background image

  

 

 

POWER BANKS STORAGE SYSTEM 

 

User Manual 

Version: 2.0

 

 

PB5000 (51.2V 100AH-5.12Kwh) 

PB7000 (51.2V 150AH-7.68Kwh) 

PB10000  (51.2V 200AH-10.24Kwh) 

 

For On / Off Hybrid Solar Storage System 

 

 

Summary of Contents for PB10000

Page 1: ...POWER BANKS STORAGE SYSTEM User Manual Version 2 0 PB5000 51 2V 100AH 5 12Kwh PB7000 51 2V 150AH 7 68Kwh PB10000 51 2V 200AH 10 24Kwh For On Off Hybrid Solar Storage System ...

Page 2: ...al Specifications 8 4 Safe handling guide 11 4 1 System Diagram 11 4 2 Tools 11 4 3 Safety Gear 11 5 Installation 12 5 1 Inventory of items 12 5 2 Installation Location 13 5 2 1 Minimum clearances 13 5 3 Installing the Battery Pack 14 5 3 1 Mounting to a wall 14 5 4 Parallel use of battery 16 5 4 1 Parallel use of battery All off grid solar inverters 16 5 4 2 Parallel use of Energetec battery on C...

Page 3: ...ing list first if the battery is damaged or spare parts are missing please contact the dealer Before installation be sure to cut off the grid power and make sure the battery is in the turned off mode Wiring must be correct do not mix connect the positive and negative cables and ensure no short circuit with the external device It is prohibited to connect the battery with AC power directly The embed...

Page 4: ...Life cycles 80 DOD 25 C 6000 Cycles Storage time temperature 5 months 25 C 3 months 35 C 1 month 45 C Operation temperature 20 C to 60 C 60 25 Relative Humidity Storage temperature 0 C to 45 C 60 25 Relative Humidity Lithium Battery Standard IEC62133 IEC62619 UN38 3 ROHS CE EMC MSDS Enclosure protection rating IP21 Electrical Parameters Operation voltage 51 2 Vdc 51 2 Vdc 51 2 Vdc Max charging vol...

Page 5: ...istent performance over wide temperature range Wall mounted convenient installation Integrated state of the art BMS to manage and monitor battery information including voltage current and temperature as well as balance cell charging discharging rates 10 years warranty 3 2 Interface Introduction This section details the interface functions of front and back panel Front interface ...

Page 6: ... port RS485 RS485 port 5 Port Reset button RST For reset the batter 6 Bracket 7 Switch OFF ON Normal close 8 Anderson connector Input Output terminal 9 Handle 10 LED ALM Alarm indicator 11 LED RUN Operation indicator 12 LED CAPACITY Capacity indicator 13 LCD 14 LCD KEY 3 3 SOC Indicator Status Indicator Guides Chart 1 Battery Status ...

Page 7: ... 6 Chart 2 Battery Capacity Chart 3 Battery status ...

Page 8: ... computer Address Reserved Address portal for multiple parallel connections 3 5 Wake Up button Battery On When battery is shut down press this RST button for 6 seconds It is activated when the LED lights flicker from RUN light to the lowest capacity indicator Battery off When battery is activated press this button for 6 seconds It will be shut down when the LED lights flicker from lowest capacity ...

Page 9: ...onal Specifications Interface introduction Main menu page Electricity dormancy activated will show the welcome screen press the MENU button to enter the main menu page As shown in the figure below Battery cells state ...

Page 10: ... 9 Battery temperature Battery Warning ...

Page 11: ...oject has not shown press ENTER key can enter the corresponding page 3 Press ESC key can be returned at the next higher level directory In any position press NEMU key can return to the main menu page 4 In a dormant state press any key can activate the screen Dormancy shutdown Under normal operation condition with no keystrokes 1 minutes later system will enter a state of dormancy shutdown Shutdown...

Page 12: ...Use properly insulated tools to prevent accidental electric shock or short circuits If insulated tools are not available cover the entire exposed metal surfaces of the available tools except their tips with electrical tape 4 3 Safety Gear It is recommended to wear the following safety gear when dealing with the battery pack Insulated gloves Safety goggles Safety shoes ...

Page 13: ...act us immediately NO Item Quantity Specification 1 Battery Pack 1 PC 5 12KWH 7 68KWH 10 12KWH 2 Wall mounted Bracket and Screws 1 SET One Bracket and 12pcs screws 3 Power Cable 1 SET 35mm2 4AWG Black Red L 2 0 meter Anderson 350A Standard M8 Termial 4 Canbus Cable 1 PC Battery canbus port to Inverter Canbus port L 1 5 meter 5 Parallel com cable 1 PC Battery com port to Battery com port for parall...

Page 14: ...l dust and dirt in the area Installation must be vertical or tilted backwards by maximum 15 avoid forward or sideway stilt CAUTION If the ambient temperature is outside the operating range the battery pack stops operating to protect itself The optimal temperature range for the battery pack to operate is 0 C to 45 C Frequent exposure to harsh temperatures may deteriorate the performance and life of...

Page 15: ...ble firm wall with thickness greater than 80mm 2 Use the mounting frame as a template mark the hole position 3 Drill 8 holes according to the hole position it is ø10 with depth 60mm 4 Hammer the M8 screws to the above holes and screw the nut Note Do not position screws flush to the wall leave 10 to 20 mm exposed 5 Fix the mounting frame to the 8 screws 6 Raise the battery a little higher than the ...

Page 16: ...5 WARNING Falling equipment can cause serious or even fatal injury never mount the inverter on the bracket unless you are sure that the mounting frame is firmly mounted on the wall after thorough checking ...

Page 17: ...ypes When the battery needs to be used in parallel the maximum connection is 16 units but we recommend 2 4 units according to application When connecting with off grid 48VDC solar inverters it does not need to add Canbus RS485 communication cables with inverters if inverter brand factory does not have Canbus RS485 port just plug and play use One pcs connect diagram Two pcs connect diagram ...

Page 18: ... 17 Three pcs connect diagram Four pcs connect diagram NOTE IF YOU NEED MORE PARALLEL DETAILS PLEASE CONSULT WITH ENERGTECH SOLAR SALES ASAP ...

Page 19: ...4 units according to application The application needs power and communication connections as below choose suitable parallel power cables and related connectors ADS guide Line If you start to connect Energetch hybrid inverter make sure you should consult with Energetech sales manager before connection If the hybrid inverter is not from Energetech factory brand please specify related hybrid on off ...

Page 20: ... 19 One pcs connect diagram Two pcs connect diagram ...

Page 21: ... 20 Three pcs connect diagram Four pcs connect diagram NOTE IF YOU NEED MORE PARALLEL DETAILS PLEASE CONSULT WITH ENERGTECH SOLAR SALES ASAP ...

Page 22: ... or commissioning Failure to observe the user manual quick installation instructions Incorrect usage or inappropriate operation Insufficient ventilation of the device Failure to observe the applicable safety regulations Force majeure Neither does it cover cosmetic defects which do not influence the energy production 6 5 Warranty conditions If the battery becomes defective during the agreed factory...

Page 23: ...ry when you need to apply warranty service support Warranty Card User Information Company User Name Address Telephone Email Project installation location Product Information Battery Model Serial No Invoice Number Purchase Date Dealer Commission date Fault Error Description ...

Reviews: