background image

IMU-BPP-030-C-2017.08.17 - 1/6

 

CIAT Sp. z o.o. – ul. Langiewicza 62 – 95-050 Konstantynów Łódzki – POLAND 

tel.: (48) 91 432 35 20 – fax: (48) 91 432 35 36 – e-mail: [email protected] – www.gryfit.com 

 

 

 

 

 

INSTALLATION AND USAGE MANUAL  

 

Manufacturer: CIAT Sp. z o. o. – ul. Langiewicza 62 – 95-050 Konstantynów Łódzki, POLAND 

 

CX-5C SMOKE CONTROL DAMPER 

EI 120 (v

ew 

– h

ow

 – i

o) S1500C

10000

 AAmulti  

 

CERTIFICATE OF CONSTANCY OF PERFORMANCE No.

 

1391-CPR-0104/2014-O1 

 

 

 

1 –  

INSTALLATION 

 

Installation should be done by a professional who has been trained in the installation of fire safety elements. 

 

 

1.1 –   OVERALL DIMENSION  

 

To install the damper properly in vertical partition of brick or concrete the required overall dimension is D+50 mm.  

 

 

1.2 –   FIXING AND INSTALLATION 

 

Place the damper axially in the opening. In order to provide partition with fire resistance, it is absolutely necessary 

to respect damper installation border line which is clearly marked on the label to be found on the damper casing. In 

case of installation in the brick or concrete walls, filling should be made of masonry mortar or non-shrink grout. 

 

 

              

NOTE: 

  

-

  While  installing  damper  it  is  inadmissible  to  grime  a  control  mechanism  of  the  damper  with  mortar,  glue  or 

paints. The control mechanism of the damper has to be absolutely protected until the masonry and painting 

works are completed. 

 

-

  The damper blade has to remain closed during installation and until mortar is hardened. The damper casing 

cannot be burdened during installation in partition wall. It can result in deformation of the casing and damage of 

the damper blade.

 

 

-

  Minimum clearance of 200 mm should be left for service between the nearest element of the building and the 

mechanism.

 

 

 

1.3 –   INSTALLATION METHOD 

 

 

CX-5C can be installed in the following vertical and horizontal spaces: 

 

-

  concrete walls thickness min. 110 mm, 

-

  wall from full bricks thickness min. 110 mm, 

-

  walls from aerated concrete thickness min. 110 mm, 

-

  concrete ceilings thickness min. 150 mm. 

 

 

1.3.1 –   VERTICAL PARTITION 

 

Minimum thickness of concrete, aerated concrete or brick vertical partition is 110 mm. It is recommended to use 

optional  UM  installation  brackets  to  facilitate  installation.  Installation  brackets  are  delivered  flat  and  have  to  be 

bended before installation of the product.  

 

 

 

 

 

 

Summary of Contents for CX-5C

Page 1: ...g should be made of masonry mortar or non shrink grout NOTE While installing damper it is inadmissible to grime a control mechanism of the damper with mortar glue or paints The control mechanism of the damper has to be absolutely protected until the masonry and painting works are completed The damper blade has to remain closed during installation and until mortar is hardened The damper casing cann...

Page 2: ... duct it is necessary to carry out a test of closing and opening NOTE Connection of the damper to ventilation or air conditioning duct has to be done coaxially in order to avoid knocking the damper blade against the duct s walls during rotation This is the necessary condition for the appropriate working of the damper The damper should be installed firmly Mechanical tightening and free vibrations o...

Page 3: ...zki POLAND tel 48 91 432 35 20 fax 48 91 432 35 36 e mail info gryfit com www gryfit com 1 5 1 CX 5C SMOKE CONTROL DAMPER with electromagnet and FDG 8 actuator 1 5 2 CX 5C SMOKE CONTROL DAMPER with electromagnet FDG 8 actuator and EMS 1 5 3 CX 5C SMOKE CONTROL DAMPER with SDG actuator ...

Page 4: ...er will close in less then 71s Once it is closed remove the voltage supply from the actuator To open smoke control damper CX 5C apply impulse to the electromagnet recommended from 1s up to 3s which will trigger the mechanism and close the damper within not longer than 30s Once the mechanism was triggered it is necessary to fully close the damper in order to re arm the mechanism ACTUATOR CHARACTERI...

Page 5: ...stributor 4 STORAGE The damper is delivered in the closed position with the complete control mechanism installed and blocked by the mechanical lock in case of FDG actuator that has to be removed before commissioning While installing the damper on the building site the industrial safety regulations should be respected and this manual should be followed in order to avoid damage of the damper The dam...

Page 6: ...cked and necessary maintenance was carried out by personnel authorized by the Manufacturer at least once in the year and it is documented by the written report delivered to Manufacturer or its local Distributor without delay after product check If this condition was not met a guarantee period would be limited to one year Distributor is allowed to extend guarantee conditions to its own risk Warrant...