Page 1: ...SECU S HIGH VOLTAGE ESS User Manual Ver 1 0 2020 11 30 ...

Page 2: ...ors or dealers shall be liable in any circumstances for indirect inci dental or consequential damages The exclusion of implied warranties may not apply in cases under some statutes and thus the above exclusion may not apply Specifications in this document are subject to change without notice Every effort has been made to make this document complete accurate and up to date However GOODWE may need t...

Page 3: ... 9 4 2 Installation Space Requirement 9 4 3 Installation of the System 10 4 4 Electrical Connection 16 4 4 1 Remove covers of the control box and batteries modules 16 4 4 2 Install PE cables 17 4 4 3 Connect power cables 18 4 4 4 Connect Communication cables 19 4 4 5 Dial Switch Settings 20 4 4 6 Cover of the System 20 05 System Operation 23 5 1 Check before power on 23 5 2 Power on 23 5 3 Functio...

Page 4: ...t the carbon dioxide extinguisher or Novac1230 or FM 200 is nearby The fire can not be put out by water ABC is not useful for battery firefighting Firefighters are required to wear full protective clothing and self contained breathing apparatus when fighting fires The battery may explode when the ambient temperature exceeds 150 Please use the appropriate tools and take protective measures when ins...

Page 5: ...operation and maintenance Keep the battery away from open flame or ignition sources Keep the battery away from children Do not dispose of the battery with household waste at the end of its life The battery should be put in the right place and recycled in compliance with local environmental regulations The Energy Storage System consists of 5 8 SECU S2 5 battery modules and 1 BCU S0550 control box h...

Page 6: ... Box 10 Cover of the System Install 4 SECU S2 5 batteries under the control box and at most 4 SECU S2 5 batteries over it which means the system supports 8 SECU S2 5 batteries maximum This manual shows you the installation of 8 batteries 2 3 1 Introduction to SECU S2 5 Battery 8 9 5 10 6 1 2 3 4 7 ...

Page 7: ...T 2 BAT 3 CAN COM Port 2 ports works the same 4 Dial Switch 5 Indicator Indicator Status Indicator Status Green Light on for 1s and then off for 1s Normal Red Light Blinking on for 1s and then off for 1s Protecting Red and Green Light Blinking red for 1s and then green for 1s Faulty ...

Page 8: ...4 INV 5 BAT 6 BAT 7 Battery circuit breaker 8 Indicator 9 Buttons 10 Display screen 11 Ground point N A N A LMU COM Port CAN COM Port PIN Definition PIN Definition 1 CANH 4 CAN_H 2 CANL 5 CAN_L 3 4 24V 1 2 3 6 7 8 N A 5 6 GND N A N A 7 8 NC N A N A RJ45 Registered Jack ...

Page 9: ...light Keep the equipment away from inflammable explosive and corrosive things The System consists of battery modules a control box and an accessory case Please check outer packing for damage and model before unpacking it If you find any damage or the model is not what you requested do not unpack the product and contact the After sales Service Center as soon as possible Check whether the deliverabl...

Page 10: ...unication cable BAT BAT x1 Grounding cable x2 Terminal resistance x1 Waterproof connector x3 M6 12 Screw x2 Expansion bolt X16 Flat washer x12 M4 Flange nut x2 M5 10 Screw x4 M4 10 Screw x4 M4 8 Screw x32 User manual x1 Nylon tube Front paperboardx1 Back paperboardx1 optional BCU S0550 Control Box Box x1 Control box x1 Case x1 Wall hanging plate x1 Top Cover x1 M5 10 Screw x4 N A N A ...

Page 11: ...8 OT Terminal x4 Pin Terminal x5 N A N A N A ...

Page 12: ...all evaluate its weight capability and the possibility of fall first Meanwhile the System must be grounding The best temperature for the System is 20 45 Avoid exposing the equipment to direct sunlight or water Install the equipment away from heat source or strong interferences to ensure its regular work Keep children away from the equipment 4 2 Installation Space Requirement 1 0 0 0 m m 300 mm 300...

Page 13: ...the System 1 Hold the battery handle to take it out from the packing box and remove the protective case 2 Hold the handle to separate the battery and the installation backboard Keep the removed screws properly for future use ...

Page 14: ...the plate will be placed against the wall while the support surface as the mounting reference and use the SW10mm socket tool to fix the 4pcs expansion bolts to the mounting holes Hanging the battery module keep a distance of 10 30cm between the bottom of the wall hanging plate and the ground and place the plate against the wall Use the SW10mm socket to fix the 4pcs expansion bolts to the mounting ...

Page 15: ...12 5 Put batteries inside the wall hanging plate and push them to the bottom to lock them togeth er 6 Attach the base plate to the battery ...

Page 16: ...d and fourth batteries from bottom to top 8 Take the control box out from the packing box as step 1 and step 2 showed Keep the 4 re moved M5 10 screws properly for future use 9 Fix the female snap lock in the accessory box on the control box 3 5N M M5 ...

Page 17: ...forate the mounting position with an impact drill 10mm diameter 80mm depth and clear the debris from the hole after drilling Mounting hole distribution as follows Mounting holes can follow either rectangular distribution blue border or dia mond distribution green border ...

Page 18: ...15 12 Install the wall hanging change over stand on the wall hanging plate 13 Fix the backboard of the control box ...

Page 19: ...oved from the wall stands since each battery weighs 37 KG 81 6 lbs Raise the platform to ensure safety before installing the last 5 8 bat tery modules The upper part of the battery module can only be wall mounted so the base plate is used for position only Remove the base plate after positioning to re duce stress on the control box 4 4 Electrical Connection 4 4 1 Remove covers of the control box a...

Page 20: ...G are recommended Connect battery module PEC cables by M6 screws and an M6 OT terminal Rec ommended tightening torque is 5N m Connect control box module ground cables by M5 screws and an M5 OT termi nal Recommended tightening torque is 3 5N m Connect PE cables of all batteries and the communication box in sequence except the control box and the first battery under it Then connect the first battery...

Page 21: ...the waterproof joint is properly placed in the plastic ring Do not short circuit the positive and negative terminals of the battery module when installing because there is no disconnecting switch in a single battery module Power cable connection between control boxes and batteries should follow the principle positive to positive negative to negative Connect power cables of all battery modules in s...

Page 22: ... properly placed in the plastic ring Do not short circuit the positive and negative terminals of the battery module when installing because there is no disconnecting switch in a single battery module Recommended torsion for tightening the compression fitting is 7N m Connect communication cables of all batteries and the communication box in sequence except the control box and the first battery unde...

Page 23: ...ide it is inverted Please pay at tention to the specific setting value of the dial switch when setting it 1 Check the battery and the inverter make sure that the power cable communication cable and PE cable inside the battery are connected correctly 2 Set the dial switch properly 3 Turn on the battery circuit breaker 4 4 6 Cover of the System ...

Page 24: ... details before turning on the battery circuit break The ground cable power cable and communication cable are connected cor rectly and firmly The cable ties meet the cabling requirements and proper distribution Also the ties are tight and cut without sharp corners Place the battery in a reasonable space where is clean tidy and no construc tion debris ...

Page 25: ... are equispaced rectangular distribution Required plastic expansion screw torque 10 10 N m The floor must be horizontal when drilling holes in stacking way The paperboards have to be placed on the ground to avoid longitudinal skew 6 Install the top cover of the battery system ...

Page 26: ...ps below 1 Push the handle to ON to turn on the battery circuit breaker 2 Confirm that the battery system indicator is operating normally LCD 1 Take out the outer shell and the maintenance panel of the control box 2 Ensure the battery circuit breaker is OFF 3 Ensure all DC connections are ground and secured 4 Ensure all Communications Connections are ground ...

Page 27: ...ent interface or function F Up Move cursor up or increase value G Down Move cursor down or decrease value H ENT Confirm selection I 1st row Power no function PV power 2nd row Total no function PV generated energy 3rd row Battery SOC of the battery system 4th row Battery System status or error code 5 4 Setting the parameters of SECU S On PV Master app To make sure the battery communicates to the A ...

Page 28: ... will lead to BMS communication failure 5 5 Power off To prevent damages to the battery system please strictly follow the steps below 1 Take out the outer shell and the maintenance panel of the control box 2 Push the handle to OFF to turn off the Battery circuit breaker 3 Confirm that all LED lights are off ...

Page 29: ...act the service center Cell Low Volt Cell low voltage Restart the system If the fault persists please contact the service center IR_Fail Insulation resistance fail to work Disconnect the battery circuit break first Then check whether impedance of the polarities to the ground is greater than 70kΩ and whether there are any insulation faults Restart the system if the problems above are solved If the ...

Page 30: ...re worn Once Every 6 months Check whether there is debris accumulation around the battery to avoid affecting the battery heat dissipation Once Every 6 months Check for water and pest to avoid prolonged intrusion Once Every 6 months Please contact after sales for help if you find any problems that may influence the battery or the inverter Disassemble without permission is strictly forbidden Pleasec...

Page 31: ...970 mm 610 236 2270 mm 610 236 2570 mm 610 236 2870 mm Depth of Discharge DOD 90 Max Charge Discharge Current 50A 1C Rated Power 12 80 kW 15 36 kW 17 92 kW 20 48 kW Communication CAN Operating Temperature Charge 0 50 Discharge 20 50 Humidity 90 Operating Altitude 2000m Protection Degree Type 4X Outdoor Indoor Installation Location Wall Mounted Ground Mounted Certification UL1642 UL1973 FCC UN38 3 ...

Page 32: ...orized modification alteration or parts replacement Change or erase the serial number privately Non observance to the User Manual Improper use or misuse of the battery system Inadequate ventilation The maintenance routine does not follow accepted standards Force Majeure like earthquakes storms thunders overvoltage or fire hazards etc Any external factors ...

Page 33: ... POWER SUPPLY TECHNOLOGY CO LTD No 90 Zijin Rd New District Suzhou 215011 China www goodwe com service goodwe com StorageGo APP SEMS Portal APP SEMS Portal website www semsportal com LinkedIn Company s offical website ...