Campetto 6 Underfloor distributor system

 

 

Seite 1 / 13 

Created 

01.04.2014 

ROEN 

Modified 

14.09.2020 

ROEN 

Object-ID 

359746 

Campetto 6 Underfloor distributor system 

Manual 

 

 

 

 

VERSION 

MODIFICATIONS 

1.0 

First edition

 

1.1 

Editorial changes 

1.2 

Title picture changed 

1.3 

Various additions of hints 

1.4 

Primer coat recommended before filling (Chap. 3.3)

 

 

Summary of Contents for Campetto 6

Page 1: ...014 ROEN Modified 14 09 2020 ROEN Object ID 359746 Campetto 6 Underfloor distributor system Manual VERSION MODIFICATIONS 1 0 First edition 1 1 Editorial changes 1 2 Title picture changed 1 3 Various additions of hints 1 4 Primer coat recommended before filling Chap 3 3 ...

Page 2: ...of delivery 5 2 3 Technical information 5 3 Introduction 6 3 1 Installation conditions Campetto 6 Underfloor distributor system 6 3 1 1 Work to be done on site by customer 6 3 2 Connecting underfloor distributor to power supply 7 3 2 1 Principle drawing 8 3 3 Installation 10 4 Maintenance 11 4 1 Inspection and maintenance schedule 11 4 2 Description of maintenance and inspection works 11 5 Debuggi...

Page 3: ... has been caused by incorrect or non intended use of the product In countries which do not belong to the European Community the national legal reference regulations as well as the standards and regulations applicable in these countries have to be observed for warranty of a corresponding safety level The installation has to be carried out according to the applicable regulations The manufacturer ass...

Page 4: ...ch can only be operated when they are in open mode do not provoke any security risk during the operation risk of unwanted closure of lid manipu lation e g Gas springs are wear parts and must be replaced immediately in case of pressure loss in order to ensure a safe and gradual closing of the cover accident risk Any optional heating system heating cover etc may be installed only by authorized perso...

Page 5: ...nding on model almost maintenance free and therefore very low operating costs fits type KSV 7200 7700 Ø 600mm or max type KSV 7800 Ø 800mm reservoir cover for individual filling by means of a cable exit flap the Campetto 6 can be closed during operation Dimension depth lid strength and electrical installation equipment depend on customer s requests 2 2 Scope of delivery The Campetto casing includi...

Page 6: ... you may have 3 1 Installation conditions Campetto 6 Underfloor distributor system 3 1 1 Work to be done on site by customer The cover system is not sealed against surface water this means that the customer must provide for the drainage of the underfloor distributor system The customer must therefore ensure that an appropriate drainage line or drainage system is installed without drainage drain pi...

Page 7: ...sure that the load capacity of the foundation and or the cover layer corre sponds to the load capacity of the underfloor distributor system in order to prevent subsidence Delivery of concrete pipe has to be done on site by the customer Caution If the Underfloor distributor system is to be used immediately after the excavation work the installation pit must absolutely be secured or locked so that i...

Page 8: ...ed personnel and is the responsibility of the operator 3 2 1 Principle drawing The details necessary for proper installation can be found on the project specific drawing from GIFAS Custom models may vary from the following drawings Hinweis It is recommended that junction boxes at critical locations are filled with BLUE GEL Article 166534 1l Article 174063 2l Article 172210 10l ...

Page 9: ... 14 09 2020 ROEN Object ID 359746 Hint The built in dimensions A x B x C can be found in the project specific drawing provided by GIFAS The cover opens automatically through the use of gas springs They support muscular force and allow for the controlled opening and closing of the cover ...

Page 10: ...erial to the metal Have authorized personnel connect the electrical supply to the junction box and monitor the Campetto in accordance with the following inspection schedule Hint If the cover layer 1 is not strong enough and the Campetto was aligned with the levelling screws the cavity between the concrete foundation 2 and the frame must be filled with concrete or an equivalent material The frame m...

Page 11: ...ed intervals The lid surface needs to be cleaned from dirt in appropriate intervals to ensure a safe and proper closing The underfloor distributor needs to be maintained and revised by professionally trained personnel according to national regulations and standards Work to be done Period Monitor for damage at each use Cleaning of hinge lock and cover surface before closing each time Monitor surrou...

Page 12: ...is product is to be recycled appropriately European directive 2012 19 EU waste electrical and electronic equipment WEEE Bug error Possible cause s Solution Cover can hardly be opened Gas spring failure Replace gas spring Cover can hardly be opened Dirty hinge or gas spring Clean the hinge or gas spring Cover closes too fast Gas spring failure Replace gas spring Cover will not close Cover surface d...

Page 13: ...ndorf CH 9424 Rheineck 49 2137 105 0 39 58 497 82 11 43 6225 7191 0 41 71 886 44 44 49 2137 105 230 39 58 493 99 24 43 6225 7191 561 41 71 886 44 49 www gifas de www gifas it www gifas at www gifas ch verkauf gifas de info gifas it verkauf gifas at info gifas ch 6 2 Imprint GIFAS ELECTRIC GmbH CH 9424 Rheineck www gifas ch Technical changes and errors reserved These installation instructions are t...