background image

 

Installation and Operating Instructions

 

                        

 

 

 

 

 

www.heckert-solar.com

 

03.12.2014

 

 

 

Manufactured with 

sustainable energy

 

Installation and Operating Instructions  

   

Summary of Contents for NeMo 54 P 195

Page 1: ...Installation and Operating Instructions www heckert solar com 03 12 2014 Manufactured with sustainable energy Installation and Operating Instructions...

Page 2: ...alent of the corresponding mains network operator along with the relevant health and safety and accident prevention measures Failure to observe these stipulations may result in grave personal injury o...

Page 3: ...nverter while under load can result in fatal injury due to arcing NEVER disconnect the solar generator from the power inverter while it is still connected to the network 2 General information regardin...

Page 4: ...ote and reported immediately in writing Our modules are normally delivered in an upright position on a non returnable pallet so that one person can remove the individual units without risk of back inj...

Page 5: ...itions You should therefore multiply the module s indicated Isc and Uos values by a factor of 1 25 when determining the voltage ratings of components current ratings of conductors and sizes of fuse fo...

Page 6: ...snow load and type of roof rafter or purlin type may require the fitting of a set of crossbars Please consult with Heckert Solar before considering any other type of installation The modules must not...

Page 7: ...any material that may result in the module being exposed to and therefore damaged by sharp or pointed edges or uneven structures The snow load at base sk measured in kN m is calculated using local lev...

Page 8: ...perly inserted Plug in connectors conform to protection class IP67 and sockets to IP65 Both components are therefore permanently protected from dust Please pay careful attention to the instructions su...

Page 9: ...ig 7 Max Systemspannung Max system voltage Tension syst me maxi 1000 VDC Typ Type Type Anzahl Numbers Nombre Typ Type Type Anzahl Numbers Nombre Typ Type Type Anzahl Numbers Nombre NeMo 54 P 195 26 Ne...

Page 10: ...int For integrated roof construction of the HS_P M xxx_4 Solrif R modules on e g slate shingle seam concrete tile etc an additional test for external fire spread according to the standards ENV 1187 4...

Page 11: ...GmbH Carl von Bach Strasse 11 D ll liability for infringement of patents or other third party rights that might arise from the operation of these modules is likewise excluded unless otherwise specific...

Page 12: ...12...

Page 13: ...ng the wire in place squeeze the crimp tool handles together until the ratchet releasses 4 Pressed Asembled Push contact with cable into the connector housing until you hear the contact give audible c...

Reviews: