G2-2 Series ControlNet
Quick Start Manual
Page 1
TDG22CNQS4-0
1/07
Subject to change without notice
www.numatics.com/fieldbus
Getting Started
This is a brief document designed to quickly get you started setting up your valve manifold with an integrated
Numatics’ G2-2 series ControlNet communication node.
1) Initial Unpacking and Inspection
1)
Examine exterior of package for signs of damage. Report any damage to shipping carrier.
2)
Remove wrapped manifold assembly from box.
a)
Remove manifold assembly from anti-static packaging
b)
Retain documentation for installation and configuration
3)
Examine manifold assembly for any shipping damage such as:
a)
Bent pins or connectors
b)
Report any damage to shipping carrier immediately
4)
Examine manifold assembly for proper ordered configuration. (Valves, I/O, Protocol, etc.)
2) G2-2 Introduction
Below is an example of a 2012 series valve manifold. This fieldbus manifold series is capable of addressing a
total of 224 I/O. The manifold can be viewed as having two sections to it, the
Valve Side
and the
Discrete I/O
Side
. The
Valve Side
supports a maximum of 32 solenoid coils and the
Discrete I/O Side
supports a
maximum of 6 modules totaling 192 Outputs, 96 Inputs, or various combinations. The communication
module has two BNC communication connectors. The power module has a 4-pin power connector. Pin-outs
for these, along with I/O connectors, are labeled on the side of the respective modules.
Valve
Valve Side
(Maximum of 32 Solenoids)
Aux. Power
LED's
Chassis Ground
Connection
Valve
End Plates
Manual
Override
Solenoid LED
Status Indicator
Valve Side
Sub-D Output
Module
Power
Module
Communications
Module
Module/
Network
Status LED's