background image

Merchandise Information Sheet 

 

 

 

 

          MIS 46-Freezers rev 0 

October 20, 2004 

Installation and Leveling of Stainless Steel                  

All Refrigerator, All Freezer

 

Division: 46

 

Installation  

All Refrigerator and All Freezer  

Topic:

  

Instructions for installing and leveling. 

Electrical Information: 

1.  Each unit must be plugged into its own dedicated 115 Volt, 60 Hz., 

AC circuit.  

2.  The power cord of each unit is equipped with a three-prong grounding 

plug for protection against shock hazards.  It must be plugged directly 
into a properly grounded three-prong receptacle, protected with a 15 
amp time delay fuse or circuit breaker. 

3. 

Do Not

 connect units to a Ground Fault Circuit Interrupter (GFCI) 

circuit. 

 

Location: 

1.  The units must be installed on a floor that is level and strong enough 

to support a fully loaded refrigerator and freezer. 

2.  Consider water supply availability for models equipped with an 

automatic ice maker. 

 
 

Clearances: 

1.  Allow the following clearances for ease of installation, proper air 

circulation, plumbing and electrical connections. 

  Sides -------------- 3/8” 

  Top & Back ------ 1” 

  Between units ---------- 3/16” 

2. 

Do Not

 block toe grille on the lower front of the units. Sufficient air 

circulation is essential for the proper operation of the units. 

 

 
 

Page 1 of 3                                                                                                                                                  PN:  297078900 

Reviews: