background image

©06.03.06ELKA-Torantriebe GmbH & Co. Betriebs KG                     Seite 1                                   ED 200, ED 202, ED 350, ED 352 

 

 
 
 
 

Installation and Operating Instructions 

  

 

 

Slide Gate Openers 

 

EST 4004K 

 

 

 

Contents

Page 

1. Usage 

2. Technical 

data 

3. Measurements 

4. Installation 

4.1 Emergency 

release 

5. Electrical 

connections 

6. Connection 

example 

7. 

MO 44-2 Controller 

7.1. Connections 

7.2. Operating 

mode 

7.3. Programming 

11 

8. 

Timer module (optional) 

12 

9. Fault 

codes 

13 

10. 

Setting personal code 

13 

11. 

General notes to safety 

14 

 

Summary of Contents for EST 4004K

Page 1: ...ST 4004K Contents Page 1 Usage 2 2 Technical data 2 3 Measurements 2 4 Installation 3 4 1 Emergency release 4 5 Electrical connections 4 6 Connection example 5 7 MO 44 2 Controller 6 7 1 Connections 7...

Page 2: ...ply 400 Vac 50 Hz Power consumption 2 2 kW Control box MO44 2 Electronic brake no The MO 44 2 control box has among others the following characteristics Safety Four separate reactions to the photo cel...

Page 3: ...on parallel to the gate at a distance of 60 mm Mark the middle of each hole on the foundation e Fix the opener either with plugs and screws M20 or with heavy duty tie bolts e Decide at what height the...

Page 4: ...ose the gate and push the holding plate with magnet along the rack until the LED SEZ turns off Fix the holder at this point on the rack so that the magnet passes the housing at a distance of about 10...

Page 5: ...27 04 2005 ELKA Torantriebe GmbH u Co Betriebs KG Page 5 EST 4004K 6 Connection example...

Page 6: ...27 04 2005 ELKA Torantriebe GmbH u Co Betriebs KG Page 6 EST 4004K 2T1 1L1 1L1 2T1 14NO 6T3 4T2 A2 13NO 5L3 3L2 K2 A1 6T3 4T2 14NO A2 5L3 3L2 K1 13NO A1 loop BA1 STOP START 7 MO 44 2 Controller...

Page 7: ...itted to terminal EXT AUF The LED BA lights if BA1 or the corresponding remote button is pressed A permanent open signal is possible BA2 Button to open the gate n o the signal is valid only for this c...

Page 8: ...tputs 300 mA LS TST Power supply for transmitter The controller switches the 24 Vdc on terminal LS TST off 7 2 Operating mode Motor power Changes only take effect if the running time is then learned a...

Page 9: ...when the gate is open The gate reopens if BT is pressed during closing Warning prior to opening DIP B1 OFF No warning DIP B1 ON The warning light is switched on 4 seconds before the gate opens Warnin...

Page 10: ...e relay connections of the receivers have to be connected in series Parallel to the relay connections a resistor of 1kOhm 5 each has to be connected The photo cell test consists of two parts The trans...

Page 11: ...N until the LED DIAG lights approx 3 seconds Press LERN twice The gate closes from any position opens completely and closes again The time required and the power selected DIP A1 and DIP A2 are then sa...

Page 12: ...The LED DIAG stays on as long as a signal is received Release the button The code is stored and the controller is ready for use 8 Timer card optional The 7 day timer can switch between day and night...

Page 13: ...DIAG 11 flashes The controller has detected a fault in the redundant detection of BS stop contact The controller is faulty DIAG 12 flashes The controller detects that the TRIAC or one of motor relays...

Page 14: ...e GmbH Co Betriebs KG accepts no liability for damage which is caused by using the appliance for purposes other than those for which it is built ELKA Torantriebe GmbH Co Betriebs KG cannot recognise e...