background image

                                                   ECO _30/60_P   

Important Notice: 

Please read this manual carefully before installing or operating BESS. Be sure to keep this manual for reference in the future. 

 

The battery of the future

Energy Storage Solution

c

e

o

/ecoess.co.uk

Mobile    : + 44  (0) 7729636318

Landline : + 44 (0)116 366 9980

Website : www.ecoess.co.uk

E-mail     : [email protected]

72- Evington Road,

LE2 1HH Leicester, UK

Battery Energy Storage System

CO

The battery of the future

Energy Storage Solution

c

e

o

Installation Manual & Commissioning

Summary of Contents for 30 P Series

Page 1: ...in the future The battery of the future Energy Storage Solution c e o ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK Battery Energy Storage System CO The battery of the future Energy Storage Solution c e o Installation Manual Commissioning ...

Page 2: ...ary 6 3 1 BESS Components and dimensions 7 3 2 Delivery list 10 4 Installation Preparation 11 4 1 installation process 11 4 2 Installation Tool 11 4 3 Environmental requirements for installation site 12 4 4 Site installation foundation 12 4 5 Transportation of outdoor energy storage cabinet 15 5 Fixed 21 5 1 fixing of outdoor energy storage cabinet 21 6 wiring 22 6 1 Wiring of outdoor energy stora...

Page 3: ...ated operators only 1 4 Preservation notes This manual contains important information about the installation of outdoor energy storage cabinets Please read this manual carefully before operation Please strictly follow the operation methods described in the manual Otherwise it may cause equipment damage personal injury or death and property loss This manual shall be kept properly so that the operat...

Page 4: ...educe the Risk of injury read all instruction RISQUE D éTINCELLES POUR RéDUIRE LE RISQUE DE BLESSURES LISEZ TOUTES LES INSTRUCTIONS WARNING AVERTISSEMENT HAZARDOUS VOLTAGE AUTHORISED ACCESS ONLY ACCèS AUTORISé SEULEMENT DES TENSIONS DANGEREUSES CAUTION Risk of electric shock from energy stored in capacitor Do not remove cover until 5 minutes after disconnecting all sources of supply ATTENTION RISQ...

Page 5: ...cm2 Working Distance 45 7 cm Arc Flash Boundary 0 42 m Non melting or untreated natural fiber long sleeve shirtand long pants SHOCK PROTECTION Shock Hazard Exposure 907 Vdc Shock Hazard when covers removed Limited Approach Boundary 1 07 m Restricted Approach Boundary 0 3 m PPE Glove Class 0 V Rating 1500 Vdc Equipment ID Arc Flash Shock Hazard Appropriate PPE Required DANGER FLASH PROTECTION LEVEL...

Page 6: ...During wiring two or more operators are not allowed to connect one wire at the same time During the installation process each completed item must be inspected once and cross inspection is required The equipment must be installed in sequence and no steps can be skipped Isolation belt must be set during installation to prevent irrelevant personnel from entering the site 2 2 safety warning Danger an ...

Page 7: ...ture energy structure Bess includes battery BMS DCDC PCs MPPT STS auxiliary power system fire protection system air conditioning system and grounding system Batteries and BMS systems are used to store electrical energy PCs is used for AC DC conversion DCDC is used for voltage conversion MPPT is used for photovoltaic charging STS is used for parallel and off network switching The auxiliary power sy...

Page 8: ... i l r o t a c i d n i 1 r e n o i t i d n o c r i a 2 3 Emergency stop button Picture 3 2 BESS inside front Item No Name Remark M M B 1 ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 9: ... e m C A 9 l a n o i t p O r e t e m d a o L 0 1 l a n o i t p O r e k a e r b t i u c r i c C A 1 1 r e k a e r b t i u c r i c d a o L 2 1 Picture 3 3 BESS inside after Item No Name Remark 1 Photovoltaic circuit breaker optional n o i t c e t o r p g n i n t h g i l 2 ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Roa...

Page 10: ...ht side view outdoor energy storage 1861 5 1267 1835 2300 ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK BESS measure Name W mm D mm H mm W kg ...

Page 11: ...rgy storage cabinet 1 2 Documents user manual 1 3 Installation manual 1 BESS installation guide 4 Air conditioning manual 1 5 Accessories Expansion bolt group 4 Fixed outdoor energy storage cabinet 6 Others Key to the door 3 ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 12: ...pcs Drilling on the ground Place expansion screw M12 150 3 Expansion screw 4 pcs Fixed cabinet 4 Hammer 1 pcs Tap the expansion bolt into the fixed 5 Socket tool 1 pcs M12 sleeve used to fasten expansion bolts M8 sleeve the terminal block is fixed 6 Insulated torque wrench 1pcs Check and mark the torque value 7 Adjustable wrench 1 pcs Tighten the bolts for cable connection 8 Diagonal pliers 1pcs C...

Page 13: ...er 4 4 for specific requirements Others do not install and debug Bess when it rains 4 4 Site installation foundation The outdoor energy storage cabinet will be fixed on the concrete foundation Please build the installation foundation in advance according to the figure below Picture 4 1 Site installation foundation Installation basic requirements r e t e m a r a P y r o g e t a C o N m e t I 1 Mini...

Page 14: ...urface of a single cabinet 2 Site requirements for the installation of two outdoor energy storage cabinets Picture 4 3 Installation diagram 2 pcs flood level in History 3 Bearing capacity of mounting base Bearing capacity 25 t s r a e y 0 2 e f i l e c i v r e s c i s a B 4 5 Basic levelness 3mm ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ec...

Page 15: ...ltiple outdoor energy storage cabinets Picture 4 4 installation diagram Multiple pcs Note W represents the width of the total mounting surface of multiple cabinets and D represents the depth of the total mounting surface of multiple cabinets ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 16: ... to the right side of the cabinet body is 50mm Slowly lift the shift fork put down the shift fork after the product reaches the required position and remove the base The entry position of the fork is the back of the cabinet without air conditioner Forklift requirements 2 Forklift specification The weight of outdoor energy storage cabinet is about 2 3t and an electric forklift with rated load 3 5t ...

Page 17: ...klift with a movable fork Manual forklifts are not recommended When handling with forklift protection shall be provided to avoid damage to the equipment surface When using a forklift to transport use belts safety ropes to fix the cabinet on the forklift ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicest...

Page 18: ... 2 Transportation plan 2 front access Transport option 1 front insert 1 Remove the fork hole cover plate and confirm the fork hole Item No Name 1 2 3 4 Forklift hole baffle e l o h t f i l k r o F 5 ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 19: ...away from the air conditioner so that the distance between the fork and the rear side of the cabinet is 50mm m m 0 5 t s a e l t a d n e t x E 2 ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 20: ...rk hole cover plate and confirm the fork hole Item No Requirements 1 2 Forklift hole baffle e l o h t f i l k r o F 3 2 Fork inlet ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 21: ...ent to the air conditioner to make the distance between the fork and the rear side of the cabinet 50mm m m 0 5 t s a e l t a d n e t x E 2 ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 22: ...n and quantity of expansion screws Ground drilling align the percussion drill with the center of the fixed installation base hole and drill according to the following fixed hole positions 4 holes on both sides of the equipment with a depth of 120mm Note it is necessary to drill holes before placing the outdoor energy storage cabinet because the external trunk will block the percussion drilling eco...

Page 23: ...t washer and tighten it with a sleeve and use a torque wrench to confirm the torque 96 N M Picture 5 2 Installation view 6 wiring For the cabling of this Bess system please connect all cabling correctly according to the instructions in this chapter ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK...

Page 24: ...d below Item No Switch Name Type On off judgment application program 1 Main distribution miniature circuit breaker Auxiliary circuit 2 Air conditioning miniature circuit breaker Air conditioning circuit 3 AC molded case circuit breaker AC circuit 4 Customer load molded case circuit breaker Customer load circuit 5 Lightning protection micro break 6 Lightning protection micro break 7 Integrated box ...

Page 25: ...circuit breaker front side Picture 6 2 miniature circuit breaker back side ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 26: ...e cabinet Danger Before wiring make sure that all switches are turned off Protective equipment must be worn when connecting goggles and safety gloves must be worn ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 27: ...anged in the electrical room The details as follows AC cable routing As shown in the figure below remove the 3pcs m5 screw in the red circle and take out the baffle Picture 6 6 Wiring position Front side ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 28: ...fasten it in the order shown in the figure below The bolt is M8 16 bolt group and the torque is required to be 10 1 N M Picture 6 8 Position wiring diagram front side ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 29: ...e connection interface Item No Interface definition Remark a e n i l C A 1 b e n i l C A 2 c e n i l C A 3 N e n i l C A 4 ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 30: ...s a three phase three wire system which can adopt different topological grids When BESS is connected to different topology grids it is recommended to install different devices The specific installation should be subject to the requirements of local power grid It is recommended to install different devices according to different grid topologies when the power grid is an IT system it is recommended ...

Page 31: ... Residual Current device L1 L2 L3 U V W N PE Battery DC AC ESS U V W N PE Battery DC AC ESS U V W N PE Battery DC AC ESS IM U V W N PE Battery DC AC N ESS L1 L2 L3 RCD U V W N PE Battery DC AC ESS RCD U V W N PE Battery DC AC ESS RCD ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Page 32: ...apter6 Item No position h c t i w s e c n a n e t n i a M 1 g n i r i w V P d a o l C A 2 g n i t u o r e l b a c g n i d n u o r G 3 g n i r i w e l b a c n o i t a c i n u m m o C 4 Bolt torque check U V W N PE Battery DC AC N PE ESS L1 L2 L3 RCD U V W N PE Battery DC AC ESS RCD U V W N PE Battery DC AC ESS RCD ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co ...

Page 33: ...cuit MCB Open main circuit breaker Close cabinet door Turn on the total secondary power supply MCB Turn on the air conditioner MCB Close the button of the intearated box ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK Ensure that all bolts are tightened according to the following requirements Af...

Page 34: ...Turn on the BMS DC circuit breaker Turn on the BMS maintenance switch Open PCS circuit breaker ecoess co uk Mobile 44 0 7729636318 Landline 44 0 116 366 9980 Website www ecoess co uk E mail aazib ecoess co uk 72 Evington Road LE2 1HH Leicester UK ...

Reviews: