background image

  Q U I C K

  I N S T A L L  

G U I D E

 

(Models QD-CONN-10F and QD-CONN-10M)

Install the Enphase Three-Phase  

Field Wireable Connectors

© 2021 Enphase Energy. All rights reserved. Enphase, the Enphase 

logo, Enphase Field Wireable Connector, Enphase IQ 8D microin-

verters, and other trademarks or service names are the trademarks 

of Enphase Energy, Inc. Data subject to change. 09-MAR-2021.

PREPARATION 

For full installation instructions for the Enphase IQ 8D Microinverters, read and follow 

all warnings and instructions in this guide and in the Enphase IQ 8D Microinverter 

Installation and Operation Manual at: 

enphase.com/support

Check that you have Enphase Three-Phase Field Wireable QD Connectors as needed 

for your installation. Both female and male connectors are sold in packs of ten:

•  Three-Phase Field Wireable QD Connector (female): (QD-CONN-10F)

•  Three-Phase Field Wireable QD Connector (male): (QD-CONN-10M) 

Make sure you have the following recommended tools:

•  Screwdriver, blade width 3.5mm (recommended disconnect tool)

•  30mm wrench

Use Enphase Three-Phase Field Wireable QD Connectors with an Enphase QD Cable or a 10AWG or a 12AWG field extension cable to:

•  Easily connect QD Cables on the roof without complex wiring

•  Use a mated pair of connectors to end-feed the branch circuit with an AC connection

•  Use a Male connector along with a QD-LINKFW-300 center tap adapter to center-feed the branch circuit with an AC connection

•  Use mated pairs of connectors to connect with a remote part of the array

FEMALE CONNECTOR PARTS

MALE CONNECTOR PARTS

PARTS

*

 

WARNING

: Risk of equipment failure. Do not mix 

male and female connector parts when assem-

bling connectors.

Enphase Customer Support:

 enphase.com/en-us/support/contact

Revision History

Rev 01

Initial release JAN/21/2021

1. Cable gland

2. Seal

3. Housing

4. Contact carriers

1. Cable gland

2. Seal

3. Housing

4. Contact carriers

1

2

3

4

N

3

4

3

2

1

Reviews: