background image

 

Geeetech Delta Rostock mini   

G2 pro / G2s pro

 

Building Instruction 

 

 

 

 

(Document version: 04-11, 2016) 

Summary of Contents for Delta Rostock mini G2 pro

Page 1: ...Geeetech Delta Rostock mini G2 pro G2s pro Building Instruction Document version 04 11 2016 ...

Page 2: ...4 4 Mount the endstop and the probe 39 4 5 Mount the hotend 41 5 Mount the smooth rods 42 6 Mount the carriage and the top plate 45 7 Mount the Belt 49 7 1 Assemble the drive wheel 49 7 2 Add the belt 53 8 Connect the Diagonal Rod to the carriage 56 9 Mount the extruder 58 10 Mount the filament holder 61 11 Connect the feeding pipe 64 12 Wiring 67 1Connect wires for motors 68 2Connect extruder mot...

Page 3: ... 3D printer Building and operating your 3D printer involves working with electrically powered equipment so all necessary precautions should be taken and adhered to This printer operates on 12Volts which is supplied by a certified power supply so you shouldn t ever with voltages exceeding 12V but bear in mind there can still be high currents involved and even at 12V extreme causation and safety awa...

Page 4: ...n over all idea of what is involved and how long it might take before starting on the work described 4 Before you start you can sort all the parts in order this will save you time especially when trying to identify individual screws and nuts Take care not to mix up these parts as they may appear to be very similar to each other 5 Ensure you have the necessary skills to carry out the work or enlist...

Page 5: ...th the online videos to help you finish the work For access to the instruction videos please subscribe our YouTube Channel 1 Base Assembly 1 1 Motor holder assembly Name Part Qty Pic Motor holder A3 3 Motor holder support A4 6 Square nut 13 6 M3 x 16 Screw 20 6 M3 washer 5 6 Step1 Select 1 A3 and 2 A4 parts and screw them together with the M3 x 16 20 screws M3 square nut 13 and M3 washers 5 provid...

Page 6: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 4 ShenZhen GETECH CO LTD Take note when assembled one side of the assembly is longer than the other side ...

Page 7: ...658 4110 Fax 86 755 2658 4074 858 Page 5 ShenZhen GETECH CO LTD Repeat the above steps for the other 2 motor holder assemblies Videos 1 2 Connect motor ends to base plate Name Part Qty Pic Base plate A2 1 Square nut 13 9 M3 x 16 Screw 20 9 ...

Page 8: ...658 4074 858 Page 6 ShenZhen GETECH CO LTD M3 washer 5 21 Stepper motor 55 3 Pulley 34 3 M3 x 12 Screw 19 12 Step1 Mount the motor holder assemblies to the 3 tower locations of the base plate A2 Fix them with 9 M3 x 16 Screws 20 Square nuts 13 and M3 washers 5 ...

Page 9: ...tightly be careful not to damage the screws Note Pulley looks different here in the picture but it will not affect the assembly and use Step 3 Mount the 3 motors to the assembled motor holders Fix them with the M3x12 screws 19 and M3 washers 5 Note It is better to have the wire connector mounted so then it is facing either left or right Do not mount it so the connector is facing up or down as it w...

Page 10: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 8 ShenZhen GETECH CO LTD Videos 1 3 Mount the LCD panel Name Part Qty Picture LCD frame A8 1 LCD support A9 2 LCD2004 49 1 ...

Page 11: ...Fax 86 755 2658 4074 858 Page 9 ShenZhen GETECH CO LTD Square nut 13 4 M3 x 16 Screw 20 4 M3 x 12 Screw 19 4 Spacer 37 4 M3 washer 5 8 Knob 48 1 Step 1 Attach the LCD frame A8 to the support plate A9 with the M3 x 16 Screws 20 and M3 square nuts 13 ...

Page 12: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 10 ShenZhen GETECH CO LTD Step 2 Plug the aircraft type spacer 37 in to the 4 screw holes on the LCD2004 A8 frame ...

Page 13: ...x 86 755 2658 4074 858 Page 11 ShenZhen GETECH CO LTD Step 3 Assemble the LCD frame A8 and LCD2004 49 with 4 M3 x 12 Screws 19 and washers 5 Step 4 Install the the knob over the protruding stalk and screw it in place with the screw located in the hole ...

Page 14: ... geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 12 ShenZhen GETECH CO LTD Step 5 Mount the assembled LCD kit onto the base plate Screw it up with 2 M3 x 16 screws 20 M3 square nuts 13 and washers 5 ...

Page 15: ...EETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 13 ShenZhen GETECH CO LTD Videos 1 4 Mount the fan Name Part Qty Picture Fan 40x40x10 45 1 M3 x 16 Screw 20 1 M3 x 25 screw 22 2 ...

Page 16: ...m Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 14 ShenZhen GETECH CO LTD M3 Square nut 13 1 M3 nut 10 2 M3 washer 5 3 Step 1 Mount the fan to the fan mount screwing it up with 2 M3 x 25 screws 22 M3 nuts 13 and washers 5 ...

Page 17: ...2658 4074 858 Page 15 ShenZhen GETECH CO LTD Step 2 Mount the assembled fan mount to the base plate A2 with a M3 x 16 screw 20 and M3 square nut 13 and washer 5 Videos 1 5 Mount the control board Name Part Qty Picture Control board GT2560 set 50 1 Spacer 37 4 ...

Page 18: ...ch com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 16 ShenZhen GETECH CO LTD M3 x 12 Screw 19 4 M3 washer 5 4 Step 1 Plug the aircraft type spacer 37 into the 4 screw holes on the underside of the control board 50 ...

Page 19: ...50 to the base plate A2 with 4 M3 x 12 Screws 19 and m3 washers 5 Note It is better to have the fan pointing directly towards the MOSFET located on the control board as pictured above Don t forget to stick the heat sink 42 on the chip of the A4988 stepper motor driver with sticker 41 Videos 1 6 Mount the print bed Name Part Qty Picture ...

Page 20: ...74 858 Page 18 ShenZhen GETECH CO LTD Building platform M8 1 Heat bed 54 1 Hex Counter sunk head screw 14 3 Spring 3 5 x 20mm 28 3 Wing nut 12 3 M3 washer 5 6 Note For your convenience the heat bed has been pre soldered you can quickly and easily mount them together ...

Page 21: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 19 ShenZhen GETECH CO LTD Step1 Stack the building platform M8 on top of the heat bed 54 keeping the holes aligned ...

Page 22: ...55 2658 4110 Fax 86 755 2658 4074 858 Page 20 ShenZhen GETECH CO LTD Step 2 Thread the M3x30mm Hex Counter sunk head screw 14 through the building platform M8 and heat bed 54 add washers 5 and spring 28 the assembly should now like this ...

Page 23: ...755 2658 4110 Fax 86 755 2658 4074 858 Page 21 ShenZhen GETECH CO LTD Step 3 Locate the assembly over the holes provided in the base plate A2 anf then lock the complete assembly in place with a wing nut 12 Here is the finished picture ...

Page 24: ...ch com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 22 ShenZhen GETECH CO LTD Videos 2 Top Plate Assembly 2 1 Drive wheel mount Name Part Qty Picture Drive wheel mount A5 3 M3x25 Screw 22 6 M3 nut 10 6 M3 washer 5 6 ...

Page 25: ... LTD Step 1 Mount the drive wheel mount to the top plate A5 on A1 screw them up with M3 x 25 screws 22 M3 nut 10 and washers 5 Repeat the procedure for the other two drive wheel mounts Videos 2 2 Endstop mount Name Part Qty Picture Top plate A1 1 Endstop mount A6 3 Endstop 44 3 M2 5 x 16 screw 17 6 ...

Page 26: ... Page 24 ShenZhen GETECH CO LTD M3 x 16 Screw 20 3 Square nut 13 3 M3 washer 5 9 M2 5 nut 9 6 Step 1 Mount the three endstops 44 onto the endstop mounts A6 in the same direction Fix in place with with M2 5 x 16 screws 17 and M2 5 nut 9 ensuring that they are tightly fixed ...

Page 27: ...2658 4110 Fax 86 755 2658 4074 858 Page 25 ShenZhen GETECH CO LTD Step 2 Bend the wire connector a small amount taking care not to break the connector Note You should be very gentle and note the direction or the connector will easily break ...

Page 28: ...e assembled parts onto the top plate A1 And attach them with the M3 x 16 screws 20 M3 square nuts 13 and M3 washers 5 Again take note of the endstop mounting direction Note The opening of all the endstops should either be in the clockwise or anti clockwise direction but they need to be all mounted in the same direction ...

Page 29: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 27 ShenZhen GETECH CO LTD Videos 3 Assembling the carriage ...

Page 30: ...age 28 ShenZhen GETECH CO LTD Name Part Qty Picture Carriage mount A12 3 Belt mount M5 3 Endstop trigger mount M6 3 Diagonal Rod joint M7 6 PCS10UU Linear Bearing 35 6 M3x12mm Screw 19 12 M5x16mm Screw 27 12 M5x20mm Screw 27A 12 M3x40mm Screw 23 3 Spring 29 3 M3 washer 5 24 ...

Page 31: ...xible therefore increase the precision of printing Step 1 Fix the belt mount M5 on the carriage mount A12 using 2 M3 x12 screws 19 and washer 5 Step 2 On the other side of the carriage mount A12 fix the endstop trigger mount again with 2 M3 x 12mm screws 19 and washer 5 Step 3 Connect the diagonal rod joint M7 and the PCS10UU linear bearing 35 on to the carriage mount A12 ensuring that the bearing...

Page 32: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 30 ShenZhen GETECH CO LTD ...

Page 33: ... 755 2658 4110 Fax 86 755 2658 4074 858 Page 31 ShenZhen GETECH CO LTD Step 3 Now insert the M3x40mm screw 23 into the endstop trigger mount with a spring 29 in between Here you need to use washers 5 to correctly complete the assembly ...

Page 34: ...ps for the remaining two carriages When you have completed these all three carriages should be exactly the same and look as in this picture Step 4 Finally insert the rod end bearing holder 3 into the diagonal rod joint M7 fixing it place with a M3x8mm screw 18 and M3 washer 5 Repeat the step for the other 2 carriages ...

Page 35: ...w geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 33 ShenZhen GETECH CO LTD Videos 4 Assemble the print platform 4 1 mount the fan Name Part Qty Picture Spider M1 1 Fan 30x30x10 47 1 Fan mount M2 1 ...

Page 36: ...755 2658 4110 Fax 86 755 2658 4074 858 Page 34 ShenZhen GETECH CO LTD M3 x 16 screw 20 2 M3 x20 screw 21 2 M3 washer 5 2 Step 1 Mount the fan 47 on to the angled slanted face of the fan mount M2 with 2 M3x 20 screws 21 and M3 washers 5 ...

Page 37: ...755 2658 4110 Fax 86 755 2658 4074 858 Page 35 ShenZhen GETECH CO LTD Step 2 Mount the assembled fan mount on the spider M1 with 2 M3 x16mm screws 20 4 2 Mount the Probe mount Name Part Qty Picture Probe mount M4 1 M2 5 x 16 screw 17 2 ...

Page 38: ... probe mount M4 on the spider M1 with 2 M2 5 x16mm screws 17 Taking note that the screws M17 are inserted from the underside of the spider M1 fixing the probe mount M4 to the top side of the spider M1 4 3 Mount the rod end bearing holder and diagonal rod Name Part Qty Picture Diagonal Rod 4 6 rod end bearing holder 3 6 ...

Page 39: ... 2658 4074 858 Page 37 ShenZhen GETECH CO LTD Round head screw with pad 15 6 M3 washer 5 6 M3 x 8 screw 18 6 Step 1 Insert the rod end bearing holder 3 into the diagonal rod joint location of the spider M1 fix it in place with M3x8mm screw 18 and M3 washer 5 ...

Page 40: ... geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 38 ShenZhen GETECH CO LTD Step 2 Slide the diagonal rod 4 on to the rod end bearing holder 3 and fix it in place with a round head screw with pad 15 ...

Page 41: ... com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 39 ShenZhen GETECH CO LTD 4 4 Mount the endstop and the probe Name Part Qty Picture Endstop 44 1 Probe 43 1 Spring 3 5 30 29 1 Probe Lock ring M3 1 M2 5 x 8 screw 16 2 ...

Page 42: ...0 ShenZhen GETECH CO LTD Step 1 Mount an endstop 44 on to the spider M1 at the screw hole located adjacent to the probe mount M4 with 2 M2 5 x 8 screws 16 Step 2 Insert the probe 43 into the probe mount M4 slide on the provided spring 29 and lock it in place with the lock ring M3 ...

Page 43: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 41 ShenZhen GETECH CO LTD 4 5 Mount the hotend Name Part Qty Picture Hotend 57 1 M4 x 16 screw 25 2 ...

Page 44: ...74 858 Page 42 ShenZhen GETECH CO LTD Step 1 Mount the hotend 57 on the now assembled spider M1 with 2 M4 x 16 screws 25 Note Mounting of the single and double hot ends are done exactly the same way Videos 5 Mount the smooth rods Name Part Qty Picture Smooth Rod 1 6 ...

Page 45: ...henZhen GETECH CO LTD M4 x 8 Screw 24 6 M8 Washers 8 6 M4 washer 6 6 Step 1 Slide a M8 washer 8 on to an end of the smooth rod 1 Insert that end of the rod 1 into one of the holes located on the tower of base plate A1 Step 2 Fix the rod 1 in place with M4 washer 4 and M4x8 screw 24 ...

Page 46: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 44 ShenZhen GETECH CO LTD Step 2 Repeat this step for the remaining 5 rods 1 Videos ...

Page 47: ...n GETECH CO LTD 6 Mount the carriage and the top plate Name Part Qty Picture M4 x 8 Screw 24 6 M8 Washers 8 6 M4 washer 6 6 Step 1 Slide the carriages down the smooth rods 1 pairing one carriage with each set of 2 smooth rods 1 You should now have the beginnings of three towers X Y and Z ...

Page 48: ...s are correctly orientated Note If you find it difficult to slide the carriage along the rod or the carriage does not slide smoothly you can slightly loosen the screws on the difficult linear bearing 35 to release some alignment pressure with the smooth rod 1 Step 2 Slide a M8 washer 8 on each top of each smooth rod 1 and then align the top plate A1 and smooth rods 1 until with some pressure the t...

Page 49: ...ech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 47 ShenZhen GETECH CO LTD Photos with PCS8UU linear bearings in this instruction is the previous version here we use PCS8UU instead Picture is just for reference ...

Page 50: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 48 ShenZhen GETECH CO LTD Videos ...

Page 51: ... 4074 858 Page 49 ShenZhen GETECH CO LTD 7 Mount the Belt 7 1 Assemble the drive wheel Part name Part Qty Picture Drive wheel holder 33 3 Drive wheel 32 3 R84zz Ball Bearing 31 6 M3 x16mm screw 20 3 M4 x 25mm screw 26 3 M4 washer 6 3 M4 lock nut 11 3 wing nut 12 3 ...

Page 52: ...ax 86 755 2658 4074 858 Page 50 ShenZhen GETECH CO LTD Step 1 Thread the M3 x 16 screw 20 through the top hole on the drive wheel holder 33 Step 2 Pick up 2 MR84zz ball bearings 31 Insert 1 MR84zz ball bearings 31 into both ends of the drive wheel 32 ...

Page 53: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 51 ShenZhen GETECH CO LTD ...

Page 54: ...2658 4074 858 Page 52 ShenZhen GETECH CO LTD Step 3 Place the drive wheel 32 in to the drive wheel holder 33 and fix it in place with an M4 x25 screw 26 and M4 washer 6 Lock the other end with a M4 lock nut 11 You may need a wrench to tighten M4 locking nut 11 ...

Page 55: ... wheel It is important that you leave enough room for the wheel to turn freely Repeat these steps to assemble the other two drive wheel assemblies Step 4 Fix the drive wheel assembly loosely on the top plate A1 with a wing nut 12 Repeat these steps to mount the other two drive wheel assemblies to the top plate A1 7 2 Add the belt Name Part Qty Picture Timing Belt 36 3 M3 x8 Screw 18 6 ...

Page 56: ...o the timing belt 36 with a leather hole punch or similar not supplied Step 3 Fix one end of the timing belt 36 to the belt mount M5 with a M3x8mm screw 18 and M3 washer 5 Step 4 Guide the timing belt 36 around the motor pulley 34 and back up to the underside of the belt mount M5 Mark the location of the new hole to be punched to allow the timing belt 36 to be fixed to the belt mount M5 Trim the t...

Page 57: ...ECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 55 ShenZhen GETECH CO LTD Note Before you cut the belt be sure that you have the correct length it should be about 110cm long in total ...

Page 58: ... 858 Page 56 ShenZhen GETECH CO LTD Step 5 Tighten the wing nut 12 to to reduce the slack in the timing belt 36 Repeat the above steps for the other 2 timing belts 36 Videos 8 Connect the Diagonal Rod to the carriage Name Part Qty Picture Round head screw with pad 15 6 ...

Page 59: ... it so then the end stop 44 and probe 43 are facing the X tower Step 2 Working with the X axis first slide the diagonal rod 4 on to the on the rod end bearing holder located on the assembled print assembly fixing it on with a round head screw with pad 15 Step 3 Fix the other end of the diagonal rod 4 to the carriage located on the X axis tower with a round head screw with pad 15 ...

Page 60: ...ing device is towards the X tower as shown in the following picture Fix the remaining diagonal rods 4 to the carriages with a round head screw with pad 15 Videos 9 Mount the extruder We shall be using the dual extruder as the example in this assembly guide as most of the steps are very similar to the single extruder model ...

Page 61: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 59 ShenZhen GETECH CO LTD Name Part Qty Picture Extruder 56A B 2 M4 x 12 screw 24A 8 ...

Page 62: ...lease handles on the extruder 56A B are positioned as per the photo below otherwise they will not align with the screw holes in the top plate A1 Step 1 Find out the locating holes on the top plate A1 and mount the the extruder 56 and from the underside of the top plate A1 fix in place with 4 M4x 12 24A screws Repeat this step for the other extruder 56 Dual extruder ...

Page 63: ...2658 4110 Fax 86 755 2658 4074 858 Page 61 ShenZhen GETECH CO LTD Single extruder Videos 10 Mount the filament holder Note If you prefer this step can be left for the very end of the assembly and configuration process Name Part Qty Picture ...

Page 64: ...holes on the top plate A1 and fix in place with M3x16 screw 20 M3 square nut 13 and washer 5 Step 2 Repeat the previous step with the other spool holder side panel A10 fixing in place with M3x16 screw 20 M3 square nut 13 and washer 5 Step 3 Slide the spool holder round rod 2 through the holes provided in the spool holder side panels A10 A11 and lock the spool holder rod 2 in place with the locking...

Page 65: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 63 ShenZhen GETECH CO LTD EXAMPLE 2 G2S ...

Page 66: ... 2658 4110 Fax 86 755 2658 4074 858 Page 64 ShenZhen GETECH CO LTD Note For this dual filament spool you need to use the locking ring to lock the spool on both ends Videos 11 Connect the feeding pipe Name Part Qty Picture Feeding pipe 1 1 ...

Page 67: ...into the push fitting located at the top of the hot end identified by the blue plastic ring and the other end into that of the extruder 56A B Note Before connecting the feeding pipe you need to match the extruder and the hot end From the viewpoint of back Z tower the left side extruder is referred to as extruder 2 and the right one is extruder 1 ...

Page 68: ...658 4074 858 Page 66 ShenZhen GETECH CO LTD Note The hot end at the front nearest the LCD panel is extruder 1 and the one behind it nearest the Z tower is extruder 2 Note If you need to pull the tube out please press the push in fitting blue part while pulling ...

Page 69: ...CH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 67 ShenZhen GETECH CO LTD 12 Wiring Before you start wiring please take a look at the wiring schematics You can see original picture here ...

Page 70: ...EEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 68 ShenZhen GETECH CO LTD 1Connect wires for motors Step 1 Connect wires for X axis motor Step 2 Connect wires for Y axis motor ...

Page 71: ... 755 2658 4074 858 Page 69 ShenZhen GETECH CO LTD Step 3 Connect wires for Z axis motor 2Connect extruder motor s Step 1 Identify which extruder you are connecting this connector plug is for extruder 1 for dual hot end or just the extruder single hot end ...

Page 72: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 70 ShenZhen GETECH CO LTD Step 2 Connect extruder 2 to this connector plug FOR G2S PRO ...

Page 73: ... Page 71 ShenZhen GETECH CO LTD 3Heating wires Note Heating wires do not have a positive or negative wire therefore you can safely connect either wire into the connector plug Step 1 Loosen the screws on the green connector and insert the wires and re tighten the connector ...

Page 74: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 72 ShenZhen GETECH CO LTD Step 2 Connect heat bed wires Step 3 Connect hot end 1 nearest LCD panel heating wire ...

Page 75: ...55 2658 4074 858 Page 73 ShenZhen GETECH CO LTD Step 4 Connect hot end 2 nearest Z tower heating wire Note Take much care when connecting wires Do not rush and do not mix up the wires Take special care not to mix up the wires for heating and the thermistors ...

Page 76: ...4 ShenZhen GETECH CO LTD 4Connect wires for thermistor Step 1 Connect the thermistor from to the heat bed to the left connector plug Step 2 Connect the thermistor from hot end 1 to the right connector plug Step 3 Connect the thermistor from hot end 2 to the middle connector plug ...

Page 77: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 75 ShenZhen GETECH CO LTD 5 Connect wires for endstop Step 1 Connect the X axis endstop to the X max connector plug ...

Page 78: ... www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 76 ShenZhen GETECH CO LTD Step 2 Connect Y axis endstop to the Y max connector plug Step 3 Connect Z axis endstop to the Z max connector plug ...

Page 79: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 77 ShenZhen GETECH CO LTD Step 4 Connect the auto leveling probe endstop to the Z min connector plug ...

Page 80: ... Fax 86 755 2658 4074 858 Page 78 ShenZhen GETECH CO LTD 6Connect wires for Fan Step 1 Connect control board fan to the FAN1 connector plug Step 2 Connect either extruder fans to FAN2 connector plug and the other extruder fan to FAN3 connector plug ...

Page 81: ...onnector plug 7Connect wires for LCD panel Note The LCD controller comes with connectors and two cables the are not to be mixed up as this could cause damage to the LCD SD card reader or controller board so please take care Step 1 Connect the first cable from EXP1 to LCD then connect the second cable from EXP2 to SD card EXP1 to LCD EXP2 to SD card ...

Page 82: ...e 80 ShenZhen GETECH CO LTD Note There is a small screw above the SD card reader If the LCD text display is not very clear you can make some adjustments with this screw to improve the displayed text Do not over turn or apply aggressive force as you may damage the potentiometer ...

Page 83: ...658 4110 Fax 86 755 2658 4074 858 Page 81 ShenZhen GETECH CO LTD 8Connect wires for power input 9Connect the power cable to the input connector of PSU Name Part NO Qty Pic 3D Power cable NO 59 1 Power Supply Unit NO 58 1 Power Cable NO 60 1 ...

Page 84: ...82 ShenZhen GETECH CO LTD Caution You must take extreme care at this point Ensure that you connect the correct wires to the corresponding locations on the power supply Step 1 Connect the wires as shown below This wiring is for G2s Pro This wiring is for G2 pro has only 7 screws ...

Page 85: ...harm or damage the printer If you are unsure of your skills and abilities here please consult a professional BROWN Live L BLUE Neutral N GREEN Ground GND YELLOW RED Positive BLACK Common COM That completes the wiring of GT2560 controller As the power supply unit PSU is not physically connected to the actual printer it is best to be kept next to the printer you should take good care of it keep it a...

Page 86: ...ge 84 ShenZhen GETECH CO LTD 13 Tidy out the wires Use the provided spiral coil and zip ties to neatly bundle the those wires together If you bundle the wires up before wiring the printer you are advised to mark each wire with its function or location so as not to mix them up ...

Page 87: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 85 ShenZhen GETECH CO LTD ...

Page 88: ...GEEETECH www geeetech com Tel 86 755 2658 4110 Fax 86 755 2658 4074 858 Page 86 ShenZhen GETECH CO LTD The Rostock mini G2 G2s has been fully assembled ...

Page 89: ...d correctly aligned Rods are correctly aligned Belts are taut Driving wheel turns smoothly Bed is level in relation to the path of the extruder Filament rolls freely from the spool without causing too much tension on the extruder Current for stepper motors is set to the correct level Wires are correctly connected Couplings and pulleys are fixed tightly Firmware settings are correct including axis ...

Reviews: