background image

MTX-StarEnergy-E

Hardware User Guide

www.webdyn.com

Summary of Contents for webdyn MTX-StarEnergy-E

Page 1: ...MTX StarEnergy E Hardware User Guide www webdyn com ...

Page 2: ...ncy RF Exposure and SAR 9 6 Personal Medical Devices 10 Regulatory and Type Approval Information 11 1 Directives and Standards 11 2 SAR Requirements Specific to Portable Mobiles 13 3 RoHS Statement 13 4 Disposal of Old Electrical and Electronic Equipment 14 5 General Information 15 5 1 Package Contents 15 5 2 Features 16 5 3 Specification Ratings 16 5 4 Product Label Marking 17 6 Functional Descri...

Page 3: ...0 6 11 Cable Adapter to DB9 Male 32 7 Installation 33 7 1 Installation Location 33 7 2 Modem Wall Mounting 34 7 3 SIM Card Installation 37 7 4 Antenna Installation 37 7 5 RS232 RS485 Cable Installation 38 7 6 AC Mains and DC Power Input Cable Installation 38 7 7 Cover Cabling Space and Seal 39 7 8 Power on LTE Modem and Check Operation 40 Offices Support Contact 42 ...

Page 4: ...rix Electronica S L U or its suppliers shall regardless of any legal theory upon which the claim is based not be liable for any consequential incidental direct indirect punitive or other damages whatever including without limitation damages for loss of business profits business interruption loss of business information or data or other pecuniary loss arising out the use of or inability to use the ...

Page 5: ...ica assumes no liability for any damages incurred directly or indirectly from any technical or typographical errors or omissions contained herein or for discrepancies between the product and the uses guide In no event shall Matrix Electrónica be liable for any incidental consequential special or exemplary damages whether based on tort contract or otherwise arising out of or in connection with this...

Page 6: ...yn by Flexitron Group 6 Installation guide 1 About this Guide This guide is intended to be used by qualified installers testers and technical engineers in order to Install the modem properly and safely Understand the equipment operation Verify proper operation ...

Page 7: ...tted The modem may present a hazard if used in proximity to personal electronic medical devices As a rule the modem must not be used in hospitals airports or planes This equipment is not suitable for use in locations where children are likely to be present Never use the device at a gas station refuelling point blasting area or in any other environment where explosives may be present Operating the ...

Page 8: ... any modem that is obviously damaged or suspected of having been damaged Inordertoprovidestrainreliefandtoavoidtransmittingexcessivevibrationtothedeviceduringinstallation all cables connected to the MTX StarEnergy E modem must be secured or clamped immediately adjacent to the device s connectors To protect the power supply cables and in order to comply with the fire safety requirements when the un...

Page 9: ...levels of radio frequency energy also known as radio waves or radio frequency fields Governmentsaroundtheworldhaveadoptedcomprehensiveinternationalsafetyguidelines developedby scientific organizations such as ICNIRP International Commission on Non Ionizing Radiation Protection and IEEE The Institute of Electrical and Electronics Engineers Inc through periodic and thorough evaluation of scientific ...

Page 10: ...acemakers hearing aids and certain other implanted equipment If a minimum distance of 15 cm 6 inches is maintained between the MTXGTW II S modem radiating antenna and a pacemaker the risk of interference is limited If the user s application is likely to be situated in the vicinity of personnel a suitable warning should be contained in the equipment manual to this effect ...

Page 11: ...of the European Parliament and of the Council of 8 June 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment Text with EEA relevance 2012 19 EU Directive of the European Parliament and of the Council of 4 July 2012 on waste electrical and electronic equipment WEEE Text with EEA relevance RD 110 2015 Real Decreto de 20 de febrero sobre residuos d...

Page 12: ...C Dielectric voltage test 2kV and 10kV Clause 10 6 4 4 Insulation resistance over 100M Ω UNE EN 60529 2018 A1 2018 A2 2018 Degrees of protection provided by enclosures IP Code UNE EN 60695 2 11 2015 Fire hazard testing Part 2 11 Glowing hot wire based test methods Glow wire flammability test method for end products Test limits 650 ºC 10 ºC 30 s 1 s IEC 60068 2 1 2007 Test Ad Cold Test 24h 24h 24h ...

Page 13: ...ency range 30MHz 6GHz Products intended for sale in European markets EN 50360 Product standard to demonstrate the compliance of mobile phones with the basic restrictions related to human exposure to electromagnetic fields 300MHz 3GHz Please note that SAR requirements are specific only for portable devices and not for mobile devices as defined below Portable device A portable device is defined as a...

Page 14: ...le collection point for the recycling of electrical and electronic equipment By ensuring this product is disposed of correctly you will help prevent potential negative consequences to the environment and human health which could otherwise be caused by inappropriate disposal of this product The recycling of materials will help to conserve natural resources For more detailed information about the re...

Page 15: ...ge as appear in the following picture with product label externally readable ITEM REFERENCE DESCRIPTION 1 199810130 MTX StarEnergy E Modem 2 230001103 RS232 RS485 Cable 3 118009286 MTX Antenna STUBBY GSM5 LTE700 2700 SMA M R A 4 000427082 Cable Cover Sealed Screw DIN404 into plastic bag 5 199801110 Cable Cover DIN7981 Plastic Thread into plastic bag 6 140001710 Hole Plugs for void cable entries in...

Page 16: ...th Super Capacitor based backup energy Reset button USB interface only for factory configuration and testing purposes 5mm pitch screwed terminal blocks for power supply input connection Status Leds to show power coverage WAN connection and data transference status Super Capacitor for power supply backup provides enough energy to send warning trap remotely when external power supply is lost 5 3 Spe...

Page 17: ...5ºC Relative humidity Maximum 98 RH at 50ºC non condensing Dimensions without plate 160mm x 100mm x 45mm Dimensions with mounting plate 175mm x 100mm x 45mm Weight 400g 5 4 Product Label Marking Label fixed on front side of LTE Modem comprises the following information 1 MTX logo 2 Product name 3 Part number 4 Power supply operating specifications ...

Page 18: ...a transference status Led Indicator 12 WAN connection status Led Indicator 13 Coverage status Led Indicator 14 Power Supply status Led Indicator 6 Functional Description LTE Modem MTX StarEnergy E is based on a commercial LTE module with a rich set of interfaces and a companion power management controller all of them assembled on a main board as appear on following diagram Connectors for external ...

Page 19: ...and is CE certified with following frequency bands and data rates NETWORK BANDS TECHNOLOGY MAX DATA RATE DL UL 4G B1 B3 B5 B7 B8 B20 LTE FDD 10 Mbps 5 Mbps 3G B1 B5 B8 DC HSPA 42 Mbps 5 76 Mbps WCDMA 384 kbps 384 kbps 2G B3 B8 EDGE 296 kbps 236 8 kbps GPRS 107 kbps 85 6 kbps Following block diagram details internal connection of LTE module ...

Page 20: ...pigtail SMA connector is fixed to connectors panel BOOT jumper Used only for Factory programming purposes TEST jumper Used only for Factory testing purposes LEDs Four Leds are included to inform about system operating status PMC Power Management Controller based on a microcontroller with following tasks Manages power on power off sequence of LTE module as required Act as a hardware watchdog system...

Page 21: ...nges Webdyn by Flexitron Group 21 BACKUP TIME Super Capacitor charging time on normal operation 15sec Super Capacitor charging time 1st time after it has been installed 4min 15sec Backup mode discharging time depending in network connection 20sec 30sec ...

Page 22: ...ble shows relationship between operation status and Led operation Fast refers to fast blinking On Off every 1 second Slow refers to slow blinking On Off every 2 seconds OPERATING STATES POWER COVERAGE WAN DATA Power off OFF Power on ON Boot failure Fast Power failure Operation with backup super capacitor Slow Starting router 3 blinks Sim detected and ready Slow Fast ON ...

Page 23: ...Not enough critical coverage Slow Low coverage Fast Good coverage ON No connection to APN OFF APN connection ON 2G Slow APN connection ON 3G Fast APN connection ON 4G ON TCP port in listening state with TCP encapsulation disabled OFF TCP port in listening state with TCP encapsulation enabled ON Ongoing data transfer Slow ...

Page 24: ...closure with a sealable screw Bellow picture shows available interfaces offered by modem External interfaces available on connectors panel are 1 SMA female connector for LTE Antenna 2 5mm pitch screwed terminal blocks for AC power supply input 3 5mm pitch screwed terminal blocks for DC power supply input 4 SIM card socket 5 RJ45 connector for RS232 RS485 Full Duplex signals 6 USB type A connector ...

Page 25: ...e as damage can be caused to LTE Modem AC powered AC mains power input line and neutral wires have to be connected on terminal block labeled with AC symbols As Modem is a Class II device no earth connection is available Accepted wires section 22 12 AWG 0 5mm2 2 5mm2 If Modem is AC powered it cannot be simultaneously DC powered DC powered DC input power positive and negative wires have to be connec...

Page 26: ... attached directly to SMA connector and protected with low end cover for cable connections SMA INTERFACE SPECIFICATIONS Impedance 50R Type SMA Female ESD Protection 15kV air 8kV contact 6 6 SIM Card Internal main board provides a Push Push type SIM Card socket SIM Card insertion and removal on LTE Modem is done through a card slot at connectors panel To insert SIM card look at bellow picture for p...

Page 27: ...ST label Reset is asserted as long as button is being pushed This reset assertion involves full controlled power off and power on sequence of internal devices 6 8 USB LTE Modem provides USB 2 0 interface on USB A type connector only for factory configuration and test purposes As no use is foreseen for this interface on regular operation at customer facilities it has to be covered with a USB Cap in...

Page 28: ...with no modem hardware flow control signals This communication port is intended to be connected to external meter through an additional cable ended with proper type connector and signal distribution Maximum length for this cable is 1 5m If RS232 cable required length is longer than 3m it is recommended to use a shielded cable No hardware related configuration action is needed to enable RS232 port ...

Page 29: ...m V1 03 subject to changes Webdyn by Flexitron Group 29 7 8 RS232 TX Input Data received on this Input is transmitted to WAN RS232 SPECIFICATIONS Baud Rate Max 115200 bps ESD Protection 15kV air 15kV contact Cable length Max 1 5m ...

Page 30: ...tion Maximum length for this cable is 1 5m If RS485 cable required length is longer than 3m it is recommended to use a shielded cable No hardware related configuration action is needed to enable RS485 port communication TERMINAL RS485 DESCRIPTION 1 2 RS485_TX Output WAN received data is RS485 transmitted on this output signal 3 4 RS485_TX Output WAN received data is RS485 transmitted on this outpu...

Page 31: ...om V1 03 subject to changes Webdyn by Flexitron Group 31 RS485 SPECIFICATIONS Baud Rate Max 115200 bps Termination Internal 120R on RS485_TX pair with True Fail Safe Bias ESD Protection 15kV air 15kV contact Cable length Max 1 5m ...

Page 32: ...om webdyn com V1 03 subject to changes Webdyn by Flexitron Group 32 6 11 Cable Adapter to DB9 Male DB9 male connector ended cable adapter is offered to connect to RJ45 connector on LTE Modem according to bellow diagram ...

Page 33: ...5 Amps for 2 5mm2 connection wires It must be ensured that electrical equipment that has been de energized to allow for electrical work to be carried out cannot be inadvertently re energized A good principle to adopt is that the point of isolation should be under the control of the person who is carrying out the work on the isolated circuit Once LTE Modem is installed before connecting mains energ...

Page 34: ...eferred to floor must guarantee proper visibility of status Led and connection of wires SIM card insertion and Antenna attachment Drill 3 holes on the wall according to mounting hole positions as appear on bellow diagram Recommended hole is 4mm diameter Use required wall plastic plugs for proper fixing Wall mounting screws and wall plastic plugs are not provided with LTE Modem Enclosure fixing Wal...

Page 35: ...contact webdyn com webdyn com V1 03 subject to changes Webdyn by Flexitron Group 35 ...

Page 36: ...36 Remove LTE Modem cabling space plastic cover by removing screws with proper screw driver to get access to low side mounting holes and drill them carefully with a 4mm diameter drill tool as both are blind holes Fix LTE Modem to the wall being aware to follow bellow recommendations ...

Page 37: ...ed to power off the modem insert SIM Card and power on again 7 4 Antenna Installation Refer to Antenna connection chapter for more details Stub antenna can be connected directly to SMA connector on interface panel Maximum dimensions of Stub Antenna to fit within cabling space is indicated bellow External antenna can also be installed Round opening on enclosure is available for cabling installation...

Page 38: ...5 and Cable Adapter chapters for more details Matrix Electronica can provide a 1 5m length RJ45 to DB9 conversion cable with Ref 230001103 Enclosure opening is a 6 5mm diameter hole 7 6 AC Mains and DC Power Input Cable Installation Refer to Mains Power Supply connection chapter for more details Enclosure opening is a 6 5mm diameter hole ...

Page 39: ... next step is to cover the cabling space Fix cover to main enclosure base with supplied screw as detailed in the following picture Install seal label with appropriate maximum 1mm diameter sealing wire joining sealing screw and both cabling cover and main enclosure base Pay attention to the 1mm diameter crossing holes Both holes cross completely both cabling cover and main enclosure base ...

Page 40: ...st trap and go into power down mode OFF System is not properly powered on check mains power supply energy is available and within required specifications check cabling is properly installed COVERAGE STATUS LED 3 blinks Starting router after system reset ON Good coverage Slow Fast ON Sim detected and ready Fast Low coverage verify Antenna is properly installed check LTE Modem location coverage is e...

Page 41: ...on Group 41 Slow 2G Network APN connection ON OFF No connection to APN verify LTE Modem is properly setup DATA STATUS LED ON TCP port in listening state with TCP encapsulation enabled Slow Ongoing data transfer OFF TCP port in listening state with TCP encapsulation disabled ...

Page 42: ...kpurt 110058 Delhi Phone 91 1141519011 Email contact webdyn com PORTUGAL Av Coronel Eduardo Galhardo 7 1ºC 1170 105 Lisbon Phone 351 218162625 Email comercial lusomatrix pt TAIWAN 5F No 4 Sec 3 Yanping N Rd Datong Dist Taipei City 103027 Phone 886 965333367 Email contact webdyn com SUPPORT Madrid Offices Phone 34 915602737 Email iotsupport mtxm2m com Saint Germain en Laye Offices Phone 33 13904294...

Reviews: