background image

ECP8*1H     ECP8*2H     ECP8*3H

1000003083 (Rev. A - 12/15)

Page 1

BLACK

WHITE

GROUND

COLD CONTROL

(WATER)

FAN

1

2

3

5

6

1

2

3

C

S

M

OVERLOAD

COMPRESSOR

RELAY

TUBE IS SECURED

IN POSITION

SIMPLY PUSH IN

TUBE TO ATTACH

PUSH IN COLLET

TO RELEASE TUBE

PUSHING TUBE IN BEFORE

PULLING IT OUT HELPS TO

RELEASE TUBE

OPERATION OF QUICK CONNECT FITTINGS

1. Insure proper ventilation. 

In fully recessed drinking fountains be sure condenser faces louver panel and is

within 1/2” (13 mm) of louver panel when panel is in place.

2. Water inlet is 3/8” (10 mm) O.D. unplated tube .

  Contractor to supply connections as required.

3. Connecting lines to be made of unplated copper. 

Thoroughly flush all lines to remove all foreign matter

before connecting to cooler.

4. Connect cooler to building supply 

with a shut-off valve and install a 3/8” (10 mm) unplated water line

between the valve and cooler. Remove burrs from outside of water line. Insert water line into bulkhead union

until it reaches a positive stop, approximately 3/4” (19 mm).

NOTE: DO NOT SOLDER TUBES INSERTED INTO THE STRAINER AS DAMAGE TO THE O-RINGS MAY 

RESULT.

5. Electrical:  Make sure power supply is identical

 in voltage, cycle, and phase to that specified on cooler serial

plate. Never wire the compressor directly to the power supply.

The grounding of electrical equipment such as telephone, computers, etc., to water lines is a common procedure. 

This grounding may be in the building, or may occur away from the building.  This grounding can cause electrical 

feedback into a water chiller, creating an electrolysis which causes a metallic taste or an increase in the metal con-

tent of the water. This condition is avoidable by using the proper materials indicated below. Drain fittings which are 

provided by the installer should be plastic to electrically isolate the chiller from the building plumbing system.

INSTALLATION

IMPORTANT!  INSTALLER PLEASE NOTE:

TROUBLE SHOOTING & MAINTENANCE

START-UP

1. Open supply line valve.

2. Purge all air from all water lines

 by operating bubbler valve of fountain to which cooler is connected.

A steady stream flow assures that all air is removed.

3. Rotate fan blade

 to assure proper clearance and free action.

4. Connect to proper electrical power.

WIRING DIAGRAM

INSTALLATION, CARE & USE MANUAL

Refrigeration Package

Temperature Control:

  Factory-set for 50°F water (± 5°) under normal conditions. For colder water, adjust screw

   on item no. 5.

Ventilation:

  Cabinet louvers and condenser fins should be periodically cleaned with a brush, air hose, or vacuum

cleaner. Excess dirt or poor ventilation can cause no cold water and compressor cycling on the overload 

   protector.

Lubrication:

  Motors are lifetime lubricated.

Actuation of Quick Connect Water Fittings: 

 Cooler is provided with lead-free connectors which utilize an o-ring 

seal. To remove tubing from the fittings, relieve water pressure, push in on gray collar while pulling on the

tubing. To insert tubing, push tube straight into fitting until it reaches a positive stop, approximately 3/4”.

Buy at

| 855-558-9600 | BottleFillingStations.com

Reviews: