background image

 

5.52.248.00.01.02 Rev.02 

 

 

 

 

 

 

 

 

 

 

HADEF Stainless Steel Wire Rope Winch 

 

Type 190/94 + 192/98 

 

 

 

 

 

with fast wirerope movement and disengag-
ing mechanism for the drum 

Type 190/94 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installation,- Operating and  

Maintenance Instructions 

Summary of Contents for 190/94

Page 1: ...8 00 01 02 Rev 02 HADEF Stainless Steel Wire Rope Winch Type 190 94 192 98 with fast wirerope movement and disengag ing mechanism for the drum Type 190 94 Installation Operating and Maintenance Instru...

Page 2: ...e of Contents 1 Information 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 5 2 5 Basic safety measures...

Page 3: ...ructions in this manual Before delivery all products are packed properly Check the goods after receipt for any damage caused during transport Report any damage immediately to the forwarding agent This...

Page 4: ...lt free fully functional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal protective equipment for the operators...

Page 5: ...s especially modified for it and marked by an indication label In reactor containment vessels to transport people The device is not suitable for use on stages and in studios persons must not stand und...

Page 6: ...ransport or improper storage 3 1 Transport The devices are checked and if so adequately packed before delivery Do not throw or drop the equipment Use adequate means of transport Transport and means of...

Page 7: ...a protective roof 190 94 192 98 4 2 1 Wire rope exit The wire rope exit direction must be made as prescribed 4 3 Functions The load is lifted lowered by turning the winch handle The incorporated load...

Page 8: ...er that the prescribed rope exit is correct Make sure the attachment surface is flat plain and that installation is made stress free to ensure safe functioning Use the screws mentioned in the table fo...

Page 9: ...Wire rope deflection Wire rope pulleys must be installed in a position centrically to the rope drum In order to ensure correct winding up of the wire rope on the drum the max wire rope deflection ang...

Page 10: ...sts of 1000 kg capacity and up or with more than one motor driven hoist movement i e lifting and trolley movement must be tested by a licensed qualified person before putting in operation An exception...

Page 11: ...must only be done when the hoist is not loaded Records must be kept of all test results and measures taken 11 2 Monitoring The monitoring and servicing intervals stated are valid for operation under...

Page 12: ...before commissioning and at least every 3 months tighten them if necessary Kind and number of broken threads Position of the broken threads Timing sequence of occurrence of breaks Reduction of the wir...

Page 13: ...y rope turning direction for lifting is not correct Place the wire rope correctly Brake is worn or defective Check brake parts and replace parts that are worn brake discs are humid or oiled Repair or...

Reviews: