background image

http://www.tulsawinch.com

SEL-0061-001

                     

REV 0 

July 2020

 

TABLE OF CONTENTS 

SAFETY NOTES .......................................................................................................................... 2

 

INTRODUCTION AND THEORY OF OPERATION ........................................................................ 3

 

HYDRAULIC SCHEMATIC........................................................................................................... 4

 

MAINTENANCE AND SERVICE ................................................................................................... 5

 

WIRE ROPE ............................................................................................................................... 7

 

DISASSEMBLY ........................................................................................................................... 8

 

ASSEMBLY ................................................................................................................................. 9

 

SERVICING THE MOTOR ......................................................................................................... 10

 

SERVICING THE BRAKE........................................................................................................... 11

 

SERVICING THE PLANETARY SETS ......................................................................................... 13

 

TROUBLESHOOTING ............................................................................................................... 14

 

TORQUE SPECIFICATIONS CHART.......................................................................................... 15

 

BILL OF MATERIAL.................................................................................................................. 16

 

EXPLODED ISOMETRIC ASSEMBLY DRAWING ....................................................................... 19

 

Summary of Contents for TWG TULSA WINCH 1200W

Page 1: ...AND THEORY OF OPERATION 3 HYDRAULIC SCHEMATIC 4 MAINTENANCE AND SERVICE 5 WIRE ROPE 7 DISASSEMBLY 8 ASSEMBLY 9 SERVICING THE MOTOR 10 SERVICING THE BRAKE 11 SERVICING THE PLANETARY SETS 13 TROUBLESHO...

Page 2: ...on hoists are not designed to hold the rated load of the hoist You must keep at least five 5 wraps of cable on the drum to ensure that the cable doesn t come loose Stay clear of suspended loads and o...

Page 3: ...e brake When the load comes to a stop the cam clutch locks up and the brake prevents the load from moving During payout a brake valve is used to prevent the load from moving faster than desired This b...

Page 4: ...4 HYDRAULIC SCHEMATIC...

Page 5: ...month API RP 2D recommends a pre use inspection and an annual 12 month inspection based on average use over a quarter For hoists in moderate use more than 10 but less than 50 hours per month API RP 2D...

Page 6: ...ll resulting in property damage personal injury or death The hydraulic system should use only high quality hydraulic fluid from reputable suppliers These oils should contain additives to prevent foami...

Page 7: ...the side plate See Fig 3 Fill the gearbox with 1 00 quart of EP 90 oil Remove the pipe and elbow then replace the plug Item 33 See the Oil Chart on page 6 of this manual for the recommended oil type a...

Page 8: ...place the bearing and seal Item 7 4 7 Remove the thrust washer Item 6 and input sun gear Item 8 from the input planet gearset Item 36 Inspect for damage and replace if needed 8 Remove the input planet...

Page 9: ...place Install the thrust washer into the output gearset Item 4 and then insert the output sun gear Item 16 The slot in the sun gear must be installed facing the output shaft 10 Install the input plan...

Page 10: ...hole located on the side of the valve to make sure it is not obstructed Also inspect the o rings Item 7 10 for damage and replace if necessary 4 Remove the fitting Item 60 and inspect the check valve...

Page 11: ...brake housing Item 21 is removed from the hoist examine the journal on the brake housing where the seal Item 7 4 runs for wear If severely worn replace the brake housing 9 Carefully disassemble the b...

Page 12: ...in a horizontal position coat the bottom of each spring with chassis lube to keep it in position 17 Coat the new o ring Item 7 3 with light oil and install it into the groove on the brake cover Item 2...

Page 13: ...d replace if necessary 5 On output planet gearsets note that two bearings with a spacer between them are used 6 Before reassembly be sure to insert the thrust plate into the carrier 7 To reassemble be...

Page 14: ...proper lifting Increase the relief pressure setting 2 The load being lifted may be more than the winches rating Verify weight and reduce the load or re rig it to increase mechanical advantage Hoist u...

Page 15: ...7 45 106 80 64 1 2 20 85 64 51 120 90 72 9 16 12 109 82 65 153 115 92 9 16 18 122 91 73 172 129 103 5 8 11 150 113 90 212 159 127 5 8 18 170 128 102 240 180 144 3 4 10 266 200 160 376 282 226 3 4 16 2...

Page 16: ...31 DRUM 16 38 FLANGE 9 75 BARREL 5b 1 42128 DRUM 15 00 FLANGE 9 75 BARREL 5c 1 42510 DRUM 13 75 FLANGE 9 75 BARREL 5d 1 42413 DRUM 16 38 FLANGE 10 63 BARREL 5e 1 43171 DRUM 14 00 FLANGE 10 63 BARREL 6...

Page 17: ...E 36b 6 3 30484 BEARING 36b 7 6 28771 WASHER 36c 1 4139 INPUT GEARSET FOR 1241W 36c 1 1 41766 CARRIER 36c 2 3 41763 PLANET GEAR 36c 3 3 41760 PLANET PIN 36c 4 3 41715 RETAINING RING 36c 5 1 41769 THRU...

Page 18: ...1 12208 BUSHING 58a 1 42022 SINGLE SPEED GEAR MOTOR 58b 1 42023 SINGLE SPEED GEAR MOTOR 58c 1 42521 SINGLE SPEED GEAR MOTOR 58d 1 43126 SINGLE SPEED GEAR MOTOR 58e 1 42021 SINGLE SPEED GEAR MOTOR CONT...

Page 19: ...19 EXPLODED ISOMETRIC ASSEMBLY DRAWING TWG PO Box 1130 Jenks OK 74037 1130 USA Phone 918 298 8300 www dovertwg com...

Reviews: