background image

1

Installation Manual

Installation Manual

for the

PowerPod 2

The Smart Home Battery Solution

Summary of Contents for PowerPod 2

Page 1: ...1 Installation Manual Installation Manual for the PowerPod 2 The Smart Home Battery Solution ...

Page 2: ...ilable PowerPod 2 capacity 10 15 20 kWh with continuous power output of 5 6 7 6 8 6 9 6 kW and cell carrier Verizon ATT Rogers No Carrier WiFi Only options PP2 AC BAT Capacity INV Output Power CELL Carrier PP2 DC BAT Capacity INV Output Power CELL Carrier Model Numbers PN INS 0001_Rev_08_EP_PP2_Manual ...

Page 3: ...Battery Installation 38 3 3 4 Auto Transformer Connections 53 3 3 5 Inverter Connections 55 3 3 5 1 Connect Battery to Inverter 56 3 3 5 2 CTs 57 3 3 5 3 Photovoltaic PV DC CoupledOnly 60 3 3 5 4 Grid Connections 63 3 3 5 5 Whole Home 65 3 3 5 5 1 Automatic Transfer Switch 65 3 3 5 6 Partial Home DC Only 67 3 3 5 7 PowerHub 2 Connections 71 3 4 Commissioning 74 3 4 1 Turn On System 75 3 4 2 Attach...

Page 4: ... power generated by the PV panels is not sufficient to support the backup load the inverter takes power from either the batteries or the utility depending on the mode the homeowner has selected For multi day grid outages the system will resupply power to the home by restarting from solar each day and solar charge the batteries even if the batteries were completely drained and system shut down the ...

Page 5: ...aker NTC BMS On grid output breaker Main breaker RESET FAULT Wi Fi COM ENERGY GRID BATTERY BACK UP SYSTEM Solar array Solar array DC Coupled Option or AC Coupled Option DC Coupled Option AC Coupled Option Solar Inverter Automatic transfer switch Auto transformer Intro Whole Home Backup Configuration 1 1 WHOLE HOME BACKUP CONFIGURATION BMS Battery ...

Page 6: ... the GWXXXXA ES inverter and the AC Coupled is the GWXXXXA BP inverter Option only available for DC coupled systems inverter model A ES Back up output breaker Meter CT Communication Grid Power meter Main Panel and Non backed up loads Grid sid e Battery DC Breaker NTC BMS On grid output breaker Main breaker RESET FAULT Wi Fi COM ENERGY GRID BATTERY BACK UP SYSTEM Solar array DC Coupled Only Auto tr...

Page 7: ...y policy Back up Back up Load On grid Battery Back up Generator Back up On Grid Single battery bank cannot be connected to multiple inverters On Grid or backup side cannot be connected to any AC generator Backup side cannot be connected to grid No parallel connection of the backup is allowed in general application Contact Electriq Power first for advanced application Battery without official compa...

Page 8: ... or cause damage to this product CAUTION This indicates the risk of a hot surface The surface may reach a temperature high enough to cause serious burn injuries General Precautions CAUTION Before installing and using this inverter read all instructions and cautionary markings on the inverter and all appropriate sections of this guide This inverter must be installed by licensed electricians only CA...

Page 9: ...Check that AC and DC voltages are at a safe level 9 Access to the inverter wiring requires opening the access panel 3 mm allen wrench required 10 Access to the Auto Transformer requires opening the access panel 2 5 mm allen wrench required To isolate equipment do the following 1 Turn OFF the Main circuit breakers supplying Grid connection 2 Turn OFF the AC Main Backup breakers supplying Load conne...

Page 10: ...an CAUTION Do not operate the Inverter if it has received a sharp blow been dropped or otherwise damaged in any way If the Inverter is damaged call for an RMA Return Material Authorization WARNING Exposed hazardous voltage during servicing or for emergency procedures use labeled lockout hasps with durable steel lockout hasps on a lockable manual breaker or disconnect rated for 240 VAC 50 AAC on th...

Page 11: ...not expose to corrosive substances such as sea breeze steam or chemicals Do not install in humid places or places with condensation Do not install outdoors in climates where the temperature drops below 0 C 32 F for extended periods Do not install in direct sunlight Do not install or use the PowerPod 2 if it has been damaged in any way The ambient temperature charging must be between 0 C and 55 C d...

Page 12: ... or life aging CAUTION Do not expose the PowerPod 2 to liquids or flooding Do not dispose of equipment or batteries with household waste Do not dispose of batteries in a fire or by burning The batteries can explode WARNING Risk of electric shock Risk of fire Do not attempt to repair the battery ies it contains no user serviceable parts Tampering with or opening the battery ies will void the warran...

Page 13: ... To ensure optimal reliability and to meet warranty requirements the Inverter must be installed and or stored according to the instructions in this guide In the event that Inverter one or more batteries or PowerPod 2 is defective and needs to be removed replaced temporarily uninstalled disposed of decommissioned or if Electriq Power Customer Support authorizes a replacement RMA perform the followi...

Page 14: ... of damage due to surge Electriq Power recommends surge protection between the modules and the inverter Note on DC Wiring and NEC Some electricians or installers may be unfamiliar with DC wiring in a residential setting Make note of all relevant codes which may include 1 NEC 690 31 G for DC PV circuits in buildings 2 NEC 215 12 C 2 for correct DC wiring coloring 3 NEC TABLE 310 15 B 16 for Allowab...

Page 15: ... damage to the inverter WARNING Make sure the circuit breaker is off before making or modifying any connections WARNING Do not connect backup loads output in parallel with the grid CAUTION Before making the final connection or closing the breaker make sure the connections have the correct polarity Check polarity labels CAUTION Do NOT apply anti oxidant substance on the terminals before terminals a...

Page 16: ... Inverter During use storage and transport keep the Inverter Properly ventilated Away from water other liquids heat sparks and direct sunlight Away from excessive dust corrosive and explosive gases and oil smoke Away from direct exposure to gas exhaust such as from motor vehicles Free of vibrations Away from falling or moving objects including motor vehicles At an elevation of less than 3 000 m 9 ...

Page 17: ...m In cases of fire or smoke Fire involving Lithium ion battery can be extremely dangerous Lithium ion batteries can flash fire or explode Close doors as you leave to confine fire as much as possible If the alarm is not already sounding pull the fire alarm on your way out of the building If there is no alarm to activate yell fire as you leave Move quickly to an open area away from buildings trees p...

Page 18: ...entioned in this user manual The inverter is installed or operated against the requirements or warnings that are mentioned in this user manual Inverter is broken or damaged by any force majeure like lightening earthquake fire hazard storm and volcanic eruption etc Inverter is disassembled changed or updated on software or hardware without authority from manufacturer Inverter is installed used or op...

Page 19: ...nting bracket and enclosure Auto transformer mounting bracket and enclosure For whole home configuration only Automatic transfer switch mounting bracket and enclosure Take a picture within the PowerTools app to proceed to the next step 10 Connect the batteries BMS and take a picture within the PowerTools app to proceed to the next step 11 Connect the inverter and auto transformer and take a pictur...

Page 20: ...closure the first battery is always installed on the bottom and the BMS is always in the top spot above the fourth battery The inverter and add on 5kWh enclosure must be on opposite sides of the main 10kWh enclosure If there are two add on 5kWh enclosures the second one is placed on top of the first add on 5kWh enclosure The battery DC power connections in the main 10kWh enclosure face away from t...

Page 21: ...oo small to pull through the inverter s four pin green CT connector If the wires must be removed mark with tape electrical or otherwise the L1 left side and L2 ride side pair before removing the connectors See diagram below Hints Other conditions that hinder the Meter System Verification check L1 and L2 power imbalance If L1 and L2 current is different by more than 8 AAC the system may not commiss...

Page 22: ...isit https electriqpower com installer training certification and fill out the form 1 If the PowerTools Commissioning App is not already installed this can be downloaded via Google s Play Store or Apple s App Store If the app is already installed log in to your account using your certified installer credentials 2 Once logged in click Add New System and Scan the PowerPod 2 s enclosure s barcode loc...

Page 23: ... Wrench 17 mm Battery Enclosure Feet Allen Wrench 4mm Inverter Cover bat tery cover Allen Wrench 3mm Auto transformer cover Socket Nut Drive 1 2 Lag Bolt Mounting Bracket Socket Nut Drive 10mm Nuts for BMS Batter ies PE Wire EQUIPMENT FEATURES FUNCTIONS AC DC True RMS Voltmeter DC millivolts DC volts AC millivolts True RMS AC volts True RMS Lo Z Auto volts Example Fluke 117 AC DC Current Clamp Met...

Page 24: ...lity when placing the hardware NOTE The installation space is greater than 83 3 cubic meters 1124 mm 44 25 minimum from top of mounting bracket to ground 464 mm 18 25 minimum from top of mounting bracket to ground 35 mm 1 4 adjustable footpegs Between 152 mm 6 and 610 mm 24 76 mm 3 minimum clearance between Between 152 mm 6 and 610 mm 24 152 mm 6 minimum between 381 mm 15 minimum away from ceiling...

Page 25: ...Knockout Punch to create a punch that will work for your installation Please note that all measurements below are for conduit fittings Ensure no conduit 50mm 2 between inverter and auto transformer top and bottom and 50mm 2 from wall service Observe clearances in section CLEARANCES KNOCKOUT LOCATIONS for adequate cooling and maintenance No conduit must be placed within 2 of the wall s surface of t...

Page 26: ...ons section when mounting and installing the inverter The following considerations must be taken into account before selecting where to install Inverter should be installed vertically or lie on a slope by a max of 15 Any part of this system shouldn t block the switch and breaker from disconnecting the inverter from DC and AC power Inverter should be installed on a solid surface where it is suitabl...

Page 27: ...her non combustible surface only L onduleur doit être installé loin des matériaux électro magnats combustibles explosifs et forts L onduleur est adapté au montage sur le béton ou toute autre surface non combustible seulement CAUTION Bearing capacity of the wall must be higher than 220lbs 100kg to safely support the inverter La capacité de roulement du mur doit être supérieure à 100 kg pour souteni...

Page 28: ...bolts 10 Hang the enclosure on the bracket and ensure that the slots line up correctly To assure that the weight of the battery rests firmly on the floor leave a 6 mm 1 4 gap between the enclosure and the wall mounting bracket 11 Once the system has been mounted take a photo within the PowerTools app 5 Remove the 2 screws from the side portions of the enclosure with an allen wrench 6 Remove the fr...

Page 29: ...ing holes in walls where existing cables may exist inside or on the opposite side of the wall that may be damaged Make sure the hole positions are aligned and level Évitez de percer des trous dans les murs où des câbles existants peuvent exister à l intérieur ou sur le côté opposé du mur qui pourrait être endommagé Assurez vous que les positions de trou sont horizontales et verticales 2 Use expans...

Page 30: ...quilibre et le levage doivent être effectués sur l onduleur 4 Fasten the inverter using the provided screws in the three positions circled in red See Appendix 5 1 What s in the Box to identify the provided screws 5mm x 12mm screw torque min 2 1 max 2 5 Nm min 1 5 max 1 8 ft lb 6 Take a picture within the PowerTools app Security Feature Inverter can be locked for prevention of theft Lock will not b...

Page 31: ...osive or strong electro magnetic equipment L auto transformateur ne peut pas être installé près de l équipement électromagnétique inflammable explosif ou solide Un autotransformateur est nécessaire pour le fonctionnement hors réseau sinon il n y a pas de neutre Mounting System Auto Transformer Leave enough space around the auto transformer according to the below figure for natural heat dissipation...

Page 32: ...lace the equipment on the mounting bracket 3 Secure auto transformer to wall bracket 5mm x 12mm torque min 2 1 max 2 5 Nm 1 5 min 1 8 max ft lb 4 Take a picture within the PowerTools app CAUTION The auto transformer is small in size but very heavy It is recommended that two people carry it during installation L auto transformateur est de petite taille mais très lourd Il est recommandé que deux per...

Page 33: ...stem ATS 3 2 5 AUTOMATIC TRANSFER SWITCH ATS An ATS is required for whole home configurations Follow product specific instructions when mounting the ATS Take a picture within the PowerTools app and press Next to proceed to the next step ...

Page 34: ...ectrical problems Avant de commencer l installation ou la mise en service de PowerPod 2 veuillez lire attentivement les déclarations ci dessous Pendant la connexion au câblage l opérateur doit toujours porter un EPI approprié L installation et la mise en service doivent être effectuées par un électricien agréé conformément aux exigences locales étatiques et nationales du Code électrique ANSI NFPA ...

Page 35: ...es of battery should be connected correspondingly Veuillez suivre les exigences et les étapes ci dessous strictement ou des dommages onduleur ou même un incendie peuvent se produire si elle n est pas satisfaite des conditions suivantes Avant de connecter le câble de la batterie assurez vous que tous les interrupteurs connectés à l onduleur sont fermés et qu il n y a plus de puissance dans l ondule...

Page 36: ...ut causer un mauvais contact et un obstacle élevé ce qui est dangereux pour le système Assurez vous que les câbles de batterie sont connectés correctement Les polarités de la batterie doivent être connectées en conséquence Installing System General Requirements ...

Page 37: ...s of a diameter of 1 The main 10kWh enclosure to add on 5kWh enclosures are for conduit fittings of 2 0 An appropriate conduit adapter should be applied when conduit fittings with different dimensions are used 1 Remove the 4 screws by Allen Wrench to remove the cover of the connection box 2 Remove the waterproof cover provided in the hardware accessories box 5mm torque min 2 1 max 2 5 Nm min 1 5 m...

Page 38: ...ons below specific to that battery type Do NOT mix battery manufactures or communication cable revisions Below are the only three valid battery configurations See Appendix 5 1 WHAT S IN THE BOX for item identification details 1 1 Configuration 1 ZN with Orig Rev 1 ZN Communication Cables 1 2 Configuration 2 ZN with Univ Rev 2 ZN Communication Cables 1 3 Configuration 3 Topband with Orig Rev 1 Topb...

Page 39: ... Nm min 2 4 max 3 0 ft lb Note Accessory bags inside the enclosure will have all the required cables and screws Installing System Battery Installation 2 Before installing the batteries ensure the enclosure is securely fastened and that all clearances have been adhered to as stated in Section 3 2 Knockouts and Clearances 3 There will be four cables coming from the left and right of the PowerHub 2 w...

Page 40: ...4 Place the batteries in the enclosure ensuring that the orientation of the batteries are correct depending on which side the inverter will be installed on Use the stickers in the back of the enclosure as a guide when installing the batteries and BMS ...

Page 41: ...e correct position see next page Also use the sticker on the back of the enclosure as a guide NOTE USE INCLUDED TOOTH LOCK WASHERS 10mm WHEN SECURING THE BATTERIES AND BMS Torque Note 6 mm PE and battery mounting PEMs torque min 3 3 max 4 0 Nm min 2 4 max 3 0 ft lb CAUTION Do not remove the battery terminal safety caps until the cables are ready to be installed ...

Page 42: ... enclosure and wired when the inverter is in the left position 7 Ensure the BMS top box is also orientated in the correct position Use the sticker on the back of the enclosure as a guide Battery Module Battery Module Battery Module Battery Module Communication Switch Communication Switch Communication Switch Communication Switch BMS COMM IN IN IN ...

Page 43: ...43 Installation Manual Installing System Battery 8 Repeat for the amount of batteries needed for the installation BMS INVERTER ...

Page 44: ...5 0151 Right D7 D8 PA5 ID 001 005 0149 Installing System Battery Locate your wiring harness kit and begin wiring your batteries Above PowerPod 2 Battery Communications Cables to interconnect the 1 10 kWh batteries and BMS 2 15kWh add on and 3 20 kWh add on Note make sure PA1 connects to SA1 and PA2 connects to SA2 etc All the cables shown on this page are required for a 20 kWh system The 10 and 15...

Page 45: ... 005 1062 2 Harness Batteries 5 kWh add on for 15 kWh and 20 kWh Batt Left SA1 SA2 PA4 PA5 ID UNIV CABLE 001 005 1088 Right D5 D7 D6 D8 SA4 SA5 ID UNIV CABLE 001 005 1087 Above PowerPod 2 Battery Communications Cables to interconnect the 1 10 kWh batteries and BMS 2 15kWh add on and 2 20 kWh add on Note make sure PA1 connects to SA1 SA2 and PA2 connects to SA1 SA2 etc ...

Page 46: ...IN COM_OUT ID Extention Module_COM Cable Above PowerPod 2 Battery Communications Cables to interconnect the 1 10 kWh batteries and BMS Note 1 make sure P1 connects to BMS and P2 to P5 connects to Batteries 2 15kWh add on and 2 20 kWh add on Note 2 for 15kWh make sure P6 P8 connects to P6 on 10kWh cable To expansion module and P9 P11 and P10 P12 connects to Batteries Note 3 for 20kWh make sure P6 P...

Page 47: ...cond from top position 3 Continue to connect the same communications cable until all of the batteries have been connected Note that the order in which these are connected is important Use the diagram below to wire the system properly 10 kWh BMS 4 3 2 1 15 kWh BMS 6 5 4 3 2 1 and 20 kWh BMS 8 7 6 5 4 3 2 1 1 BMS 2 3 4 5 6 7 8 CAUTION Do not remove the battery terminal safety caps until the cables a...

Page 48: ...munication Switch Communication Switch Communication Switch Communication Switch BMS COMM IN IN IN When the inverter is on the RIGHT side the batteries and BMS are flipped The COMM IN is on the bottom and the positive connection is on the top Note the connector colors must always match when wiring the cables The batteries connect in series to each other ...

Page 49: ...er take the final positive connection on last battery and connect that back to the positive red BMS terminal 6 Ensure all breakers are in the OFF position Due to the differences Orientation When Inverter is on the Left Battery Module Battery Module Battery Module Battery Module Communication Switch Communication Switch Communication Switch Communication Switch BMS COMM IN IN IN ...

Page 50: ...eaker indicator RED is ON and GREEN is OFF 7 Route the final negative wire from the last battery position 4 to the negative of the BMS NOTE THE COLOR CODING IN THE DIAGRAM BELOW Orientation When Inverter is on the Left Battery Module Battery Module Battery Module Battery Module Communication Switch Communication Switch Communication Switch Communication Switch BMS COMM IN IN IN Installing System B...

Page 51: ...stallation Manual 8 The finished wiring installation should resemble the following diagrams Below page 47 10 kWh Top page 48 15 kWh Bottom page 48 20 kWh Installing System Battery PowerPod 10 kWh BMS 1 2 3 4 ...

Page 52: ...5 5 7 ZN with Univ Rev 2 15 kWh Communication cable plugs labeled SA1 SA2 to PA1 SA4 SA5 to PA4 PA5 and D5 DA7 D6 DA8 into batteries 5 and 6 Topband with Orig Rev 1 15 kWh Communication cable plugs labeled To expansion module to COM_IN and P9 P11 P10 P12 into batteries 5 and 6 ZN with Orig Rev 1 20 kWh Communication cable plugs labeled SA2 to PA2 SA5 to PA5 and D7 D8 into batteries 5 and 6 Topband...

Page 53: ... 90 C wire rated and gauge size per code for 40 A copper Installing System Auto Transformer 3 For the NTC auto transformer connection to the inverter use the pre made cable shipped with the inverter If a longer NTC connection is needed use 22 AWG or 24 AWG 600 V insulated wire One end of the NTC cable is connected to the inverter with the 2 pin terminal and the other end is connected to the auto t...

Page 54: ...g System Auto Transformer 4 Once the Auto Transformer has been wired take a photo within the PowerTools app and press Next to move on to the next Route all the auto transformer cables L1 L2 N PE and TX NTC cables between inverter and auto transformer Connect as shown by the two diagrams below 5 After auto transformer to inverter wiring is completed fasten the auto transformer front cover 2 1 ...

Page 55: ...x 5 4 Inverter Overload Installing System Inverter 3 3 5 INVERTER CONNECTIONS Back up terminal Ground bar Meter CT terminal EMS BMS On Grid terminal Battery terminal Auto transformer terminal DC switch Ground bar AC bypass switch LED Indicators Wi Fi Reset Reload not used ...

Page 56: ...t Connect battery cables to battery terminals If the battery is required to connect with PE cable connect PE cable to ground bar GND Torque 0 25 in set screw torque min 3 3 max 4 0 Nm min 2 4 max 3 0 ft lb 3 3 5 1 CONNECT BATTERY TO INVERTER 2 Plug in the long positive red and negative black cables into the same color BMS connectors as shown below CAUTION Do not turn on the switches at this time I...

Page 57: ...rly configure the two CTs 1 Locate the two CTs in the accessory box 2 The two grid CTs must be installed on L1 and L2 on the home s main utility entry point cables L1 and L2 are determined by the grid connection marking on the inverter CT Connection CAUTION Make sure AC cable is totally isolated from AC power before connecting CT Assurez vous que le câble AC est totalement isolé de la puissance AC...

Page 58: ...er com for additional support 3 Route the other end of the CT through the CT port and insert the 4 Pin terminal at the inverter as shown below 4 After all the wiring connected close the wiring distribution box ensure waterproof and moisture proof and sealed well 5 Important Mark CTs wire connections if removing connector to route cable through conduit or remove excess wire length See image below L...

Page 59: ...59 Installation Manual Inverter CTs Note after all the wiring connections have been made observe wiring is depicted as shown in the photo ...

Page 60: ... the PV string refer to the below table Le courant de court circuit total de la chaîne PV ne doit pas dépasser le courant de court circuit DC maximal de l onduleur Les poteaux positifs et négatifs des cordes photovoltaïques ne doivent pas être cloués à la terre Les spécifications des conducteurs ne doivent pas être inférieures à celle d AWG12 en raison de ne pas être reliée au fusible Pour la rési...

Page 61: ... Automatic Transfer Switch and take a photo within the PowerTools app and press Next to move on to the next step For 7 7 6 8 6 9 6kW the installer can connect up to 8 PV cables to PV terminals 4 MPPT trackers For inverter 5kW 6kW the installer can only connect 4 PV cables to PV terminals 2 MPPT trackers Note For inverter 5kW 6kW do not connect PV cables to Port 3 3 4 4 Inverter PV ...

Page 62: ... PV strings or PV module in the PV strings Le terminal de sortie du module PV peut exsister la tension dangereuse Toucher le terminal peut provoquer un choc électrique Avant de connecter le terminal d entrée PV assurez vous que l interrupteur DC est éteint et qu il n y a pas de tension dans les terminaux des produits d entrée DC Lorsque onduleur couplé CC est en cours d exécution ne pas fonctionne...

Page 63: ...pecification A PP2 AC or DC 5000 10 15 20 30A Max PP2 AC or DC 6000 10 15 20 30A Max PP2 AC or DC 7000 10 15 20 35A Max PP2 AC or DC 7600 10 15 20 40A Max PP2 AC or DC 8600 10 15 20 40A Max PP2 AC or DC 9600 10 15 20 50A Max CAUTION Make sure the inverter is totally isolated from any DC or AC power before connecting AC cable An external AC breaker is needed for on grid connection to isolate from g...

Page 64: ...or DC 6000 10 15 20 40A PP2 AC or DC 7000 10 15 20 45A PP2 AC or DC 7600 10 15 20 50A PP2 AC or DC 8600 10 15 20 50A PP2 AC or DC 9600 10 15 20 50A 1 Route the grid cables through the port closest to the grid connectors and connect to the GRID N L1 and L2 connectors CAUTION Make sure that all hardware is de energized before connecting the cables ...

Page 65: ...ng otherwise the inverter will turn off and the loads will not be backed up until load is reduced to max rated output of inverter Refer to the connection instructions and wiring diagrams provided with the automatic transfer switch and see Appendix 5 3 PowerPod 2 Wiring Diagram with ATS Once the Automatic Transfer Switch has been wired take a photo within the PowerTools app and press Next to move o...

Page 66: ...f grid applications consult with your solar system vendor Backup Frequency Shift When the battery SOC is high and the charging power is limited the AC coupled PowerPod s will increase the output frequency causing the PV inverter to reduce the output power until the battery enters a low power discharge state ...

Page 67: ...s to be aware of conditions and follow the instructions as below Do not connect loads if they depend on a stable energy supply for a reliable operation Do not connect the loads which may in total exceed the maximum backup capacity Avoid those loads which may create very high start up current surges such as Air conditioner high power pump etc Avoid high ambient temperatures as they will reduce maxi...

Page 68: ...68 Installation Manual Inverter Partial Home Backup Load Configuration ...

Page 69: ... de branche multi fil connectés Do not use aluminum cables Inverter Partial Home Model Number Load Breaker Specification A PP2 AC or DC 5000 10 15 20 30A PP2 AC or DC 6000 10 15 20 30A PP2 AC or DC 7000 10 15 20 35A PP2 AC or DC 7600 10 15 20 40A PP2 AC or DC 8600 10 15 20 40A PP2 AC or DC 9600 10 15 20 50A Model Number Grid Wire Size Rated for A PP2 AC or DC 5000 10 15 20 35A PP2 AC or DC 6000 10...

Page 70: ...ackup port Connect backup cables to backup terminals Inverter Partial Home 2 Once the system has been wired begin wiring the Automatic Transfer Switch and take a photo within the PowerTools app and press Next to move on to the next step Connector Accepts 6 AWG Max ...

Page 71: ...e instructions for your configuration If unsure of your configuration see Appendix 5 1 WHAT S IN THE BOX 1 Locate the two cables coming from the right of the PowerHub 2 as seen here and connect the larger four pin white connector into the communications cable labeled backup 24v for ZN batteries and 12Vdc for Topband batteries The other small black cable with the four pin white connector will be ev...

Page 72: ...Manual Inverter PowerHub 2 Next plug in the RJ45 connection from the PowerHub 2 into the OUT COMM port for ZN and OUT COM1 port for Topband In both cases the port is located on the opposite side of the BMS image below ...

Page 73: ...nce the system has been wired take a photo within the PowerTools app and press Next to move on to the next step 3 Plug in the green 4 pin communication connector to the inverter as depicted in the diagram below Inverter PowerHub ...

Page 74: ...are REQUIRED to commission the PowerPod 2 Be sure to install the app and add the new system as described in Section 3 1 3 Commissioning Initial Steps Then carefully follow the recommended commissioning sequence on the following page The commissioning outcome will verify system operation by running a series of system checks If the checks are successful the App will continue to guide the user to set...

Page 75: ...system do the following 1 Begin by switching all of the batteries to the On position Note the On position is when the indicators are RED 2 Switch the BMS to the On position 3 The PowerHub and display should be operational at this point 4 If the system is DC coupled switch on the PV 5 Switch on the Grid ...

Page 76: ...white and one black connectors for the Rev 2 cable and connect the other end to the main enclosure front cover display WARNING Ensure 4 pin connector is connected correctly the first time Otherwise it will short the display board and disrupt the entire CANbus communications of the PowerPod 2 If shorted leave the front unit disconnected to allow coms to work properly 3 Place the front cover back on...

Page 77: ...ls App Click Next and wait for the system to connect to the network 2 If the system is been successfully commissioned the PowerTools app will show six green checkmarks alongside the six tests ran on the system See image below The PowerPod 2 display will also show a green circle with an illuminated yellow bolt If there are no lights or any other colors than what is stated above follow the instructi...

Page 78: ...mpt you with the customer s first name last name and email address 5 Reinstall all front covers and ensure the set screws are fastened to keep the integrity of the NEMA 3R rating For additional help contact Electriq Power Support at 1 833 GO BATTERIES 462 2883 or support electriqpower com The system should now resemble the image above If the display shows any other color than green follow the trou...

Page 79: ...cle indicates that the system is ready to be commissioned and that the system is communicating with the PowerHub 2 Normal The state of charge is indicated by the amount of the ring that is filled The ring to the left is indicating that the state of charge is at 75 Issue Detected A full yellow circle indicates that the system has detected an issue Installing System Commissioning PowerPod 2 Display ...

Page 80: ...80 Installation Manual Installing System Commissioning PowerPod 2 Display Indicators Continued Inverter Indicators ...

Page 81: ...es the PowerPod 2 an incredible addition to their property Demonstrate the following items to help the owner understand what puts the power into the PowerPod 2 How to access their personalized homeowner app Discuss the basic functionalities of the app and how to set the different system modes Direct where all safety shutdown switches are and any other important safety precautions that may need to ...

Page 82: ...FePO4 cells With or without solar panels the PowerPod 2 provides backup power and can self consume or export excess power back to the grid 4 2 DASHBOARD The Electriq Power App puts your power in your hands The App is available on both iOS and Android devices as well as on the web As a user you can easily see analytics and insights on your energy production consumption and storage all in one intuit...

Page 83: ...nual User Guide Power Flow 4 2 1 POWER FLOW This view shows live readings from your solar panels PowerPod battery home consumption and the grid so you instantly know where your energy is coming from and where it s going ...

Page 84: ...This view also shows today s energy 4 2 2 TIMELINE The Timeline screen shows a daily graph of your energy generation and consumption to help you better understand your home s electrical activity The calendar widget allows you to view data from a past date ...

Page 85: ...over the timeline s line graphs reveals a tooltip with specific readings for that precise time of day Choosing the Energy tab shows the kilowatts per hour bar chart for a breakdown of the day s energy activity Choosing the Power tab shows the kilowatts line chart for a breakdown of the day s power activity ...

Page 86: ...all the energy activity on one chart Choosing the down arrow exports either 15 minute or one hour the energy data to a csv file Day Week Month and Year give daily weekly monthly and yearly views of your history using PowerPod 2 These views are helpful for understanding your home s general energy behaviors over longer periods of time ...

Page 87: ...orting User Guide Timeline System 4 2 3 SYSTEM Depending on the selected mode of operation the PowerPod 2 will optimize your energy for Backup Self Supply or Time of Use Backup Mode is for resiliency and keeps your battery charged at 100 so you re always prepared should a power outage occur Notice how the battery reserve slider is automatically set to 100 This ensures all of your battery is charge...

Page 88: ... means 80 of your battery will be available for self supply and 20 will always be reserved for backup power TOU Mode optimizes your system for energy affordability by switching to solar or battery power when grid energy costs are highest Note 1 Partial act like Self Supply and Peak discharges the battery to Battery Reserve Note 2 for best results set only one Peak period and if you use Partial it ...

Page 89: ...3 3 AC Energy Storage Systems EP PP GW AC CATL 10kWh White Verizon US 100 1004 EP PP GW AC CATL 15kWh White Verizon US 100 1005 EP PP GW AC CATL 20kWh White Verizon US 100 1006 All Box Descriptions 1 Inverter Box with Accessory Kit 2 Auto Transformer Box with Accessory Kit 3 10 kWh Enclosure Box with 10 20 kWh Accessory Kit 4 5 15 kWh Enclosure Box with 15 kWh Accessory Kit 5 5 20 kWh Enclosure Bo...

Page 90: ...Bracket Lower Wall Mounting Bracket 2 CTs with connecting wire connected to a 4 pin connector Mounting Bracket Template Accessory Kit inverter box 7 Flat Head Screws 2 3 4 10 7 Plastic Anchor Fasten inverter mounting bracket to wall 3 Screws Secure upper and lower wall brackets 5mm x 12mm torque min 2 1 max 2 5 Nm min 1 5 max 1 8 ft lb ...

Page 91: ... min 1 2 max 1 4 ft lb Wall mount Bracket Expansion bolts Wall mounted bracket Self tapping Screws Plastic Anchor Accessory Kit Auto transformer box NTC Cable between auto transformer and inverter 4 Flat Head Screws 2 3 4 10 4 Plastic Anchor 1 Screw Secure Auto Transformer to wall bracket 5mm x 12mm torque min 2 1 max 2 5 Nm min 1 5 max 1 8 ft lb Description PN or Image Tool knockout plug removal ...

Page 92: ...Display Inverter BMS 3 Pieces Note On Rev 01 one PN is for all three pieces For PNs see Rev 01 and 02 items below Rev 01 PN 400 1008 Harness Comms Main Orig Rev 01 PN 400 1008 Harness Power Comms for LED board Orig Rev 01 PN 400 1008 Harness Power for PH Orig Rev 02 PN 400 1071 Harness Comms Main Rev 02 PN 400 1072 Harness Power Comms for LED Board Rev 02 PN 400 1073 Harness Power for PH ...

Page 93: ...ector Ref Des S4 D1 D2 D3 D4 PA1 PA2 and Backup 24V ID Label 001 005 0147 400 1001 Harness BMS 10 kWh for ZN BMS and Batteries Only ZN Orig Rev 2 Connector Ref Des S4 D1 D2 D3 D4 PA1 PA2 and Backup 24V ID UNIV CABLE 001 005 1062 400 1021 Harness COM BMS and Batteries 10kWh for Topband BMS and Batteries Only 12Vdc Connect to BMS module To expansion module ID Master Module_COM Cable 161605508 400 11...

Page 94: ...5 1905mm Cable INV BMS Power black Black to 22 mm Ferrule 72 1829mm Cable INV BMS Power red Orange to 22 mm Ferrule 72 1829mm Installation Manual Cable BATT BMS Power Red Cable Orange to Orange 16 400mm Cable PE Grounding Enclosure to inverter 84 2134mm 10AWG Cable PE Grounding Enclosure to front panel 24 610mm 10AWG ...

Page 95: ...teel 5 16 Size 3 Long 4 98023A030 Zinc Yellow Chromate Plated Grade 8 Steel Washer for 5 16 Screw Size 0 344 ID 0 688 OD 24 Nut Class 8 M6 x 1 00mm Medium Strength Zinc Plated Steel Flange Torque min 3 3 max 4 0 Nm min 2 4 max 3 0 ft lb 28 Tooth Lock Washers 10mm 2 Wing Nut M6 Torque min 3 3 max 4 0 Nm min 2 4 max 3 0 ft lb ...

Page 96: ...OM BMS and Batteries 5 kWh add on for 15 kWh Batt Left SA1 SA4 ID 001 005 0150 Right D5 D6 PA4 ID 001 005 0148 400 1016 ZN Univ Harness COM BMS and Batteries 5 kWh add on for 15 20 kWh Batt Top SA1 SA2 PA4 PA5 ID 001 005 1088 Bottom D5 D7 D6 D8 SA4 SA5 ID 001 005 1087 400 1022 B 400 1022 A Topband Harness COM BMS Batteries 5 kWh add on for 15 kWh and 20 kWh Batt COM_IN COM_OUT ID Extention Module_...

Page 97: ...Steel Washer for 5 16 Screw Size 0 344 ID 0 688 OD 24 Nut Class 8 M6 x 1 00mm Medium Strength Zinc Plated Steel Flange Torque min 3 3 max 4 0 Nm min 2 4 max 3 0 ft lb 28 Tooth Lock Washers 10mm 2 Wing Nut M6 Torque min 3 3 max 4 0 Nm min 2 4 max 3 0 ft lb Description PN or Image Cable PE Grounding Enclosure to inverter 48 1220mm 10AWG Cable PE Grounding Enclosure to front panel 24 610mm 10AWG ...

Page 98: ...e 55 1400mm Orig Harness COM BMS and Batteries 5 kWh add on for 20 kWh Batt Left SA2 SA5 ID 001 005 1051 Right D7 D8 PA5 ID 001 005 1049 400 1019 ZN Univ Harness COM BMS and Batteries 5 kWh add on for 15 20 kWh Batt Top SA1 SA2 PA4 PA5 ID 001 005 1088 Bottom D5 D7 D6 D8 SA4 SA5 ID 001 005 1087 400 1022 B 400 1022 A Topband Harness COM BMS Batteries 5 kWh add on for 15 kWh and 20 kWh Batt COM_IN CO...

Page 99: ...Steel Washer for 5 16 Screw Size 0 344 ID 0 688 OD 24 Nut Class 8 M6 x 1 00mm Medium Strength Zinc Plated Steel Flange Torque min 3 3 max 4 0 Nm min 2 4 max 3 0 ft lb 28 Tooth Lock Washers 10mm 2 Wing Nut M6 Torque min 3 3 max 4 0 Nm min 2 4 max 3 0 ft lb Description PN or Image Cable PE Grounding Enclosure to inverter 48 1220mm 10AWG Cable PE Grounding Enclosure to front panel 24 610mm 10AWG ...

Page 100: ...s in the Box Control Box Model LCB200050A Control Box Rated Voltage 100 153 204 8VDC Rated Current 50A Operating Voltage Range 44 8V 230 4V Working Temperature 20 C 55 C Storage Temperature 20 C 55 C Protection Level IP20 Insulation 100MΩ Withstand Voltage 500V DC Serial Number ZNSBBA0016420010001 ...

Page 101: ...l TB205100F Control Box_UL Control Box Number Rated Voltage 103V 154 205VDC Rated Current 50A Operating Voltage Range 86 4 230 4V Working Temperature 20 C 55 C Storage Temperature 10 C 35 C Protection Level IP20 Insulation 100MΩ Withstand Voltage 500V DC Serial Number Appendix What s in the Box ...

Page 102: ...tage 25 6V Rated Energy 2 56kwh Operating Voltage Range 22 4V 28 8V Available SOC Range 10 100 Charging Temperature 0 C 55 C Discharge Temperature 20 C 55 C Storage Temperature 20 C 55 C Standard Charging Current 0 5C Maximum Charging Continuous Current 0 5C Standard Discharge Current 0 5C Maximum Discharge Continuous Current 0 7C Maximum Discharge Pulse Current 1C 3min SOC 40 Serial Number ZNBBBA...

Page 103: ... 25 6V Rated Energy 2 56kwh Operating Voltage Range 21 6 28 8V Available SOC Range 10 100 Charging Temperature 0 C 50 C Discharge Temperature 20 C 55 C Storage Temperature 10 C 35 C Standard Charging Current 0 5C Maximum Charging Continuous Current 0 5C Standard Discharge Current 0 5C Maximum Discharge Continuous Current 0 5C Maximum Discharge Pulse Current 1C 3s SOC 40 Serial Number Firmware Vers...

Page 104: ... 1007 Transformer NFT EP 1 350 1000 Enclosure Assembly 10kWh WV1 White VZ EP 1 350 0500 Enclosure Sub Assembly 5kWh WV1 White Verizon EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1003 EP PP ZN GW DC 20kWh WV1 White VZ 200 1001 Inverter DC GW EP 1 200 1007 Transformer NFT...

Page 105: ...ransformer NFT 1 350 1000 Enclosure Assembly 10kWh WV1 White VZ EP 1 350 0500 Enclosure Assembly 5kWh for 15 WV1 White Verizon EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1006 EP PP ZN GW AC 20kWh WV1 White VZ 200 1008 Inverter AC GW EP 1 200 1007 Transformer NFT 1 350 ...

Page 106: ...00 1001 Inverter DC GW EP 1 200 1007 Transformer NFT EP 1 350 1003 Enclosure Assembly 10kWh UVC White ATT EP 1 350 0504 Enclosure Assembly 5kWh UVC White EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1015 EP PP ZN GW DC 20kWh White ATT 200 1001 Inverter DC GW EP 1 200 100...

Page 107: ...00 1008 Inverter AC GW EP 1 200 1007 Transformer NFT EP 1 350 1003 Enclosure Assembly 10kWh UVC White ATT EP 1 350 0504 Enclosure Assembly 5kWh UVC White EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1018 EP PP ZN GW AC 20kWh White ATT 200 1008 Inverter AC GW EP 1 200 100...

Page 108: ... 200 1001 Inverter DC GW EP 1 200 1007 Transformer NFT EP 1 350 1004 Enclosure Assembly 10kWh UVC White RGR EP 1 350 0504 Enclosure Assembly 5kWh UVC White EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1027 EP PP ZN GW DC 20kWh White Rogers 200 1001 Inverter DC GW EP 1 20...

Page 109: ... 200 1008 Inverter AC GW EP 1 200 1007 Transformer NFT EP 1 350 1004 Enclosure Assembly 10kWh UVC White RGR EP 1 350 0504 Enclosure Assembly 5kWh UVC White EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1030 EP PP ZN GW AC 20kWh White Rogers 200 1008 Inverter AC GW EP 1 20...

Page 110: ...00 1001 Inverter DC GW EP 1 200 1007 Transformer NFT EP 1 350 1005 Enclosure Assembly 10kWh UVC White WiFi EP 1 350 0504 Enclosure Assembly 5kWh UVC White EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1039 EP PP ZN GW DC 20kWh White WiFi 200 1001 Inverter DC GW EP 1 200 1...

Page 111: ...00 1008 Inverter AC GW EP 1 200 1007 Transformer NFT EP 1 350 1005 Enclosure Assembly 10kWh UVC White WiFi EP 1 350 0504 Enclosure Assembly 5kWh UVC White EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1042 EP PP ZN GW AC 20kWh White WiFi 200 1008 Inverter AC GW EP 1 200 1...

Page 112: ...200 1001 Inverter DC GW EP 1 200 1007 Transformer NFT EP 1 350 1006 Enclosure Assembly 10kWh UVC White LTE EP 1 350 0504 Enclosure Assembly 5kWh UVC White EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1051 EP PP ZN GW DC 20kWh White VZLTE 200 1001 Inverter DC GW EP 1 200 ...

Page 113: ...200 1008 Inverter AC GW EP 1 200 1007 Transformer NFT EP 1 350 1006 Enclosure Assembly 10kWh UVC White LTE EP 1 350 0504 Enclosure Assembly 5kWh UVC White EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1054 EP PP ZN GW AC 20kWh White VZLTE 200 1008 Inverter AC GW EP 1 200 ...

Page 114: ... 200 1001 Inverter DC GW EP 1 200 1007 Transformer NFT EP 1 350 1007 Enclosure Assembly 10kWh TB White VZ EP 1 350 0505 Enclosure Assembly 5kWh TB White EP 1 200 1032 Battery 2 5kWh TB EP 6 200 1033 BMS TB EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1057 EP PP TB GW DC 20kWh White VZ 200 1001 Inverter DC GW EP 1 200 1007 ...

Page 115: ... 200 1008 Inverter AC GW EP 1 200 1007 Transformer NFT EP 1 350 1007 Enclosure Assembly 10kWh TB White VZ EP 1 350 0505 Enclosure Assembly 5kWh TB White EP 1 200 1032 Battery 2 5kWh TB EP 6 200 1033 BMS TB EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1060 EP PP TB GW AC 20kWh White VZ 200 1008 Inverter AC GW EP 1 200 1007 ...

Page 116: ... 200 1001 Inverter DC GW EP 1 200 1007 Transformer NFT EP 1 350 1008 Enclosure Assembly 10kWh TB White ATT EP 1 350 0505 Enclosure Assembly 5kWh TB White EP 1 200 1032 Battery 2 5kWh TB EP 6 200 1033 BMS TB EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1069 EP PP TB GW DC 20kWh White ATT 200 1001 Inverter DC GW EP 1 200 100...

Page 117: ... 200 1008 Inverter AC GW EP 1 200 1007 Transformer NFT EP 1 350 1008 Enclosure Assembly 10kWh TB White ATT EP 1 350 0505 Enclosure Assembly 5kWh TB White EP 1 200 1032 Battery 2 5kWh TB EP 6 200 1033 BMS TB EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1072 EP PP TB GW AC 20kWh White ATT 200 1008 Inverter AC GW EP 1 200 100...

Page 118: ...s 200 1001 Inverter DC GW EP 1 200 1007 Transformer NFT EP 1 350 1009 Enclosure Assembly 10kWh TB White RGR EP 1 350 0505 Enclosure Assembly 5kWh TB White EP 1 200 1032 Battery 2 5kWh TB EP 6 200 1033 BMS TB EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1081 EP PP TB GW DC 20kWh White Rogers 200 1001 Inverter DC GW EP 1 200...

Page 119: ...s 200 1008 Inverter AC GW EP 1 200 1007 Transformer NFT EP 1 350 1009 Enclosure Assembly 10kWh TB White RGR EP 1 350 0505 Enclosure Assembly 5kWh TB White EP 1 200 1032 Battery 2 5kWh TB EP 6 200 1033 BMS TB EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1084 EP PP TB GW AC 20kWh White Rogers 200 1008 Inverter AC GW EP 1 200...

Page 120: ... 200 1001 Inverter DC GW EP 1 200 1007 Transformer NFT EP 1 350 100A Enclosure Assembly 10kWh TB White Wifi EP 1 350 0505 Enclosure Assembly 5kWh TB White EP 1 200 1032 Battery 2 5kWh TB EP 6 200 1033 BMS TB EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1093 EP PP TB GW DC 20kWh White WiFi 200 1001 Inverter DC GW EP 1 200 1...

Page 121: ... 200 1008 Inverter AC GW EP 1 200 1007 Transformer NFT EP 1 350 100A Enclosure Assembly 10kWh TB White Wifi EP 1 350 0505 Enclosure Assembly 5kWh TB White EP 1 200 1032 Battery 2 5kWh TB EP 6 200 1033 BMS TB EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1096 EP PP TB GW AC 20kWh White WiFi 200 1008 Inverter AC GW EP 1 200 1...

Page 122: ...E 200 1001 Inverter DC GW EP 1 200 1007 Transformer NFT EP 1 350 100B Enclosure Assembly 10kWh TB White LTE EP 1 350 0505 Enclosure Assembly 5kWh TB White EP 1 200 1032 Battery 2 5kWh TB EP 6 200 1033 BMS TB EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1105 EP PP TB GW DC 20kWh White VZLTE 200 1001 Inverter DC GW EP 1 200 ...

Page 123: ...E 200 1008 Inverter AC GW EP 1 200 1007 Transformer NFT EP 1 350 100B Enclosure Assembly 10kWh TB White LTE EP 1 350 0505 Enclosure Assembly 5kWh TB White EP 1 200 1032 Battery 2 5kWh TB EP 6 200 1033 BMS TB EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1108 EP PP TB GW AC 20kWh White VZLTE 200 1008 Inverter AC GW EP 1 200 ...

Page 124: ... 200 1001 Inverter DC GW EP 1 200 1007 Transformer NFT EP 1 350 1002 Enclosure Assembly 10kWh UVC White VZ EP 1 350 0504 Enclosure Assembly 5kWh UVC White EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1123 EP PP ZN GW DC 20kWh UVC White VZ 200 1001 Inverter DC GW EP 1 200...

Page 125: ... VZ 200 1008 Inverter AC GW EP 1 200 1007 Transformer NFT 1 350 1002 Enclosure Assembly 10kWh UVC White VZ EP 1 350 0504 Enclosure Assembly 5kWh UVC White EP 1 200 1003 Battery 2 5kWh ZN EP 6 200 1004 BMS ZN EP 1 210 1001 Instruction Manual English PP2 EP 1 Sales Kit SKU Display Name Component SKU Component Description Qty 100 1126 EP PP ZN GW AC 20kWh UVC White VZ 200 1008 Inverter AC GW EP 1 200...

Page 126: ...126 Installation Manual Appendix Wiring Diagram 5 3 POWERPOD 2 WIRING DIAGRAM WITH ATS Whole Home Backup with Standalone Meter Kohler ATS and no Heavy Loads ...

Page 127: ...n Note the inverter has self protection derating at high ambient temperatures Overload Operation Inverter will restart itself if overload protection happens The preparation time for restarting will be longer and longer max one hour if overload protection repeats Take the following steps to stop the inverter from turning off from overload Reset Overload Protection Decrease backup load power within ...

Page 128: ...tion Included Charge Battery from AC Yes THD current 5 Operating Standy Power Consumption 40 W Operation Temperature Range 20 to 55 C power derated above 40 C Operation Humidity 10 to 90 Non condensing Thermal Management Forced convection Noise Level Maximum 45 dBA Output AC BACKUP LOAD AC Backup Power Output From Battery DOD 95 4500 6750 9000 VA 4500 6750 8600 VA 4500 6750 7600 VA 4500 6750 7000 ...

Page 129: ... Back up default Yes Self Consumption Yes Prioritized Charging from Renewables Yes Grid Support Zero Export Yes Time Of Use Grid Export Yes Genset Integration No Grid Support Demand Response Yes Home current monitoring L1 L2 CTs Yes Over Current Protection Yes Short Protection Yes Over Voltage Protection Yes Battery Reverse Polarity Protection Yes ADDITIONAL AND OPTIONAL FEATURES Supported Communi...

Page 130: ... Current 50 ADC Maximum Charge Current 60 ADC Maximum Discharge Current 60 ADC Continuous Charge Power Nominal 5120 7700 9600 W 5120 7700 8600 W 5120 7600 7600 W 5120 7000 7000 W 5120 6000 6000 W 5000 5000 5000 W Continuous Discharge Power Nominal 5120 7700 9600 W 5120 7700 8600 W 5120 7600 7600 W 5120 7000 7000 W 5120 6000 6000 W 5000 5000 5000 W Maximum Charge Power Nominal 6150 7700 10 240 W 61...

Page 131: ...imensions W H D 10 kWh assembled battery enclosure 27 5 x 50 x 9 700mm x 1270mm x 230mm Dimensions W H D 5 kWh assembled battery enclosure 27 5 x 50 x 9 700mm x 1270mm x 230mm Weight BMS 33 lb 15 kg Weight battery only 1 module 62 lb 28 kg Weight Total batteries 400 lb 180 kg 535 lb 240 kg 705 lb 320 kg Warranty Battery 10 years Appendix Technical Specifications AC ...

Page 132: ...5 A 240 V 0 to 20 8 A 240 V AC Circuit Breaker grid No Ground Fault Isolation Detection Integrated Detection Included Charge Battery from AC Yes THD current 5 Operating Standy Power Consumption 40 W Operation Temperature Range 20 to 55 C power derated above 40 C Operation Humidity 10 to 90 Non condensing Thermal Management Forced convection Noise Level Maximum 45 dBA Output AC BACKUP LOAD Rated AC...

Page 133: ...2 5 12 5 12 5 12 5 A 12 5 12 5 A Maximum PV Panel I sc Allowed 15 2 15 2 15 2 15 2 A 15 2 15 2 A PV Switch Yes 8P Reverse Polarity Protection Yes Ground Fault Isolation Detection Integrated detection included DC INPUT BATTERY Rated Charge Discharge 50 A 50 A Maximum Charge Discharge 50 A 50 A DC Voltage Range 80 495 Battery Capacity Range 10 to 20 kWh Battery Types Supported Lithium ion LFP DC Cir...

Page 134: ...12 External option Arc Fault Protection Type 1 for NEC 2011 690 11 compliance Yes Insulation Resistance Detection Yes Revenue Grade Data ANSI C12 Optional NEMA 3R Enclosure Standard Dimensions W H D inverter 16 3in x 31 1in x 6 9in 415mm x 791mmx 175mm Dimensions W H D auto transformer 13 6in x 10 9in x 6 9in 345mm x 280mmx 175mm Weight inverter 70 5lb 32kg Weight auto transformer 50lb 22kg Warran...

Page 135: ...timum Operating Temperature Range 0 C to 30 C 32 F to 86 F See detailed temperature guidelines below Do not install outdoors in climates where the temperature drops below 0 C 32 F for extended periods Do not install in direct sunlight Charge Temperature 0 C to 55 C Discharge Temperature 20 C to 55 C Communication Interface RJ 45 RS 485 Power Switch ON OFF Yes Cycles For Daily Cycle Applications Se...

Page 136: ... frequency are applicable only when the fundamental voltage is greater than 30 of the nominal voltage Time frame Steady state Measurements Transient Measurements Parameter Minimum measurement accuracy Measurement window Range Minimum measurement accuracy Measurement window Range Voltage RMS 1 Vnom 10 cycles 0 5 p u to 1 2 p u 2 Vnom 5 cycles 0 5 p u to 1 2 p u Frequencyb 10 mHz 60 cycles 50 Hz to ...

Page 137: ...mmission the system by following the instructions on service shut down warning located in section 2 SAFETY WARNINGS 2 Contact Electriq Power Customer Support at support electriqpower com Appendix Decommissioning 5 8 DECOMMISSIONING ...

Page 138: ...updated list visit www electriqpower com resources NAME MANUFACTURER MODEL TECHNICAL DESCRIPTION MARK s OF CONFORMITY Battery BMS Main Enclosure ZHONGNENG LBS102100A B02 Battery LFP 102 4VDC 100Ah with BMS and Enclosure cETLus Battery Add on Enclosure ZHONGNENG 200 1006 Battery LFP 51 2VDC 100Ah with Enclosure cETLus Battery BMS Main Enclosure TOPBAND TB103100F T105A_UL Battery LFP 102 4VDC 100Ah ...

Page 139: ...3100A LBS205100A Inverter includes models GW7600A ES GW7600 A BP PowerHub includes model PowerHub 2 Limited Warranty Ten Year Energy Capacity Coverage Electriq warrants that the PowerPod 2 s energy capacity as measured at the DC terminals will 1 be at least 2 56kWh pack at the time the Warranty begins the Initial Capacity and 2 remain at least 70 of the Initial Capacity during the first 10 years o...

Page 140: ...d 2 The installation must follow the manual conform to all local state and other applicable building and safety codes be completed with a permit issued by the local authority having jurisdiction and be successfully commissioned For a list of certified installers contact us Temperature and Environment Although the ESS is designed to be rugged it contains electronics chemistries and other components...

Page 141: ...elieve your use at your home may be for a more dedicated business purpose or your utility provides you power under a commercial tariff contact us for further clarification Use of the PowerPod 2 for other than personal domestic use shall void this Warranty Abuse Misuse or Modification If Electriq identifies abuse or misuse that is the basis for the claim the Warranty may be limited or voided Furthe...

Page 142: ...TIONS AND DISCLAIMERS THIS LIMITED WARRANTY IS THE ONLY EXPRESS WARRANTY MADE IN CONNECTION WITH YOUR POWERPOD 2 ANY OTHER WARRANTIES REMEDIES AND CONDITIONS WHETHER ORAL WRITTEN STATUTORY EXPRESS OR IMPLIED INCLUDING ANY WARRANTIES OF MERCHANTABILITY AND FITNESS FOR PURPOSE PATENT WARRANTIES AND ANY WARRANTIES AGAINST LATENT OR HIDDEN DEFECTS ARE EXPRESSLY DISCLAIMED IF SUCH WARRANTIES CANNOT BE ...

Page 143: ...y you must follow the link under warranty at the Electriq website https electriqpower com warranty and provide the required information To expedite your claim be prepared to provide A description of the problem you are experiencing and when you first noticed it Pictures of the installation and any other data you have about the PowerPod 2 Your contact information including preferred phone and email...

Page 144: ...products as well as claims arising after the Warranty has expired Alternatively you may opt out of arbitration as further described below The AAA Consumer Arbitration Rules will apply We will pay all AAA fees for any arbitration but if we prevail in the arbitration we may seek arbitration costs from you The arbitration will be held in a location most convenient to your residence To learn more abou...

Page 145: ...rranty electriqpower com Right To Modify Electriq reserves the right to modify this Warranty from time to time and on a case by case basis without any liability or obligation to other warranty holders PowerPod 2 Limited Warranty ...

Page 146: ...served All specifications are subject to change without prior notice Electriq Power and the Electriq Power logo are trademarks of Electriq Power Inc All other trademarks are the property of the respective owners Assembled by Electriq Power Inc 1937 Davis St Unit A1 San Leandro CA 94577 1 833 GO BATTERIES ...