background image

Kit Includes:

1 • Sculpted Top Rail (with adjustable stair knuckles and spacers installed).

1 • Bottom Rail (with adjustable stair knuckles installed).

2 • Bottom Rail Brackets (PTP/OTP) Stair with screws.

Balusters

Top rail brackets sold separately.

Before Starting the Installation

Review all local building codes. Wear proper safety equipment.

Step 1

Mount & plumb surface post mount (bolts & shims not included).

Slide sleeve over post mount and check for plumb. 

(See Step 1 illustration) 

Step 2

With post plumb and sleeved, measure distance from post to post (see Step 2 illustration).

For TOP RAIL - deduct 3-1/4" from measurement. 

For BOTTOM RAIL - deduct 2-1/2" from measurement. 

NOTE:

 All measurements apply to stair pitch between 32-38 degrees.

Step 2

2"

2"

TOP

BOTTOM

Top Rail- Deduct 2"
Bottom Rail- Deduct 1 3/4"

Top Rail- Deduct 2"
Bottom Rail- Deduct 1 3/4"

Bottom Stair Run

Top Stair Run

Post Sleeve intersects
Top or Bottom Rails

Mount & Plumb Surface Post Mount
(Mounting Bolts & Shims Not Included)

Step 1

909918

A310 ADJUSTABLE STAIR RAILING

INSTALLATION GUIDE

Review all local building codes before starting the installation.
Wear proper safety equipment.

ALWAYS LAY RAILING ON CLEAN & SOFT SURFACE TO AVOID DAMAGE

Kit Layout

www.FairwayRailing.com

FAIRWAY ARCHITECTURAL  RAILING SOLUTIONS ©2017

Reviews:

Related manuals for A310