background image

E T C

®

  I n s t a l l a t i o n   G u i d e

Unison Paradigm Touchscreen Rack Panel

.

c

n

,

sl

o

rt

n

o

C

 

e

rt

a

e

h

T

 

ci

n

o

rt

c

el

E

4

 f

o

 

1

 

e

g

a

P

le

n

a

P

 k

c

a

R

 

n

e

e

r

c

s

h

c

u

o

T

 

m

gi

d

a

r

a

P

 

n

o

si

n

U

Corporate Headquarters   3031 Pleasant View Road, P.O. Box 620979, Middleton, Wisconsin 53562-0979 USA   Tel +608 831 4116   Fax +608 836 1736

London, UK   Unit 26-28, Victoria Industrial Estate, Victoria Road, London W3 6UU, UK   Tel +44 (0)20 8896 1000   Fax +44 (0)20 8896 2000

Rome, IT   Via Ennio Quirino Visconti, 11, 00193 Rome, Italy   Tel +39 (06) 32 111 683   Fax +44 (0)20 8896 2000

Holzkirchen, DE   Ohmstrasse 3, 83607 Holzkirchen, Germany   Tel +49 (80 24) 47 00-0   Fax +49 (80 24) 47 00-3 00

Hong Kong   Rm 1801, 18/F, Tower 1 Phase 1, Enterprise Square, 9 Sheung Yuet Road, Kowloon Bay, Kowloon, Hong Kong   Tel +852 2799 1220   Fax +852 2799 9325

Service: (Americas)

 [email protected]

   (UK)

 [email protected]

   (DE)

 [email protected]

   (Asia)

 [email protected]

Web:

 www.etcconnect.com

   Copyright © 2009 ETC. All Rights Reserved.   Product information and specifications subject to change.

7184M2120   Rev B   Released 2009-12

  

ETC intends this document to be provided in its entirety.

Overview

The Unison

®

 Paradigm™ Touchscreen uses a high-resolution, 7”-wide screen, color liquid-crystal 

display (LCD) that is bright and easy to read, with controllable back lights. The Touchscreen is installed 

in a rack panel, which is shipped separately. The Touchscreen is also available in locking cover and wall 

mount configurations. The Touchscreen is powered by either LinkPower and Auxiliary power or PoE 

(Power Over Ethernet 802.3af).

Echelon

®

 LinkPower

®

 (LinkConnect) control network utilizing Belden 8471 (or approved equal) and 24 Vdc 

Auxiliary power (two 16 AWG 1.5mm2) wires.

PoE (Power over Ethernet 802.3af) utilizing Category 5 cable (or approved equal).

All control wiring should be installed and terminated by a qualified installer and should follow standard 

wiring installation practices. Leave approximately 10 inches (254mm) of wiring in the backbox for 

connection and to allow slack for future service needs. For more information about terminating Cat5 

cable, refer to the 

ETC Ethernet Cat5 Termination Kit Setup Guide

Installing the Collar

Installation should follow local codes and standard practices. Ensure that all wiring is installed correctly. 

The touchscreen is supplied with an installation kit which includes the necessary hardware and 

electrical supplies. 

Step 1:

Slide the collar into the rack panel.

Step 2:

Install and tighten four M4 x 20mm collar mount screws through the collar into the rack 

panel.

Paradigm Touchscreen Model

n

o

it

p

ir

c

s

e

D

l

e

d

o

M

P-LCD-RBB

Paradigm Touchscreen rack panel

N o t e :

It is important to orient the rack panel with the cutout on the right side to provide better 

cable access between the Touchscreen and the Termination PCB. As well the collar 

should be installed with the double mounting pin on the top.

Summary of Contents for Paradigm P-LCD Series

Page 1: ... a rack panel which is shipped separately The Touchscreen is also available in locking cover and wall mount configurations The Touchscreen is powered by either LinkPower and Auxiliary power or PoE Power Over Ethernet 802 3af Echelon LinkPower LinkConnect control network utilizing Belden 8471 or approved equal and 24 Vdc Auxiliary power two 16 AWG 1 5mm2 wires PoE Power over Ethernet 802 3af utiliz...

Page 2: ...nd black twisted pair and ground wire pigtails Strip the ends of each wire both installed control wires and pigtail wires approximately 3 8 10mm Step 1 Terminate the installed LinkPower wiring to the white and black LinkPower pigtail Using two Wago connectors connect typically white installed wire s with white pigtail wire and connect the typically black installed wire s with black pigtail wire as...

Page 3: ...ep 1 Position the PCB on the four standoffs on the back of the rack panel and secure with two M3x10mm pan head screws on the RJ11 side of the PCB only Step 2 Place the bracket and RJ45 assembly if used on top of the PCB Secure the PCB to the backbox through the remaining holes in the PCB with two M3x10mm pan head screws Step 3 A ground connection is required for all Touchscreen assemblies Using on...

Page 4: ...e collar Then lift the bottom upward slightly and rotate outward Indicators After the Touchscreen has been powered up the appropriate LEDs on the service panel on the bottom of the Touchscreen illuminate The LCD displays a startup screen a few seconds after booting I O Indicators Reset when pressed resets the Portable LCD software Mode press once for Setup menu Press and hold for 4 seconds to cali...

Reviews: