PREPARING THE SUBFLOOR

The flooring contractor has responsibility for laying the
floorcovering only when he is satisfied that the subfloor
is in a suitable condition to receive the flooring.

Local regulations regarding subfloors and the
installation of floorcoverings must be complied with.

GENERAL INFORMATION 

(NEW SUBFLOORS OR RENOVATION)

The subfloor must be absolutely hard, level, dry, smooth
and structurally sound.

The subfloor must be free of

cracks and other

irregularities and must not be contaminated with paint,
plaster, oil, grease or any other substance which could
affect adhesion.

Cracks must be filled with an appropriate material.

The following information provides you with basic
installation procedures. For technical products or more
detailed instructions please refer to our technical guide.

171

Tiles

172

Sheet

173

Saga

174

Conductive, dissipative
and antistatic
floorcoverings

174

Conductive flooring with
conductive adhesive and
conductive primer

175

Laying procedure for
residential sheet products

Laying procedures

168 to 175

Cold and hot welding

176

Adhesives

177

Maintenance

178 to 181

Technical guide

Technical guide

Te

chnical

guide

Summary of Contents for SubFloor

Page 1: ...ities and must not be contaminated with paint plaster oil grease or any other substance which could affect adhesion Cracks must be filled with an appropriate material The following information provide...

Page 2: ...y increased to normal working temperatures over 5 7 days Glueline temperature 28 C contact technical department for further information Old carpeting Remove clean the subfloor and apply a smoothing co...

Page 3: ...furniture When positioning furniture pay attention not to drag heavy objects over the floorcovering Laying procedure for Saga 1 2 Tracing the guide lines axis perpendicular to main entrance the perpen...

Page 4: ...dhesive which has low water content Copper strips code 0584 Width 1 cm Average length 250 lm Thickness 6 100 mm Weight about 3 6 kg 1 Apply a conductive primer The coverage should be 100 150 g m2 Leav...

Page 5: ...as a guide line It is beneficial to place a flat straight edge beneath the joint to be cut This will avoid damaging the subfloor and ensure a tight butt joint is achieved Butt the sheet edges togethe...

Page 6: ...Nera Contract Mipolam Activa 250 Mipolam Troplan 100 Classic Imperial Ambiance GTI GTI AS Decor Attraction Creation Artline Except Slate and Peeble PUR treatment is a protective polyurethane surface...

Page 7: ...DYNATECH CLEAN FRESH ECOLINE N 7 BRIAL JONTEC 300 CALYPSO DYNATECH ALKA AZ 70 NEOMAT A JONTEC COMBINET TASKI FORCE DOPOMA INTENSO ALKALINE CLEANING AGENT SUPER CLEANER JONTEC STRIDE JONTEC DEGRAISSAN...

Page 8: ...182 Technical guide Due to printing limitations there may be variations between the colours of the actual flooring and illustrations shown in this catalogue Samples are available upon request Notes...

Reviews: