background image

STOP!

STOP!

16657-NG

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

1-800-577-9663

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

Summary of Contents for RAINIER

Page 1: ...ly or product information call our toll free number 1 800 577 9663 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST ...

Page 2: ... This page intentionally left blank ...

Page 3: ...ed See page 3 for required and optional materials and quantities BUILDING RESTRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you mu...

Page 4: ...stallation Level q Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A q Safety Glasses q Tape Measure q Paint Tools q Ladder q Caulk Gun ...

Page 5: ...xterior caulk that is paintable 1 GALVANIZED ROOFING NAILS 3 Lbs For shingles PAINT FOR TRIM 1 Quart Use 100 acrylic latex exterior paint WOOD GLUE Exterior Rated REINFORCED WOOD FLOOR FRAME OPTIONAL WOOD FLOOR FRAME NOT INCLUDED IMPORTANT x2 x8 2 x 4 x 10 5 x 10 x 305 cm Treated Lumber x11 2 x 4 x 10 5 x 10 x 305 cm Treated Lumber x9 Cut to 2 x 4 x 117 5 x 10 x 297 1 cm 2 x 4 x 117 5 x 10 x 297 1...

Page 6: ...LOCK FOR 3 4 1 9 CM MEASUREMENT 2 x 3 x 25 5 x 7 6 x 63 5 cm PARTS LIST INVENTORY YOUR PARTS before you begin We suggest sorting parts by the category they are listed in x2 x1 1 x 4 x 96 2 5 x 10 x 244 cm HHP x4 2 x 4 x 28 3 4 5 x 10 x 70 cm SU x2 2 x 4 x 59 3 4 5 x 10 x 152 cm JRA x4 2 x 4 x 92 5 16 5 x 10 x 234 cm HQ x2 1 x 3 x 94 1 2 2 5 x 7 6 x 240 cm PF x4 2 x 3 x 41 5 x 7 6 x 104 cm PD x4 2 ...

Page 7: ...identification Loft panel is 7 16 1 1 cm thick Roof panels are 7 16 1 1 cm thick 7 16 x 45 1 8 x 96 1 1 x 115 x 244 cm 7 16 x 41 7 8 x 96 1 1 x 106 x 244 cm 7 16 x 23 7 8 x 45 1 8 1 1 x 61 x 115 cm 7 16 x 48 x 96 1 1 x 122 x 244 cm 7 16 x 23 7 8 x 41 7 8 1 1 x 61 x 106 cm x2 x2 x2 x2 x1 ...

Page 8: ...L DOORS PARTS LIST NAIL BOXES Shown Actual Size FASTENER HARDWARE BAG Shown Actual Size DOOR HARDWARE Not Actual Size 3 4 1 9 cm 3 4 1 9 cm 3 4 1 9 cm Bagged seperately special coating 64 Metal Threshold x1 x1 x1 x4 x7 x11 x2 x2 3 7 6 cm 2 5 0 cm x2 x5 BOXES BOXES 2 5 0 cm 3 7 6 cm 2 5 0 cm 1 1 4 3 2 3 4 1 9 cm x18 x57 x84 x50 x28 x1 x1 x2 x2 ...

Page 9: ...ed to the outside of the siding where they serve the dual purpose of framing and trim 8 The EZ Frame design transfers the roof load to the side walls allowing for reduced framing at the front and back wall 9 Treated floor frame and Oriented Strand Board OSB floor not included All of our buildings have been engineered to withstand demanding wind and snow loads If you live in an area with extreme wi...

Page 10: ...For best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x3 4 x 4 x 116 5 8 10 x 10 x 296 2 cm Treated Lumber Fasteners for Frame to 4 x 4 3 Screws shown as one option Minimum 48 3 screws exterior grade Use only wood treated for ground contact and fast...

Page 11: ...05 x 305 cm 116 5 8 296 2 cm 2 x 4 x10 5 x 10 x 305 cm Requires x4 MUST be treated lumber Caulk x1 Allow new concrete slabs to cure for at least seven 7 days A treated 2 x 4 5 x 10 cm sill plate is required when installing your shed on concrete Hint Purchase full length treated lumber Use a high quality exterior grade caulk beneath all sill plates Fasten 2 x 4 5 x 10 cm sill plates to slab using a...

Page 12: ...ths and quantities as shown Orient parts as shown on flat surface Measure and mark from end of boards NOTE Use Treated Lumber For Floor Framing FLOOR FRAME NOT INCLUDED 3 7 6 cm x36 2 x 4 x 116 5 8 5 x 10 x 296 2 cm Treated Wood 2 x 4 x 117 5 x 10 x 297 2 cm Treated Wood TREATED TREATED Flush at ends Flush at ends Flush at ends Flush at ends Floor framing materials not included See page 3 for size...

Page 13: ...re the same the frame is square The diagonal measurement will be approximately 167 3 8 425 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and sq...

Page 14: ...ner flush to the floor frame Fig A Secure panel with two 2 nails in the corners Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner is flush to the floor frame Fig B Secure panel with two 2 nails in the corners Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floo...

Page 15: ... NOT INCLUDED FINISH 5 2 5 cm x137 96 243 8 cm 116 5 8 296 cm 120 305 cm 96 244 cm 23 7 8 60 6 cm 20 5 8 61 cm 23 7 8 61 cm 48 122 cm Flush Grid lines UP 12 30 5 cm 6 15 cm Flush Flush Flush Continue installing panels with rough side up painted grid lines Use a chalk line or grid lines on panels for 2 nails 6 apart on edges and 12 apart inside panel You have finished Installing your floor panels D...

Page 16: ...installing floor panels Re level if needed The floor should be used as a level work surface for wall construction Organize your wall sections during subassembly to avoid over handling of the walls HINT IMPORTANT DOOR SIDEWALL SIDEWALL FRONTWALL BACKWALL DOOR ...

Page 17: ...1 2 3 8 cm 1 1 2 3 8 cm 94 1 2 240 cm Orient parts on edge on floor as shown Nail using two 3 nails at each connection 2 3 7 6 cm x6 2 x 3 x 48 5 x 7 6 x 122 cm 2 x 3 x 94 1 2 5 x 7 6 x 240 cm 2 x 3 x 96 5 x 7 6 x 244 cm PT PT NK PR PARTS REQUIRED x1 x1 x2 BACK WALL FRAME 2 3 7 6 cm Nails NK PR PT DOOR HINT For easier nailing stand on frame ...

Page 18: ... 3 nails at each connection and two 3 screws at middle connection 3 4 FINISH 5 You have finished building your back wall frame Flush 2 3 7 6 cm Nails PARTS REQUIRED 2 x 3 x 45 5 x 7 6 x 114 3 cm 2 x 3 x 94 1 2 5 x 7 6 x 240 cm x1 x1 PR 3 7 6 cm x6 BACK WALL FRAME NC PR 3 7 6 cm x2 DOOR 2 3 7 6 cm Screws 2 3 7 6 cm Nails ...

Page 19: ...TS REQUIRED 3 8 x 48 x 96 1 x 122 x 244 cm Use a 2x3 for support Use a 3 4 gauge block at edges of panel 3 2 1 x1 Install with primed side facing up LIP EDGE SQUARE EDGE 3 4 GAUGE BLOCK BACK WALL PANELS For squareness maintain 3 4 measurement along panel edges Nail using 2 nails 6 apart on edges and 12 apart inside panel 12 30 5 cm 6 15 cm DOOR Do not nail in groove 3 4 Gauge Block ...

Page 20: ...1 2 247 6 cm 3 4 1 9 cm Install with primed side facing up Flush Flush Use a 3 4 gauge block at edges of panel Nail using 2 nails 6 apart on edges and 12 apart inside panel Proceed to building your wing wall panels For squareness maintain 3 4 measurement along panel edges Use a 2x3 for support 12 30 5 cm 6 15 cm Do not nail in groove DOOR LIP EDGE SQUARE EDGE 3 4 Gauge Block 3 4 Gauge Block To dra...

Page 21: ...nto OB Fig A 3 2 1 Secure flush to edges using eight 1 1 4 screws 10 apart You have finished building two sets of wing wall assemblies Set and aside Continue building your back wall x4 2 x 3 x 72 5 8 5 x 7 6 x 184 5 cm OB 1 1 4 3 cm x32 BEGIN Use 2x3 s for support Flush Flush 2 1 2 6 35 cm 2 1 2 6 35 cm 10 25 4 cm Approximately Primed Side Down x2 OB x2 DOOR Fig A ...

Page 22: ...ssemblies onto frame with top of panels flush Fig A 6 5 2 5 cm x34 PARTS REQUIRED x1 x1 You have finished attaching your wing walls FINISH 7 BACK WALL Pre assembled Pre assembled LEFT RIGHT 6 15 cm DOOR Flush Fig A Do not nail in groove Use 2x3 for support Primed side UP HINT To draw panels tight at seams angle nail ...

Page 23: ...rom the backside of the gable panels Fig A You will assemble TWO RIGHT and TWO LEFT assemblies Place trim PD on floor Orient red ends as shown Place a left or right gable panel onto trim primed side down Fig A Locate trim PD flush to edges and secure with six 1 1 4 screws 11 apart Repeat steps 1 4 to assemble two left and two right assemblies 1 1 4 3 cm x24 Primed side is down Use a 2x3 on flat fo...

Page 24: ...sembled x1 Pre assembled LEFT RIGHT CO 3 7 6 cm x2 Place the left gable panel onto wall frame primed side up and onto CO Make sure edge of panel lines up with right edge of groove Fig B Nail with 2 nails 6 apart 2 Fig A CO Screws 3 7 6 cm Flush Line up seam with right edge of groove Edge of groove 3 8 0 9 cm Fig B Seam FINISH 4 You have finished building your backwall Carefully flip the back wall ...

Page 25: ...S REQUIRED 2 x 3 x 22 1 2 5 x 7 6 x 57 cm You have finished building your Front Wall Frame FINISH 4 x1 x2 1 1 2 3 8 cm 22 1 2 57 cm 1 1 2 3 8 cm 1 1 2 3 8 cm 1 1 2 3 8 cm 1 1 2 3 8 cm 48 3 4 124 cm 48 3 4 124 cm Use LV as a spacer do not nail 2 3 7 6 cm Nails at all connections Use LV as a spacer do not nail LV PR PR PT PT 2 x 3 x 94 1 2 5 x 7 6 x 240 cm BEGIN 1 FRONT WALL FRAME 2 x 3 x 96 5 x 7 6...

Page 26: ... front frame as shown with primed side facing up Use a 3 4 gauge block on edges of panel Nail panel to frame with 2 nails 6 apart 3 4 GAUGE BLOCK FRONT WALL PANELS Use a 2x3 for support For squareness maintain 3 4 measurement along panel edge DOOR Do not nail in groove 3 4 Gauge Block 3 4 Gauge Block 3 4 Gauge Block 6 15 cm ...

Page 27: ...4 1 9 cm 3 4 1 9 cm Flush 4 5 3 Place RIGHT panel on front frame Use a 3 4 gauge block on edges of panel Nail panel to frame with 2 nails 6 apart For squareness maintain 3 4 measurement along panel edge DOOR 3 4 Gauge Block 3 4 Gauge Block To draw panels tight at seams angle nail Do not nail in groove ...

Page 28: ...ls onto frame with top of panels Fig A FRONT WALL PANELS Flush Use a 2x3 for support Flush x1 x1 Pre assembled Pre assembled LEFT RIGHT Nail left and right wing wall assemblies using 2 nails 6 apart 6 15 cm DOOR Fig A Primed side UP To draw panels tight at seams angle nail Do not nail in groove LEFT RIGHT ...

Page 29: ...sembled x1 Pre assembled LEFT RIGHT CO 3 7 6 cm x2 Place the left gable panel onto wall frame primed side up and onto CO Make sure edge of panel lines up with right edge of groove Fig B Nail with 2 nails 6 apart 2 Fig A CO Screws 3 7 6 cm Flush Line up seam with right edge of groove Edge of groove 3 8 0 9 cm Fig B Seam FINISH 4 You have finished building your frontwall Carefully flip the frontwall...

Page 30: ...finished building one side wall frame Proceed to attach wall panels 3 2 x 3 x 46 1 4 5 x 7 6 x 117 cm 2 x 3 x 68 3 4 5 x 7 6 x 174 6 cm 2 x 3 x 70 1 4 5 x 7 6 x 178 cm SIDE WALL FRAMES NH OU OZ NH OZ OZ OU x4 NH 22 1 4 57 cm 46 1 4 117 5 cm 46 1 4 117 5 cm 70 1 4 178 5 cm 94 1 4 244 5 cm 1 1 2 3 8 cm 1 1 2 3 8 cm 70 1 4 178 5 cm 46 1 4 117 5 cm 1 1 2 3 8 cm Center on marks Stagger Seams Stagger Se...

Page 31: ...ng one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with two 2 nails PARTS REQUIRED 3 8 x 48 x 72 1 x 122 x 183 cm x2 3 4 GAUGE BLOCK SIDE WALL PANELS DOOR 5 8 1 6 cm 48 122 cm 3 4 1 9 cm 3 4 1 9 cm LIP EDGE For squareness maintain 3 4 and 5 8 measurement alo...

Page 32: ... 72 1 x 61 x 183 cm x2 3 8 x 48 x 72 1 x 122 x 183 cm x2 SIDE WALL PANELS 3 4 GAUGE BLOCK For squareness maintain 3 4 and 5 8 measurement along panel edge For squareness maintain 3 4 and 5 8 measurement along panel edge DOOR Carefully flip your sidewall over Repeat STEPS 1 8 to assemble your second side wall DOOR 48 122 cm 3 4 1 9 cm 5 8 1 6 cm 6 15 cm 12 30 cm LIP EDGE SQUARE EDGE 5 8 1 6 cm 23 7...

Page 33: ...ATION 3 7 6 cm x8 KP DOOR 2 5 cm 6 15 cm Nail 2 nails first 2 5 cm Nail 3 7 6 cm Screw 3 7 6 cm Screw 3 7 6 cm Screw 3 7 6 cm Screw Fig A Fig B 120 305 cm 2 3 7 6 cm Screws First nail lower edge of panel to floor frame using 2 nails 6 apart Angle nail to hit floor frame Fig A 3 Screw back wall uprights to floor using two 3 Screwss Fig B 4 You have finished standing your back wall FINISH 5 Do not n...

Page 34: ...Then secure with one 2 nail in the upper corner Fig B Nail along the panel edge into the trim using 2 nails spaced 6 apart Nail along bottom of panel using 2 nails 6 apart Angle nail to hit floor frame Fig C DOOR Stand right sidewall on floor It is important to secure the sidewall in the following order DOOR 6 15 cm 6 15 cm Fig C Fig D 3 7 6 cm Screw 2x3 3 7 6 cm Nail Panel Same Measurement Fig B ...

Page 35: ... screw Fig E Repeat process to secure the right side of the frontwall 3 DOOR Center frontwall on floor side to side Nail the frontwall flush to the floor using 2 nails 6 apart Angle nails to hit floor frame Fig A Nail the lower sidewall corner to the frontwall trim with one 2 nail Fig B 1 BEGIN Stand frontwall on floor It is important to secure the frontwall in the following order CENTER 6 15 cm 6...

Page 36: ...trim OB as shown Secure PF to wall using six 1 1 4 screws 7 1 2 apart Screw through panels into PF Fig A 2 BEGIN 1 Repeat above steps to secure the back wall lower gable trim 3 You have finished installing your lower gable trim FINISH 4 DOOR 7 1 2 19 cm Approximately PF PD OB OB PD PF Two points contact each other 1 1 4 3 2 cm Screw PF Fig A Panel ...

Page 37: ...ther at the peak Nail gusset to rafters using twelve 2 nails in pattern shown 3 Flip over rafter assembly and repeat STEPS 2 3 to attach second gusset to other side 4 Repeat STEPS 1 4 to build THREE additional rafter assemblies 5 PARTS REQUIRED Fit base of rafters in corners of back wall 120 305 cm RED ENDS TOGETHER RED ENDS TOGETHER RAFTER HALF Temporary support OO FINISH 6 You have finished asse...

Page 38: ...hown Attach with two 3 screws at each end Fig A Maintain the measurements between rafters 1 FINISH 2 You have finished installing your rafters 3 7 6 cm x16 PARTS REQUIRED x4 Rafter Assemblies 22 1 4 56 5 cm 24 61 cm 22 1 4 56 5 cm 24 61 cm 24 61 cm NOTE Measurements from inside of panels BEGIN RAFTERS Align over studs DOOR Center on mark for wall stud Flush Fig A Angle Screw ...

Page 39: ...N Install SU at same height as top plates and level Install using two 3 nails at each connection as shown 1 PARTS REQUIRED 2 x 4 x 59 3 4 5 x 10 x 152 cm SAME HEIGHT CENTER LOFT JOISTS 3 7 6 cm 1 4 6 mm 1 4 6 mm SU x2 DOOR ...

Page 40: ...r best results use an exterior grade wood glue 3 Nail HHP onto JRA using six 3 7 6 cm nails in the pattern as shown 4 Repeat STEPS 3 4 to build THREE additional sub assemblies 5 HHP JRA PARTS REQUIRED 2 x 4 x 28 3 4 5 x 10 x 70 cm 2 x 4 x 92 5 16 5 x 10 x 234 cm 3 7 6 cm x24 LOFT JOISTS HHP x4 JRA x4 DOOR BUILD FOUR ASSEMBLIES ...

Page 41: ...emblies and flip one end to end so they will produce a 4 x 4 loft joist 6 Spread glue on the surfaces which come into contact with one another as shown 7 Nail the two sub assemblies together using eleven 3 7 6 cm nails in the pattern as shown 8 Repeat STEPS 6 8 to build a second 4 x 4 loft joist 9 You have finished assembling your loft joists FINISH 10 3 7 6 cm x22 LOFT JOISTS DOOR ...

Page 42: ...lush on the front side of each of the back two rafters Attach each joist with one 3 screw angled through the joist into the top plate Then screw through rafter into the loft joist with one 3 screw 2 1 Check rafters are still 24 on center 3 You have finished installing your loft joists FINISH 4 BEGIN Check 24 61 cm is maintained ...

Page 43: ...ttention Load not to exceed 400 lbs 181 kg evenly distributed across Loft PARTS REQUIRED IMPORTANT Using only FOUR 2 nails nail loft panel in place to allow racking of the roof You will complete nailing the loft panel later 3 2 BEGIN 1 You have temporarily finished your loft panel 2 5 cm x4 7 16 x 48 x 96 1 x 122 x 244 cm LOFT PANEL DOOR ...

Page 44: ...y known as racking Roof panels may cause serious injury until securely fastened Attach the 45 1 8 x 96 panel with the rough side up painted grid lines side with a 3 4 measurement on the rafter Fig B and the panel flush at the peak Fig A Secure panel with two 2 nails in the corners 1 BEGIN Two Nails 2 5 cm x196 PARTS REQUIRED ROOF PANELS 3 4 GAUGE BLOCK DOOR 7 16 x 23 7 8 x 41 7 8 1 1 x 61 x 106 cm...

Page 45: ...surement Fig F G 3 Attach the lower gable panels flush to the upper panels Fig H and 3 4 on rafter Fig I and with a 1 4 measurement at the gable trim Fig J Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Repeat process to attach roof panels on the opposite side 4 PARTS REQUIRED ROOF PANELS 3 4 GAUGE BLOCK DOOR DOOR 22 1 4 56 5 cm 24 61 cm 22 1 4 56 5 cm 24 61 cm 24 61 ...

Page 46: ...Complete installation of Loft panel using 2 nails spaced 24 FINISH 2 BEGIN You have finished your loft panel Attention Load not to exceed 400 lbs 181 kg evenly distributed across Loft 1 2 5 cm x11 LOFT PANEL DOOR ...

Page 47: ... 2 5 cm x4 Attach temporary supports KP with 1 1 4 screws in middle and 2 screws at ends Tighten securely DOOR HINT Look for 3 8 SPACER attached to doors 1 x 4 x 96 2 5 x 10 x 244 cm x2 KP KP Make sure spacer is attached Tighten screws securely OFFSET Screw at ends 2 4 cm Bottom edges flush Screw in middle 1 1 4 3 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED ...

Page 48: ...open properly 5 FINISH 6 You have finished installing your doors Screw hinge boards into wall supports and floor using four 3 screws as shown Make sure screws go into framing and floor Fig C D 4 3 7 6 cm Screws into the wall support and floor frame Fig B Center 3 8 measurement on right edge of groove Fig C 3 8 1 cm Fig D Angle 3 7 6 cm Screw Attach temporary support OO as a ledger board flush unde...

Page 49: ...sing 3 4 screws as shown Fig A Center trim ZJ over doors and secure using eight 2 finish nails into framing as shown Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown in Fig B Use two screws at seams 3 4 1 9 cm x50 ZJ Center Install 3 4 screws from inside x6 2 Nails x8 Fig B 14 35 5 cm Approximately Two Screws Door Trim Hinge Board Fig A Door Panel ...

Page 50: ... 2 x 3 x 69 5 x 7 6 x 175 cm x2 2 5 cm x14 DOOR WEATHERSTRIP OO FINISH 5 On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C 3 Secure OO using seven 3 screws through outside trim into OO Fig C 4 DOOR OO Screws 2 5 cm x14 1 2 5 cm OFFSET Screws 2 5 cm 1 2 5 cm OFFSET Secure OO using seven 3 screws through outside trim into OO Fig B 2 ...

Page 51: ...OOR HARDWARE 3 With door closed mark hole location for bolt to extend into HINT Extend bolt to leave a mark in wood Tap bolt with hammer Drill 3 8 hole deep enough for bolt to slide into 2 Mount barrel bolt flush at top of OO on left door using 3 4 screws as shown Fig A 1 x1 3 4 1 9 cm x4 HINT With door closed extend bolt and tap with hammer to leave a mark in wood for drilling DOOR x1 3 4 1 9 cm ...

Page 52: ...lar ties should be flush to the roof panels Ensure the collar ties are level before nailing HINT For best appearance install collar ties on back side of rafters PARTS REQUIRED 1 x 4 x 96 2 5 x 10 x 244 cm x2 2 1 2 5 cm x12 COLLAR TIES Flush Flush Flush Flush FINISH 3 You have finished installing your collar ties KP DOOR DOOR KP ...

Page 53: ...anels using 2 finishing nails as shown Repeat Step 1 installing HQ over seam at back side 2 1 You have finished installing the horizontal gable trim HQ HQ PARTS REQUIRED Flush LEVEL 2 5 cm x20 TRIM 2 5 cm 2 5 cm HQ x2 1 x 3 x 94 1 2 2 5 x 7 6 x 240 cm DOOR ...

Page 54: ...ovided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED No drip edge on sides Roof Felt Drip Edge Start here Drip edge is only installed on the front and back sides of this shed Install over roof felt or over roof deck Do not use nails on side of drip e...

Page 55: ...g at front of shed install first row of shingles with notch at 1 past roof edge or flush with drip edge BEGIN 1 2 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails 2 BACK OF SHED FRONT OF SHED FRONT OF SHED BACK OF SHED Notch or Drip Edge Notch Roof Deck 1 2 5 cm Flush with starter row Flush with starter row NEVER DRIVE FASTENE...

Page 56: ...iling Look for either of the following If the rain slot of the shingle installed over the bend is ABOVE the bend and 3 to 4 of it overhangs down over the bend continue shingling up to the peak You have enough to nail shingle down over the bend If the rain slot of the shingle installed over the bend is BELOW the bend install the shingle over the bend and overlap the rain slot to get the 3 to 4 over...

Page 57: ...shown below If shingles overlap at ridge cut to peak with a utility knife Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line 6 7 8 9 10 SHINGLES continued If more than 5 to rain slot you must install another row of...

Page 58: ... cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED FRONT OF SHED Flush 24 to 26 Pieces ...

Page 59: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have fi nished your ridge cap FINISH 8 Cut at top of rain slot Flush to shingles Trim cap off flush to shingles Cap 4 10 cm ...

Page 60: ... This page intentionally left blank ...

Page 61: ... This page intentionally left blank ...

Page 62: ...all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic latex exterior paint or an acrylic latex solid ...

Reviews: