background image

Summary of Contents for FPi 6600-2

Page 1: ......

Page 2: ...ersaFeeder 10 Install the Document Feed Trays 11 Install the Power Stacker Support option 12 Install the HCDF 12 Install the MaxiFeeder 13 Install the High Capacity Conveyor Belt 14 Install the High Capacity Envelope Hopper 14 Assemble the Catch Tray option 15 Fill the Sealing Liquid Reservoir 17 Connect the System to Mains Power Supply and Power Up 18 3 Power Up 18 Set the Service phone number 19...

Page 3: ...Set up a Wireless Connection 23 Test the Connection 25 Test the System 26 5 Test the system 26 Shut Down the System 27 Page 2 TOC mrt 03 2014 01 58 ...

Page 4: ... User Interface It can be found under the question mark button on the control panel According to the EC European Commission declaration following the Low Voltage Directive 2006 95 EC the user guide must be available in the national language s of the country where the system is delivered Therefore if the User Guide is not available in your country s language s contact your authorized distributor So...

Page 5: ...nsure that the system is suitable for the local mains voltage Refer to the serial plate on your system for voltage requirements Precaution The general process of automated document handling can sometimes create a build up of static electricity Therefore we recommend that the following measures are taken to reduce the side effects of any electrostatic charge Make sure that you operate the system wi...

Page 6: ... circuit protection max 20 A The following part s is are considered the equipment disconnect device s Power supply cord plug or appliance coupler 12 pole connector located on the right hand side CAUTION DOUBLE POLE NEUTRAL FUSING this means that after operating of the fuse parts of the equipment that remain energized might represent a hazard during servicing Country Specific Conditions Denmark In ...

Page 7: ...t in the European Community More particularly certain materials and components of waste electrical and electronic equipment need special treatment as improper handling or disposal on or into land water or air would represent a major threat to the environment and human health In order to facilitate collection and treatment separated from normal domestic waste electrical and electronical equipment i...

Page 8: ...provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with this instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interfer...

Page 9: ...ccessories from the inserter module This Installation Guide Bottle with sealing liquid Power cable LAN cable Bag with the brushes and the moistening cloth Power stacker support option Box with the catch tray option 1 6 Page 6 mrt 03 2014 01 58 Installation 2 English ...

Page 10: ...ve the screw as indicated in the figure 3 Open the system and remove the bracket on the LH side near the brushes 4 Open the LH cover and remove the cardboard 2 English 7 Page 7 mrt 03 2014 01 58 Installation ...

Page 11: ...he system is connected to a socket outlet that has a protective earth connection Install the Main Modules with optional VersaFeeder When a versaFeeder is part of the system the configuration looks as follows Install the modules as follows Always switch off the system before connecting to or disconnecting from any attached units 1 Place the versaFeeder between the inserter and feeder module Place b...

Page 12: ...ft the feeder module above the versaFeeder fixing plates and lower it until it locks into place Both sides are now locked 5 Connect the 12 pole connector of the inserter to 12 pole socket B of the versaFeeder 6 Connect the 12 pole connector of the versaFeeder to 12 pole socket A of the feeder module 7 Connect the power cables to socket C and D 2 English 9 Page 9 mrt 03 2014 01 58 Installation ...

Page 13: ...es as follows Place both hands under the left and right hand side panel of the feeder module 1 2 Lift the feeder folder module on the front side and slide it onto the pins of the inserter 3 Connect the 12 pole connector to 12 pole socket A of the feeder module 4 Connect the power cable to socket D 10 Page 10 mrt 03 2014 01 58 Installation 2 English ...

Page 14: ... shown in the figure 1 2 Place the front end of the document feed tray underneath the two black rollers 3 Move the document feed tray upwards lifting the black rollers until it is possible to hook the feeder into place 4 Move the document feed tray towards the machine and move the hooks over the mounting points on both sides 5 Let the document feed tray rest on the machine 2 English 11 Page 11 mrt...

Page 15: ...pport as shown in the figure on the power stacker of the inserter Install the HCDF To install the feeder tray of the HCDF As the paper detection actuators are fragile take care of them when re placing document feed trays 1 Pull down lever A 2 Hook in the feeder tray 3 Release lever A 12 Page 12 mrt 03 2014 01 58 Installation 2 English ...

Page 16: ...ion 1 2 Lift the paper feed rollers with the front edge of the maxiFeeder 3 Move the maxiFeeder forward until it hooks behind the frame axle 4 Connect the connector A to the socket B The maxiFeeder is auto detected by the system when the system is switched on This makes it easy to switch over from the standard document feeder tray to the maxiFeeder and vice versa To make use of a maxiFeeder it is ...

Page 17: ...CB CS 2 that is delivered with the High Capacity Conveyor Belt Install the High Capacity Envelope Hopper The complete installation is described in Mounting Instruction 102 Installation of the High Capacity Envelope Hopper that is delivered with the High Capacity Envelope Hopper 14 Page 14 mrt 03 2014 01 58 Installation 2 English ...

Page 18: ...Assemble the Catch Tray option Unpack the box that contains the catch tray 1 2 English 15 Page 15 mrt 03 2014 01 58 Installation ...

Page 19: ...h tray on the RH side of the system assemble it as indicated in the figure 3 If you want to have the catch tray on the LH side of the system assemble it as indicated in the figure 16 Page 16 mrt 03 2014 01 58 Installation 2 English ...

Page 20: ...he job wait approximately 5 minutes for the brushes to moisten or use moistened brushes For instructions on the installation of brushes see the User Guide section Clean and replace brushes If the liquid reservoir is almost empty the touchscreen shows a message to warn you that you should refill the reservoir 2 English 17 Page 17 mrt 03 2014 01 58 Installation ...

Page 21: ...e local voltage is the same as the voltage mentioned on the type plate 1 Connect the system to the mains power supply 2 Use the power switch A to switch the system on The power switch is located on the back of the system 3 Press the on off button next to the display B The system will start up with an empty Job list screen 18 Page 18 mrt 03 2014 01 58 Connect the System to Mains Power Supply and Po...

Page 22: ... as follows Log in as a service technician and open the service menu 1 2 Select the tab Configuration and tap Customisation 3 Check the Service phone number and change if necessary 4 Logout to return to the operator level 3 English 19 Page 19 mrt 03 2014 01 58 Connect the System to Mains Power Supply and Power Up ...

Page 23: ...anguage Go to the operator settings menu 1 2 Tap Localisation and select the desired language from the pull down menu 20 Page 20 mrt 03 2014 01 58 Connect the System to Mains Power Supply and Power Up 3 English ...

Page 24: ...ual Configuration Wireless connection Search for SSID Manually configure SSID In all cases you can use proxy for the connection Log on as Supervisor to complete this procedure Set up a Wired Connection Set up a wired connection as follows Connect the system to a LAN with a network cable The figure shows the LAN connector on the display module A 1 21 Page 21 mrt 03 2014 01 58 Connect the System to ...

Page 25: ...from the Connection pulldown menu 6 Set Automatically obtain IP address DHCP to Yes or No If Yes the system connects automatically to the LAN If No set up a connection manually Enter the necessary details to setup a manual connection 22 Page 22 mrt 03 2014 01 58 Connect the System to the Internet 4 English ...

Page 26: ...less connection as follows Open the supervisor settings menu 1 2 Tap the Settings tab Connectivity 3 Tap LAN settings 4 Select Wireless from the Connection pulldown menu 4 English 23 Page 23 mrt 03 2014 01 58 Connect the System to the Internet ...

Page 27: ...search for a network tap Choose network 6 When you have entered the network details or selected a network from the search tap Connect to connect to the network When the system connected succesfully to the network the screen shows Connected 24 Page 24 mrt 03 2014 01 58 Connect the System to the Internet 4 English ...

Page 28: ...tings menu 1 2 Tap the Settings tab Connectivity 3 Tap Test connections 4 Tap the Test button The system tests the IP addresses that are defined at the LAN settings If the result is Not OK make sure that the settings are correctly defined 4 English 25 Page 25 mrt 03 2014 01 58 Connect the System to the Internet ...

Page 29: ...our documents and tap 1x to create an example mail set 4 Make sure that the address position and the envelope stop position is correct If not adjust the address position and envelope stop position 5 Tap Start to start the job 6 Tap Stop to finish the job Tap Save if you want to save the settings of the Automatic job to a new job 26 Page 26 mrt 03 2014 01 58 Test the System 5 English ...

Page 30: ...tem Press the On Off button next to display B to shut down the system 1 When the system is busy it completes and inserts the current set stops and will be shut down 5 English 27 Page 27 mrt 03 2014 01 58 Test the System ...

Page 31: ... Index Page 29 mrt 03 2014 01 58 ...

Reviews: