Installation manual

High Current

Summary of Contents for High Current

Page 1: ...02 2021 V1 0 Installation manual High Current...

Page 2: ...ances of the specifications and can be changed without any prior notice Before placing your order always contact EV Optimizer for the latest information and specifications EV Optimizer explicitly refu...

Page 3: ...manual High Current 1 0 High Current 4 2 0 Installation High Current 4 5 3 0 G4 connection 6 4 0 Main fuse or circuit breaker 7 5 0 Troubleshooting LED indicator 8 6 0 Correct cable specification 8 M...

Page 4: ...rent transformers just before or right after the main fuse and put them on the 1st 2nd and 3rd phase Make sure to install them in the same way It doesn t matter in what order they are placed Step 5 De...

Page 5: ...and plug the connector to the corresponding RS485 port in the High Current See image 1 A on page 4 Make sure that the 2 wires correspond with the connected wires of the modem in the supply station St...

Page 6: ...t operate the tool and SmartGrid module together 6 2 pin green Temperature sensor Connection group Description 1 2 pin red 2 2 pin blue 3 3 pin black External relay kWh meter RS485 hub satellite commu...

Page 7: ...rify if the High Current is placed in the right way If it concerns a fuse there should be 2 lights turned on If it concerns a circuit breaker there should be 1 light turned on If this is not displayed...

Page 8: ...y station The flashing speed is equal to the power consumption If the power usage goes up the LED indicator will flash faster Continuing green The EV Optimizer is still in programming mode Put the rot...