background image

× 

60

× 

15

× 

850

× 

110

× 

40

5

×

70

4

×

50

6

×

140

1,4X40

M8

×

70

Ø

3 mm

Ø

4 mm

Ø

5 mm

Ø

8 mm

× 

65

4

×

40

1/24

PREPARE THE 

GROUND

, UNWRAP THE 

PACKAGE, 

LAY OUT THE 

COMPONENTS

, FIND THE 

TOOLS.

VICTORIA C

 40

Summary of Contents for VICTORIA C 40

Page 1: ...60 15 850 110 40 5 70 4 50 6 140 1 4X40 M8 70 3 mm 4 mm 5 mm 8 mm 65 4 40 1 24 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS VICTORIA C 40...

Page 2: ...THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB1 A C D B AB CD 0...

Page 3: ...2 10 5 70 6 140 4 mm 5 mm 3 24 ATTACH FOUNDATION BEAMS WITH SCREWS 4 6 140 5 70...

Page 4: ...4 24 LAY OUT THE BOTTOM LOGS SO THAT DOOR OPENING WILL BE 1441 MM WIDE 5 2 LG 1 1 LG 1 A BL 1 B BL 1 1441 mm...

Page 5: ...6 12 5 70 6 140 4 mm 5 mm 5 24 ATTACH LOGS TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 6 6 140 5 70 5mm...

Page 6: ...3 5 70 4 mm 6 6 140 5 mm 6 24 7 ATTACH THE NEXT ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 6 140 5 70 A LG 1 B LG 2...

Page 7: ...7 24 9 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK 1 LG 6...

Page 8: ...8 24 10 SLIDE THE DOOR IN ATTACH THE HANDLE CDD6R 3 LOGS IN PLACE...

Page 9: ...9 24 22 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS HITBLOCK 1 LG 3 1 LG 2 B LG 4 B LG 1...

Page 10: ...10 24 SLIDE THE WINDOWS IN ATTACH THE HANDLE 23 CDW2L CDW2R...

Page 11: ...11 24 46 2 LG 2 B LG 6 16 LOGS AND 1 HALF LOG IN PLACE B LG 3 1 LG 5 1 LG 7 1 LG 4...

Page 12: ...INSTALL CEILING TRIANGLE AND ATTACH WITH SCREWS INTO THE WALLS LEAVE 4CM CAP BETWEEN DOOR AND CEILING DETAIL ATTACH IT INTO WALLS AND INTO CEILING TRIANGLE USING SCREWS 47 CEILING DETAIL 40 120 CEILIN...

Page 13: ...40 6 140 5 mm 13 24 52 ATTACH TOP LOGS INTO WALL LOGS WITH SCREWS B TL 2 2 TL 3 2 TL 1 2 TL 2 A TL 3 A TL 1 A TL 2 A TL 4 1 TL 3 1 TL 1 1 TL 2 B TL 1 B TL 3 B TL 4...

Page 14: ...14 24 53 CONNECT THE ROOF PURLINS RFR WITH RD BEFORE INSTALLING THEM ON TOP OF THE CORNERS RD RFR...

Page 15: ...4 6 140 5 mm 15 24 55 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS...

Page 16: ...16 5 70 4 mm 16 6 140 5 mm 16 24 58 INSTALL THE ROOF PURLINS RFB AND ATTACH THEM WITH SCREWS RFB2 RFB4 RFB1 RFB3 5 70 6 140...

Page 17: ...408 4 50 17 24 62 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH SCREWS RB21...

Page 18: ...ROOF TOP 40 4 40 18 24 86 INSTALL THE ROOF TOP AND ATTACH IT WITH SCREWS ATTACH FASCIA TRIMS INTO ROOFPURLINS RF...

Page 19: ...288 4 50 19 24 87 SCREW THE FLOORBOARDS INTO FOUNDATION SAW THE LAST BOARD TO MAKE IT FIT FB...

Page 20: ...40 1 4x40 20 24 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Page 21: ...4CM 20CM 15 M8 70 8 mm 21 24 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 97 WINDBOARD...

Page 22: ...90 90 22 24 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90 98...

Page 23: ...23 24 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Page 24: ...24 24 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Reviews: