background image

     

            

  

 

 

 

Point of Use Water Heater 

Installation & Instruction Manual 

 

THIS APPLIANCE IS NOT INTENDED FOR USE BY PERSONS  

(INCLUDING CHILDREN) WITH REDUCED PHYSICAL, SENSORY OR MENTAL 

CAPABILITIES, OR LACK OF EXPERIENCE AND KNOWLEDGE, UNLESS THEY 

HAVE BEEN GIVEN SUPERVISION OR INSTRUCTION CONCERNING USE 

 OF THE APPLIANCE BY A PERSON RESPONSIBLE FOR THEIR SAFETY. 

 

CHILDREN SHOULD BE SUPERVISED TO ENSURE THAT THEY 

 DO NOT PLAY WITH THE APPLIANCE. 

 

 

 

 

These instructions should be read in full before commencing the installation.                                                                                      
We recommend that the installation should only be carried out by a suitably qualified 

person. 

 

The 

Heatstore HS65VT-Eco

 heater is an open outlet, thermal storage water heater for 

use with Heatstore recommended fittings for one outlet only. 
It operates on the displacement principle i.e. when cold water is admitted into the 

bottom of the tank, hot water flows out through the outlet.  

 

Installation 

 

We recommend that this unit should be installed in the following order: 

 

1.

 

Fit wall bracket. 

 

2.

 

Fit mains electrical cable to the unit.  

 

3.

 

Fit heater to the wall. 

 

4.

 

Connect plumbing to the unit. 

 

5.

 

Replace the front cover. 

 

6.

 

Fill the unit with water and check for leaks. 

 

7.

 

Connect mains electrical cable to the fixed wiring. 

 

8.

 

Set the weekly mechanical timer. 

 

9.

 

Turn unit on and check operation. 

 

10.

 

Demonstrate operation to user. 

 

Please Note:- 
When removing the front cover, we recommend that you first remove the two top fixing 
screws, but only LOOSEN the two bottom screws. 

This will aid when replacing the front cover during installation. 

 

 

 
 
 
 
 

 

 
 

Summary of Contents for HS65VT-Eco

Page 1: ...orage water heater for use with Heatstore recommended fittings for one outlet only It operates on the displacement principle i e when cold water is admitted into the bottom of the tank hot water flows out through the outlet Installation We recommend that this unit should be installed in the following order 1 Fit wall bracket 2 Fit mains electrical cable to the unit 3 Fit heater to the wall 4 Conne...

Page 2: ...any unit that is to be filled from the heater Electrical Connection The installation must be in accordance with the current BS7671 IEE Wiring Regulations and Part P of the Building Regulations WARNING THE UNIT MUST BE FILLED WITH WATER BEFORE POWER IS SWITCHED ON 1 The heater is suitable for 240 230V single phase A C supply 2 The live brown and neutral blue wires must be connected to the designate...

Page 3: ...ecial open outlet taps as recommended by Heatstore The economic performance of the heater will be enhanced by lagging the hot water pipe from the heater to the outlet Oversink and Undersink Installation Before final assembly of the tap the appropriate restrictor insert must be selected and fitted into the end of the cold inlet pipe on the heater see Table A The correct insert will ensure that the ...

Page 4: ...h the bezel keeping the front cover square to the wall 3 Once the mechanical programmer is engaged into the bezel adjust the position so that it is a snug fit over the appliance Backplate 4 Replace the top fixing screws x2 then press the cover at the base while tightening the bottom fixing screws x2 5 Check that the mechanical programmer is free to spin and the switch is in its aperture 6 The appl...

Page 5: ...ent time and day Rotate the dial slowly in the clockwise direction until the correct time and day segment on the dial is approaching the arrowhead shown at the top of the dial Note the dial is printed with the 24 hour clock 6 00 am 6 on the dial and 6 00 pm 18 on the dial Programming switching times see Diagram 6 Set the tappets between the desired ON and OFF period required ALL the tappets must b...

Page 6: ...er first establishing that the temperature is as required the knob may be removed and the blanking grommet supplied free with heater inserted in the hole This grommet is a relatively loose fit and can be made more secure by the use of suitable silicone sealant or PTFE tape etc not supplied Draining the Tank If it is required to drain the tank this can be effected by undoing the screw in the base p...

Page 7: ...or disconnection If you feel that your installation may suffer from a water failure we recommend the fitting of a non return water check valve After Sales Service We offer a technical advisory service on the telephone to contractors and other customers with problems in the field Ring 0117 923 5375 E Mail enquiries heatstore adivision co uk Remember to quote the exact type of unit as written on the...

Page 8: ...l details of terms and conditions are available on request MANUFACTURED FOR VICTORIA ROAD AVONMOUTH BRISTOL BS11 9DB TEL 0117 923 5375 FAX 0117 923 5374 Website www heatstore co uk A4 Leaflet No 578 2018 11a ...

Reviews: