background image

I N S T R U C T I O N S

Mastbase Blocks

 

1988, 1990, 3123, C8508, 3192

Over-the-Top Blocks

 

3002, 3003, 3004, C8322, C8624

N15W24983 Bluemound Rd. • Pewaukee, WI 53072 U.S.A.

Telephone: (262) 691-3320 • Fax: (262) 701-5780

Web: www.harken.com • E-mail: [email protected]

Install 1988,1990, 3123, 3192 Mastbase Blocks

Part  

No.

Block

Max 

Line Ø

Maximum  

Working Load 

(MWL)

Breaking Load 

(BL)

Purchase 

Fasteners (FH) 

A4 (316) or A2 (18-8)  

stainless steel

Size

Type

Qty

1988

Mastbase

3/8"

10 mm

2500 lbs 

1136 kg

5000 lbs 

2272 kg

1/4"

6 mm

Flathead

3

1990

Mastbase

1/2"

 

12 mm

5000 lbs 

2273 kg

10000 lbs 

4536 kg

5/16"

8 mm

Flathead

4

3123

Mastbase

11/16

18 mm

11000 lbs 

4990 kg

22000 lbs 

9980 kg

5/8"

16 mm

Hexhead 

Bolt

2

C8508

Mastbase

3/4"

19 mm

15000 lbs 

6804 kg

30000 lbs 

13608 kg

5/8" 

16 mm

Hexhead 

Bolt

3

3192

Mastbase

5/8"

16 mm

13227lbs

6000 kg

26455 lbs 

12000 kg

5/8"

16 mm

Hexhead 

Bolt

3

3002 Over the top 

single

3/8"

 

10 mm

2500 lbs 

1136 kg

5000 lbs 

2272 kg

1/4" 

6 mm

Flathead

2

3003 Over the top 

double

3/8"

10 mm

2500 lbs 

1136 kg

5000 lbs 

2272 kg

1/4" 

6 mm

Flathead

4

3004 Over the top 

triple

3/8"

 

10 mm

2500 lbs 

1136 kg

5000 lbs 

2272 kg

1/4" 

6 mm

Flathead

6

C8322 Over the top 

single

1/2

12 mm

2500 lbs 

1136 kg

5000 lbs 

2272 kg

5/8" 

16 mm Flathead

2

C8624 Over the top 

single

9/16"

 

14 mm

5000 lbs 

2272 kg

10000 lbs 

4536 kg

5/8" 

16 mm Flathead

2

Strictly follow all instructions to avoid an accident, damage  

to your vessel, personal injury, or death. See www.harken.com/

manuals for additional safety information.

Note: Install blocks so sheave is leaning away from mast.

 “Harken” 

will be towards mast. See drawing below.

1. Remove  sheave.

 Remove screw from port side of assembly. Pull 

out centerpost from starboard side.  

 

Tip:

 Don’t worry about losing balls in sheave, they are captive. If  

  post is stuck, leave screw halfway in and push on screw head to  

  push post out port side.

2. Mark position of holes

. Keep “Harken” towards mast.

Flat in hole 

retains post

Mast

Port Side: “Harken” must be towards mast.

 

Tip:

 To make sure block is aligned with load, drill forward hole, insert  

  screw and sheave, run line to deck block and let block center itself.  

  Remove and drill other hole(s).

3. Mount carrier.

 Drill holes and screw to deck using sealant, backing  

  plates, and locknuts. 

1988, 1990

 – 

Do not overtighten screws; sheave  

  will bind. 

Tip: Slightly bevel top of hole in deck to allow sealant to mass  

  near top of hole.

4. Installing sheave:

 Slip post in from starboard side and seat end of shaft  

  in flat. Use blue Loctite

®

 on screw threads and secure.

WARNING! You must mount to solid deck construction using speci-

fied fasteners in all mounting holes and nuts, washers or backing 

plates to achieve correct maximum working load.

I N S T R U C T I O N S

Mastbase Blocks

 

1988, 1990, 3123, C8508, 3192

Over-the-Top Blocks

 

3002, 3003, 3004, C8322, C8624

N15W24983 Bluemound Rd. • Pewaukee, WI 53072 U.S.A.

Telephone: (262) 691-3320 • Fax: (262) 701-5780

Web: www.harken.com • E-mail: [email protected]

Install 1988,1990, 3123, 3192 Mastbase Blocks

Part  

No.

Block

Max 

Line Ø

Maximum  

Working Load 

(MWL)

Breaking Load 

(BL)

Purchase 

Fasteners (FH) 

A4 (316) or A2 (18-8)  

stainless steel

Size

Type

Qty

1988

Mastbase

3/8"

10 mm

2500 lbs 

1136 kg

5000 lbs 

2272 kg

1/4"

6 mm

Flathead

3

1990

Mastbase

1/2"

 

12 mm

5000 lbs 

2273 kg

10000 lbs 

4536 kg

5/16"

8 mm

Flathead

4

3123

Mastbase

11/16

18 mm

11000 lbs 

4990 kg

22000 lbs 

9980 kg

5/8"

16 mm

Hexhead 

Bolt

2

C8508

Mastbase

3/4"

19 mm

15000 lbs 

6804 kg

30000 lbs 

13608 kg

5/8" 

16 mm

Hexhead 

Bolt

3

3192

Mastbase

5/8"

16 mm

13227lbs

6000 kg

26455 lbs 

12000 kg

5/8"

16 mm

Hexhead 

Bolt

3

3002 Over the top 

single

3/8"

 

10 mm

2500 lbs 

1136 kg

5000 lbs 

2272 kg

1/4" 

6 mm

Flathead

2

3003 Over the top 

double

3/8"

10 mm

2500 lbs 

1136 kg

5000 lbs 

2272 kg

1/4" 

6 mm

Flathead

4

3004 Over the top 

triple

3/8"

 

10 mm

2500 lbs 

1136 kg

5000 lbs 

2272 kg

1/4" 

6 mm

Flathead

6

C8322 Over the top 

single

1/2

12 mm

2500 lbs 

1136 kg

5000 lbs 

2272 kg

5/8" 

16 mm Flathead

2

C8624 Over the top 

single

9/16"

 

14 mm

5000 lbs 

2272 kg

10000 lbs 

4536 kg

5/8" 

16 mm Flathead

2

Strictly follow all instructions to avoid an accident, damage  

to your vessel, personal injury, or death. See www.harken.com/

manuals for additional safety information.

Note: Install blocks so sheave is leaning away from mast.

 “Harken” 

will be towards mast. See drawing below.

1. Remove  sheave.

 Remove screw from port side of assembly. Pull 

out centerpost from starboard side.  

 

Tip:

 Don’t worry about losing balls in sheave, they are captive. If  

  post is stuck, leave screw halfway in and push on screw head to  

  push post out port side.

2. Mark position of holes

. Keep “Harken” towards mast.

Flat in hole 

retains post

Mast

Port Side: “Harken” must be towards mast.

 

Tip:

 To make sure block is aligned with load, drill forward hole, insert  

  screw and sheave, run line to deck block and let block center itself.  

  Remove and drill other hole(s).

3. Mount carrier.

 Drill holes and screw to deck using sealant, backing  

  plates, and locknuts. 

1988, 1990

 – 

Do not overtighten screws; sheave  

  will bind. 

Tip: Slightly bevel top of hole in deck to allow sealant to mass  

  near top of hole.

4. Installing sheave:

 Slip post in from starboard side and seat end of shaft  

  in flat. Use blue Loctite

®

 on screw threads and secure.

WARNING! You must mount to solid deck construction using speci-

fied fasteners in all mounting holes and nuts, washers or backing 

plates to achieve correct maximum working load.

Отзывы: