about the full Hi Force Repair facil...

Page 2: ...vance the cylinder turn the release knob clockwise Operate pump handle See Figure 2 3 Note The cylinder will automatically be held in the advance position and will not retract of its own accord 4 To retract the cylinder turn release knob anti clockwise slowly ensuring that the cylinder does not retract too fast as to make the operation unsafe See Figure 3 ...

Page 3: ...tically with pump head downwards Remove central plug on rear of pump and check oil level using dipstick fitted to plug Use only Hi Force HF032 oil BLEEDING THE HYDRAULIC SYSTEM Connect a cylinder to the pump Position the cylinder below the level of the pump with its pressure ports uppermost Ensure the bleed screw on the pump is open Operate the cylinder 3 4 times over its full stroke and all air s...

Page 4: ...ijan Tel 994 12 447 4100 Email baku hi force com Hi Force Hydraulics Asia S B Selangor Malaysia Tel 603 5569 4209 Email malaysia hi force com Hi Force Nederland BV Strijen Netherlands Tel 31 78 6745488 Email holland hi force com Hi Force Hydraulics Pty Ltd Midrand South Africa Tel 27 11 314 0555 Email south africa hi force com Hi Force FZCO Dubai United Arab Emirates Tel 971 4 815 0600 Email dubai...

Reviews: