background image

  Rev E. 03/09  

page 1 of 6 

 

 

   888-01-014-00

Tools required:

De här verktgen behover du:

Diese Werkzeuge benötigen Sie:

Voici les outils dont vous avez besoin:

Dit gereedschap is nodig:

Herramientas necesarias:

Gli attrezzi necessari:

Ergotron

®

 Command Post 

INSTALLATION MANUAL

Read these instructions.

Läs broschyren.

Lesen Sie Die Broshüre.

Lisez le dépliant.

Lees de brochure.

Lee el folleto.

Leggi la brochure.

3/8" (9.5mm)

Carbide drill bit

9/16"

(14.3mm)

9/16"

(14.3mm)

Floor application only - optional 

Ergotron Concrete Anchor Kit

Ceiling  

application 

only - 1/2" 

(12.7mm) 

Anchor Rods

- customer  

supplied

3/8" (9.5mm) 

Flat Washer

3/8" (9.5mm)-16 

Hex Nut 

3/8" (9.5mm) -16 x 1" 

 

(25.4mm) Hex Head Screws

for 2x2 Posts only

1" (25.4mm) Plastic Spacer

for 3x3 and 4x4 Posts only

3/8" (9.5mm) -16 x 2" (50.8mm)

Hex Head Screws 

For 3x3 and 4x4 Posts only

3/8" (9.5mm)

Split Lock Washer

8x

8x

8x

8x

8x

8x

3x3

(76.2 mm)

4x

3x3 Template

2X 7/8 FROM CENTER LINE

2X 7/8 FROM CENTER LINE

6-3/16

6-3/16

45˚

7-1/2

10

12-3/8

12-3/8

4X Ø9/16

CENTER LINE

CENTER LINE

E

2

1

Summary of Contents for Command Post

Page 1: ...8 9 5mm Carbide drill bit 9 16 14 3mm 9 16 14 3mm Floor application only optional Ergotron Concrete Anchor Kit Ceiling application only 1 2 12 7mm Anchor Rods customer supplied 3 8 9 5mm Flat Washer 3 8 9 5mm 16 Hex Nut 3 8 9 5mm 16 x 1 25 4mm Hex Head Screws for 2x2 Posts only 1 25 4mm Plastic Spacer for 3x3 and 4x4 Posts only 3 8 9 5mm 16 x 2 50 8mm Hex Head Screws For 3x3 and 4x4 Posts only 3 8...

Page 2: ...ntrol over the type of floor ceiling wall and or ultimate mounting method the user assumes all responsibility for this aspect of the installation If you have any questions in regard to your mounting system see your building contractor DETERMINE MOUNTING LOCATION 1 Template Mark four mounting holes Floor Below Ceiling Above Ceiling ...

Page 3: ...Rev E 03 09 page 3 of 6 888 01 014 00 ASSEMBLE SUPPORT BASE 2 3 76 2mm 3 8 9 5mm 3a MOUNT BASE Typical Floor Configurations using optional Ergotron Concrete Anchor Kit Floor ...

Page 4: ...888 01 014 00 page 4 of 6 Rev E 03 09 4x Typical Ceiling Configurations using customer supplied 1 2 12 7mm Anchor Rods 3b Below ceiling Above ceiling MOUNT BASE Ceiling Below ceiling Above ceiling ...

Page 5: ... 5 4 6 7 300 lb force inch 25 lb force foot 34 newton meters TIGHTEN BASE AROUND POST PLUMB UP THE POST Floor Ceiling SECURE BASE TO SURFACE 400 lb force inch 33 lb force foot 45 newton meters MOUNT EQUIPMENT AND ROUTE CABLES Floor Ceiling ...

Page 6: ...888 01 014 00 page 6 of 6 Rev E 03 09 ...

Reviews: